Laserfiche WebLink
11/09/93 04:41 <br />**. <br />'$i14 454 9800 <br />MAAJESTIC TECH <br />7.0 WORK PLAN <br />Z008 <br />i, soil Samples will be taken according to the specifications set <br />forth in the Chemical Aquisition Data Plan and sent to the <br />prescribed laboratory. ae directed by the Project Manager. The <br />Project anager will be acting on instructions from the County of <br />Orange•/ � <br />2. Any open trenches or unsafe work areas will be barricaded with red <br />plastic fences Arid will be posted with warning signs. At no time <br />will Any roads or streets be blocked. <br />3. when samples results are returned and directions are given by the <br />Project ManaSer.the trenches and holes in work areas will be <br />backfilled according to work specifications- The area shall be <br />repaved to match existing Surrounding conditions. <br />U. Removal of tanks on this site will be performed according to <br />specifications set forth in work plan. <br />TANK REMOVAL PLAN <br />1. Set up barricades and traffic control. if required. <br />2. Make sure there are no sources of ignition with 100 feet of the <br />operations, including -smoking. welding. cutting, and all other <br />sources of ignition. <br />3, Inquire as to what tank contained. date of Installation, and date <br />last used. <br />a. Obtain information, such AS approximate age and size of tanks to be <br />removed. <br />5. Remove. by vacuum pumping, all liquids from the tank and all <br />connecting lines into a vacuum truck. <br />6. Disconnect all Sines, vent outlets, remove or plug, as required. <br />