My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALEXANDRIA
>
6803
>
2300 - Underground Storage Tank Program
>
PR0231519
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:36 AM
Creation date
11/2/2018 9:26:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0231519
PE
2381
FACILITY_ID
FA0004026
FACILITY_NAME
SWENSON PARK GOLF COURSE
STREET_NUMBER
6803
STREET_NAME
ALEXANDRIA
STREET_TYPE
PL
City
STOCKTON
Zip
95207
APN
09711024
CURRENT_STATUS
02
SITE_LOCATION
6803 ALEXANDRIA PL
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALEXANDRIA\6803\PR0231519\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/03/93 04:42 V714 454 9800 MAJESTIC TECH Z009 <br />7• <br />Triple wash using a detergent and a 3,000 PSI pressure washer, and <br />remove wash water by vacuum Pump into a vacuum Truck. <br />g, Demonstrate to permitting authority that all hazardous substances <br />that were in the tanks have been removed and will be properly <br />disposed of, <br />9. Purge the tanks with 30 lbs. per 1,000 gallons of dry ice until it <br />is non -explosive. This will be double-checked by an explosive <br />meter. <br />10. Excavate as required to remove tanks. <br />Si. When required governing authorities are on site, then tanks shall <br />be removed from the ground. <br />12. Demonstrate to permitting authorities that there has been no <br />significant soil contamination resulting from adischarge inthe <br />area surrounding the underground tank or facility. <br />15. Soil and ground water samples are to be taken as required. Samples <br />are to be analyzed by an approved EPA and DOHS laboratory as <br />required by the Project Manager. <br />14. If assessment indicated environmental contamination, the "LEAD" <br />agency's authority will provide direction for Clean-up of the site. <br />15. Steel tanks will be destroyed and cut-up for scrap. A picture of <br />destruction will be provided,and a tracking destruction form will <br />be provided. <br />16. protective clothing will be on site to be used as required. All <br />workers have Cal -OSHA 29 CFR 110 + 13U training. and at least one <br />employee has completed the First Aid/CPR training course. <br />17. Each employee is recieving instructions per SH -198 in a mandatory <br />"tailgate training" session held every week. No employee will be <br />allowed to work under the influence of alcohol or drugs; per the <br />"Drug -Free Workplace" guidelines that each employee has signed for. <br />
The URL can be used to link to this page
Your browser does not support the video tag.