My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
E
>
103
>
2300 - Underground Storage Tank Program
>
PR0231555
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:35 PM
Creation date
11/4/2018 2:09:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0231555
PE
2361
FACILITY_ID
FA0004027
FACILITY_NAME
HENDRIX FORK LIFT INC
STREET_NUMBER
103
Direction
N
STREET_NAME
E
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318001
CURRENT_STATUS
02
SITE_LOCATION
103 N E ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\E\103\PR0231555\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Stockton <br />I fire Prevention Division <br />345 North E/ Dorado Street <br />rn Stockton, CA 95201 <br />PREVENTION (209) 937-8271 <br />GUIDELINES FOR UNDERGROUND TANK REMOVAL <br />It is the intent of these guidelines to add continuity to the procedures for underground tank <br />removal. Be sure you have completed the necessary paperwork with the San Joaquin County <br />Environmental Health Department prior to applying for City of Stockton permits. Also, please <br />note that a minimum of 48 hours advance notice is required keeping in mind that the more <br />advance notice given the more likely your inspection will be scheduled on the date of your <br />choice. <br />1. A written safety plan is required that meets Cal-Osha requirements. <br />1 Post signs prohibiting any ignition source: <br />a) Example: "No Smoking," "No Cutting and Welding," etc. <br />3. Provide a minimum rated 20BC or larger fire extinguisher at tank site. <br />4. You must have a calibrated, explosion -proof combustible gas meter on site. <br />a) LEL and Oxygen must both be below 9% prior to removal; or <br />b) oxygen only, 5% on the oxygen for gasoline and diesel tanks; or <br />C) LEL only, i% on gasoline and diesel. <br />d) Extra filters and equipment to calibrate instruments must be on site. <br />e) Make and model number of instrument must be available to inspector. <br />fl Appropriate measures are required to assure the LEL percentage is maintained <br />during and after excavation. <br />1) Monitor tanks once per hour for LEL and Oxygen after removal from <br />ground while on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.