Laserfiche WebLink
E <br />SWRCB, January 2002 <br />0 <br />s.aco n�wi ♦ IM14V VT 11 Tnrl TFSTING <br />Page _ of <br />7. UtVLERi D1SFUNSEK 1- ------ - <br />Test Method Developed By: L UDC Manufacturer I Industry Standard X Professional Engineer <br />Other (Specify) <br />Test Method Used: 7 Pressure Vacuum X Hydrostatic <br />Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator <br />UDC #1 UDC # <br />UDC Manufacturer: Bravo <br />Equipment Resolution: .002 <br />UDC# <br />UDC# <br />UDC Material: <br />Coated Steel <br />UDC Depth: <br />9" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Enters from bottom <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Enters from bottom <br />Condition of UDC prior to <br />testing: <br />Dry <br />Portion of UDC Tested' <br />Water Level 7 %z" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />Yes <br />Turbine shutdown response time <br />Not Alarmed <br />Is system programmed for fail- <br />safe shutdown?* <br />Yes <br />Was fail-safe verified to be <br />operational?* <br />No <br />Wait time between applying <br />water and starting test <br />5 Minutes <br />Test Start Time: <br />9:25 <br />Initial Reading (Ri): <br />.001 <br />Test End Time: <br />9:55 <br />Final Reading (RF): <br />.001 <br />Test Duration: <br />30 Minutes <br />Chane in Reading RF-Ri: <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Was sensor removed for testin ? <br />No <br />Was sensor properly replaced and <br />verified functional after testing? <br />NA <br />Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />