My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO 2005 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:35 AM
Creation date
11/2/2018 9:17:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2012
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\COMPLIANCE INFO 2005 - 2012.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2012
QuestysRecordDate
1/24/2018 7:33:04 PM
QuestysRecordID
3772154
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r� <br /> SWRCB.January 2002 <br /> Page 3 of 7 <br /> Job: Estes Trucking <br /> 7611 S. Airport Way <br /> Stockton,CA 95206 <br /> Date: 09/22/2010 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: [ I Piping Manufacturer [X] Industry Standazd [ ]Professional <br /> Engineer <br /> [ ]Other(Sped) <br /> Test Method Used: [X] Pressure [ ] Vacuum [ ] Hydrostatic <br /> [ ]Other(Specify) <br /> Test Equipment Used: Pressure Gauge__ Equipment Resolution: 0.20 <br /> Piping Run #1 Piping Run Piping Run Piping Run Piping Run <br /> rPi i�ngMaterial: Fiberglass ----- <br /> F'ipi Manufacturer:_—_ A. O.Smith —_ _—_--_— - -- -- ---- <br /> �in Din.— ameter: _ 3—, and 2-- ---- -----------.— ----- ---- <br /> Len th of Piping Run: 12 ft. ___ __-- —_ -----.---- --------- <br /> Product Stored: Diesel -- <br /> Method and location of 3 x 2 Boot <br /> piping-run isolation: — <br /> Wait time between applying <br /> pressure/vacuum/water and 5—Minutes - <br /> starting test: <br /> Test Start Time: 10007-A—M <br /> Initial Reading(RI) 3 P.S.I. <br /> i est End Time: 11:00 A. M. <br /> Final Reading(R): 5 P.S.I. <br /> Test Duration: I HOUR <br /> Change in Reading(Rf-RI) -0- <br /> Pass/Fail Threshold or -0- <br /> Criteria: <br /> Test Result: Irl Pass 1-1 Fail I I Pass I I Fail I I Pass I I Fail Pass I I I I Pass I I Fail <br /> Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.