My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL INSTALL 1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARGONAUT
>
1819
>
2300 - Underground Storage Tank Program
>
PR0232020
>
INSTALL INSTALL 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:44 AM
Creation date
11/2/2018 9:44:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
INSTALL 1991
RECORD_ID
PR0232020
PE
2361
FACILITY_ID
FA0003767
FACILITY_NAME
JOHN TAYLOR FERTILIZER*
STREET_NUMBER
1819
Direction
S
STREET_NAME
ARGONAUT
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16320008
CURRENT_STATUS
02
SITE_LOCATION
1819 S ARGONAUT ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARGONAUT\1819\PR0232020\INSTALL 1991.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E M C O <br />James C. Bateman Petroleum Services Inc. <br />431 West Hatch Road, Modesto, CA 95351 <br />General Engineering Building Contractor <br />License No. 449564 A, R, C-61 <br />(209) 524-9653 <br />November 18, 1991 <br />FNVIR�c 'JIM <br />�rtpM <br />Mr. Bill Snavely <br />Public Health Services <br />Environmental Health Division <br />P. 0. Box 2009 <br />Stockton, CA 95201 <br />RE: John Taylor Fertilizer <br />Dear Mr. Snavely: <br />In response to our telephone conversation on Friday, November <br />15, 1991, I am sending you a copy of the response plan for <br />John Taylor Fertilizer. This plan is currently on file with <br />the San Joaquin County Office of Emergency Services. <br />I am also asking that this letter be considered for addendum <br />to the installation plans submitted for John Taylor <br />Fertilizer-. We show on page 2 of 4, in the typical cross <br />section the use of 4" and 1--1/2" galvanized piping as risers <br />from the tank, to the dispenser. In reference to the diesel <br />tank, we propose the use of bare steel piping for all tank <br />risers. <br />If you have any questions or comments, please call. Thank <br />you for your consideration on this project. <br />Sincerely, <br />incerrely, <br />Milt Tiffin, <br />Estimator <br />MT/sh <br />
The URL can be used to link to this page
Your browser does not support the video tag.