My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL INSTALL 1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARGONAUT
>
1819
>
2300 - Underground Storage Tank Program
>
PR0232020
>
INSTALL INSTALL 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:44 AM
Creation date
11/2/2018 9:44:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
INSTALL 1991
RECORD_ID
PR0232020
PE
2361
FACILITY_ID
FA0003767
FACILITY_NAME
JOHN TAYLOR FERTILIZER*
STREET_NUMBER
1819
Direction
S
STREET_NAME
ARGONAUT
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16320008
CURRENT_STATUS
02
SITE_LOCATION
1819 S ARGONAUT ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARGONAUT\1819\PR0232020\INSTALL 1991.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: <br />PUBLIC HEALTH SEVAI,S <br />SAN JOAQUIN COUNTY RECEIVED <br />JOGI KHANNA M.D., M.P.H. <br />Hnlrh Officer N9 0 1 1991 <br />P.O. Boz 2009 • (1601 Fast Hazelton Avenue) • Stoclno *001''. I,, <br />(209) 46&3400 I H FLl!+ °if lel ' S <br />ENVIRONMENTAL HEALTH C,;'ON <br />INSTAr. -ERS AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br />San Joaquin County Public Health Services -Environmental Health Division (PHS-EHD) has established the <br />following guidelines to assist you in the completion of your construction project The guidelines specify the <br />construction and monitoring criteria necessary to complete our review of your proposed underground storage <br />tank (UST) system. <br />1. <br />2. <br />20 vAYS <br />SUBMITTAL OF PIANS <br />a. Submit 3 complete sets of detailed drawings in non -erasable print to the Environmental <br />Health Division. Upon approval, one set will be retained by the department and the other <br />three will be returned. <br />b. Include equipment and material specification sheets and manufacturer's brochures describing <br />operating and monitoring systems and listing numbers or other evidence of a nationally <br />recognized testing organization approval. <br />C. Include detailed monitoring and response plans for facility. <br />d. The drawn to scale plot plan should illustrate the location of all existing and proposed <br />structures, including existing UST(s). <br />e. The plans should include a cross sectional diagram of the tank and piping system including <br />secondary containment, overflow protection equipment, and extension of all pipes and/or <br />ports from subgrade to finish grade. <br />PIAN REVIEW AND OPERATING PERMIT FEES <br />a. New facility plan review fee of 5424.00 (8 hour minimum per facility), $170.00 fee per tank, <br />plus 556.00 state surcharge fee per tank is due at time of plan submittal. <br />b. New installation of additional tank at an existing facility is 5424.00 plan review fee (8 hour <br />minimum per facility) plus 5170.00 fee per new tank, and $56.00 per tank state surcharge fee. <br />C. It should be noted that a 5424.00 plan review check fee required for each submittal allows <br />for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br />plan review, meetings, inspections, phone or office consultations will be billed to the <br />applicant at a rate of $53.00 per hour. <br />d. The maximum review time for UST installation plans is 40 working days. A preliminary <br />review will be conducted by the PHS/EHD within 20 working days of submittal date to <br />identify any gross plan deficiencies. <br />e. If gross deficiencies are identified, the plans will be retumed with checklist identifying plan <br />deficiencies. <br />f. To expedite the review of installation plans, time and a half per hour overtime fee may be <br />submitted to have review completed within 10 working days of submittal date <br />A Division of San Joaquin CoWry Hcakh Cue Services <, <br />I. <br />
The URL can be used to link to this page
Your browser does not support the video tag.