My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALMOND
>
265
>
2300 - Underground Storage Tank Program
>
PR0522539
>
REMOVAL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:37 AM
Creation date
11/2/2018 9:27:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2004
RECORD_ID
PR0522539
PE
2381
FACILITY_ID
FA0015354
FACILITY_NAME
ALMOND NORTH LLC
STREET_NUMBER
265
Direction
E
STREET_NAME
ALMOND
STREET_TYPE
DR
City
WOODBRIDGE
Zip
95258
APN
06206014
CURRENT_STATUS
02
SITE_LOCATION
265 E ALMOND DR
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALMOND\265\PR0522539\REMOVAL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. GENERAL INFORMATION: <br /> 1. Obtain an EPA Site Number from the Department of Toxic Substances Control(800)61-TOXIC for temporary <br /> hazardous waste removal activities associated with underground storage tank(UST)removals. <br /> 2. Disposal Information: SIC EHD's Underground Storage Tank Disposition Tracking Record(UST Tracking Record, <br /> page 10)shall accompany each tank removed from site. Tank(s)will be issued an identification number which Elius <br /> representative will note on the UST Tracking Record. Contractor will affix same identification number onto tank end <br /> using fluorescent spray paint. Contaminated tanks and/or piping are to be transported under Hazardous Waste <br /> Manifest by a state registered hazardous waste hauler. <br /> 3. Contractor to Provide: Combustible/Flammable gas detector(to verify the Lower Explosive Limit(LEL)atmosphere <br /> and oxygen level of tank prior to lifting from excavation),adequate number(s)and appropriate type(s)of fire <br /> extinguisher(s),barriers to secure the area as necessary to minimize traffic and pedestrian interference,and fluorescent <br /> spray paint to affix tank identification numbers. It shall be the project manager's responsibility for compliance with all <br /> health&safety regulations and requirements,which shall be strictly adhered to at all times during the course of the <br /> closure activities. <br /> 4 The EHD permit shall be on site during tank excavation and removal. <br /> 5. Any changes in this document shall be approved by EHD prior to initiating work. <br /> 6. Closure-in-Place: If Closure-in-Place is the suggested method of abandonment,complete form <br /> EH 23 039 and submit written approval from the local Fire Department. <br /> 7. Temporary Closure: If Temporary Closure is the suggested method of abandonment,complete <br /> and submit this form and a written approval from the local Fire Department. <br /> s. The following documentation shall be submitted within 30 days of the tank removal date: <br /> a) Analytical results,mailed directly from laboratory to EHD,including a chain of custody and quality assurance <br /> and quality control(QA&QC). <br /> b) UST Tracking Record Sheet(s)and/or Tank Hazardous Waste Manifest(s). <br /> C) Tank Closure Certification Form(DTSC form 1249). <br /> d) Hazardous Waste Manifests for piping,rinsate,residual fuel,or waste oil receipt. <br /> e) Submit the backfill excavation certificate as required by San Joaquin County and the incorporated City <br /> Building Departments. This report will be referred to the appropriate agency for their review. <br /> A site which has had UST(s)removed,shall not be considered for fmal closure until the above items are <br /> submitted for review. <br /> Ill. SITE MITIGATION: <br /> 1. In the event contamination is observed,confirmed or suspected as a result of a leaking UST system it is the <br /> responsibility of the owner or operator to submit a work plan to EHD Site Mitigation Unit and have it approved prior to <br /> initiating any assessment or remediation activities. To minimize delays,the work plan may be submitted concurrent <br /> with tank closure or installation plans. Address one copy of the work plan to the Site Mitigation Unit for review. If <br /> the site is not currently in the Local Oversight Program,a billing form and a$279 minimum fee must be submitted <br /> with the work plan. For further assistance contact the Site Mitigation Unit at(209)468-3450. <br /> EH 23 046 (Revised 10/16/03) Page 2 <br /> SAN JOAQUIN COUNTY <br />
The URL can be used to link to this page
Your browser does not support the video tag.