- - -- - - - <br /> TESTING GENERAL CONDITIONS CONTACTS <br /> A STATE CERTIFIED PRECISION TEST MUST BE PERFORMED AFTER COORDINATION ROBERT H. LEE AND ASSOCIATES <br /> PLACEMENT OF FINISH YARD MATERIALS. CONTACT PACIFIC BELL 1 COORDINATE THE WORK: DO NOT DELEGATE THE RESPONSIBILITY FOR <br /> REPRESENTATIVE 5 DAYS PRIOR TO TEST TO ARRANGE PRODUCT COORDINATION TO ANY SUBCONTRACTOR, FABRICATOR OR SUPPLIER, <br /> DELIVERY. 2 RESOLVE DIFFERENCES OR DISPUTES CONCERNING COORDINATION, CHRIS LUCIA <br /> INTERFERENCE, OR EXTENT OF WORK, <br /> 3 USE LARGE—SCALE LAYOUT DRAWINGS OF OTHER AFFECTED WORK, TO 70 7) 765-1660 <br /> CHECK, COORDINATE, AND INTEGRATE THE WORK TO PREVENT <br /> CONTAINMENT REQUIREMENTS / SPECIAL PIPING INTERFERENCE$, <br /> 4 COORDINATE WORK PERFORMED BY PACIFIC BELL AND OTHERS AS IT <br /> REQUIRED NOT-REQUIRED INVOLVES THE EXECUTION OF THIS WORK. <br /> 5 COORDINATE DELIVERY AND STORAGE OF OWNER FURNISHED EQUIPMENT COUNTY OF SAN JOAOUIN <br /> x PRODUCT SECONDARY AND FUEL FOR TESTING. <br /> CONTAINMENT ENVIRONMENTAL HEALTH DEPARTMENT <br /> CUTTING AND PATCHING ARMSTRONG RD. <br /> x ANNULAR•VINT LINE <br /> 1 PATCHING SHALL SUCCESSFULLY DUPLICATE UNDISTURBED ADJACENT jy <br /> FINISHES, COLORS, TEXTURES AND PROFILES PH 1T SS3S <br /> x VENT UNE SECONDARY CGNTAINMENT 2 COMPLY WITH LOCAL ORDINANCES AND THE REQUIREMENTS OF CCR TITLE <br /> 8, INDUSTRIAL SAFETY ORDERS AND CAL/OSHA REGULATIONS. DO NOT 0 <br /> - CUT OR ALTER STRUCTURAL MEMBERS WITHOUT PRIOR WRITTEN APPROVAL EIGHT NILE RD. <br /> x VAPOR RECOVERY SECONDARY OF PACIFIC BELL, <br /> CONTAINMENT 3 PERFORM CUTTING, ASSOCIATED STRUCTURAL REINFORCING AND PATCHING IN CITY OF STOCKTON <br /> A MANNER TO PREVENT DAMAGE TO OTHER WORK AND TO PROVIDE PROPER =J <br /> 3 GAL. CAPACITY OF OVERSPILL/FILL SURFACES FOR THE INSTALLATION OF MATERIALS, EOUIPMENT AND REPAIRS. FIRE DEPARTMENT N <br /> CONTAINMENT BOX REQUIRED PERFORM DEMOLITION WORK IN SUCH MANNER AS TO PREVENT DAMAGE TO s <br /> EXISTING FACILITIES TO REMAIN OR TO BE SALVAGED, AND TO PREVENT �r <br /> INJURY TO PUBLIC AND WORKERS ENGAGED ON SITE UNDER THIS OR OTHER <br /> CONTRACTS. DEMOLITION DEBRIS SHALL NOT BE ALLOWED TO ACCUMULATE <br /> ON SITE. HAZARDOUS WORK SHALL NOT BE LEFT STANDING OR HANGING SITE <br /> OVERNIGHT OR WEEKENDS PH # <br /> 99 <br /> 4 WHEREVER CUTTING AND REMOVAL OF PORTIONS OF EXISTING WORK IS <br /> INDICATED, SUCH WORK SHALL BE SAWN IN A MANNER THAT WILL PRODUCE <br /> TANK(S) TO BE REMOVED UNDER THIS CONTRACT NEAT AND STRAIGHT LINES, PARALLEL TO ADJACENT SURFACES OR PLUMB <br /> FOR VERTICAL SURFACES. GRIND SMOOTH RESULTING EDGES OF CONCRETE <br /> SLABS OR WALKS, SAN JOAOUIN VALLEY <br /> 10.600 SINGLE WAIL FIBERGLASS ONE <br /> GALL O GALLONS TYPE QUANTITY 5 REMOVE EXISTING FINISH MATERIALS BACK TO CLEAN STRAIGHT LINE <br /> ON NE <br /> ON NEAREST SUPPORT IN ORDER TO FACILITATE INSTALLATION OF NEW AIR POLLUTION CONTROL DISTRICT <br /> {,000 SINGLE WALL FIBERGLASS ONE MATERIALS, PATCHES OR REPAIRS. EXECUTE CUTTING AND DEMOLITION BY t <br /> METHODS WHICH WILL PREVENT DAMAGE TO OTHER WORK AND WHICH WILL <br /> GALLONS TYPE QUANTITY PROVIDE PROPER SURFACES TO RECEIVE INSTALLATION OF REPAIRS AND NEW <br /> WORK. <br /> 5 KEEP AREAWAYS, WALKS, CORRIDORS AND STREETS FREE OF DIRT AND PH VICINITY MAP <br /> GALLONS TYPE QUANTITY RUBBISH. <br /> 7 REPAIR OR REPLACE IMPROVEMENTS DAMAGED AS A RESULT OF THIS WORK SHEET INDEX <br /> AT NO ADDITIONAL EXPENSE TO PACIFIC BELL, <br /> TANK(S) TO BE INSTALLED UNDER THIS CONTRACT 8 PROVIDE WATER DAMS AND OTHER CONTAINMENT PROCEDURES, AS <br /> 10,000/51000 D.W.S. MATH NECESSARY, FOR CONTROLLING WATER USED FOR CONCRETE SAW CUTTING. CALL BEFORE YOU DIG <br /> COMPARTMENT F.R,P. COATING ONE 9 NOTE - CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ASPHALT P-1 COVER SHEET <br /> WITHIN A 4 FOOT PERIMETER AROUND TANK EXCAVATION AT NO ADDITIONAL <br /> GALLONS TYPE QUANTITY EXPENSE TO PACIFIC BELL. 'UNDERGROUND SERVICES ALERT' P-2 SITE PLAN <br /> P-3 TANK SECTION / SLAB PLAN AND DETAILS <br /> P-4 TANK AND PIPING DETAILS <br /> GALLONS TYPE OuaNnir P-5 TYPICAL TLS-350 INSTALLATION j <br /> -- IN NORTHERN CAUFO NIA IN SOUTHERN CALIFORNIA P-6 SPECIFICATIONS <br /> GALLONS TYPE QUANTITY 1-800-642-2444 U.S.A. 1-800-422-4133 <br /> GENERAL NOTES SCOPE OF WORK <br /> 1- ON TRACTOR TO FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR I, SCHEDULE A METHOD OF PROCEDURE (MOP.) MEETING WITH PACIFIC BELL FI <br /> E SATISFACTORY COMPLETION OF ALL WORK CALLED FOR OR REQUIRED BY THE DRAWINGS FACILITY ENGINEER All " MINIMUM ONE WEEK IN ADVANCE OF PROPOSED <br /> iD SPECIFICATIONS. <br /> CONSTRUCTION START f. lJE. i <br /> 2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT APPLICABLE UNIFORM 2. CALL UNDERGROUND SERVICE ALERT (U.SA,) AT 'A MINIMUM OF 48 HOURS ` <br /> PRIOR TO START OF Cy'ISTRUCTION. <br /> BUILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, CALIFORNIA UNDERGROUND + ' <br /> STORAGE TANK REGULATIONS, CAL-OSHA CONSTRUCTION SAFETY ORDERS AND ANY OTHER 3. SAW CUT AND REMO',j EXISTING CONCRETE TANK SLAB, CONCRETE HOLDDOWN <br /> APPLICABLE STATE, CITY, OR COUNTY ORDINANCES. SADDLES. AND AC PA INC AS NECESSARY TO EXCAVATE AND REMOVE (1) PACIFIC FELL ENGINEER <br /> 10,000 AND (1) 4000+GALLON FIBERGLASS UNDERGROUND FUEL STORAGE <br /> 3. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO REMAIN UNLESS NOTED OTHERWISE. TANKS, ALL ASSOCIATI`D EQUIPMENT AND PIPING IN ACCORDANCE WITH <br /> CONTRACTOR SHALL REPAIR OR REPLACE ANY EXISTING FACILITIES WHICH ARE DAMAGED BY THE UNCERGROUND TANK REMOVAL PROCEDURE ON SHEET P-6. <br /> .THE CONTRACTOR'S OPERATIONS TO THE SATISFACTION OF THE OWNER 4. REMOVE EXISTING CONCIPETE DISPENSER ISLAND, DISPENSER, VENT RISER, AND <br /> ALL ASSOCIATED PIPING.AND EQUIPMENT. <br /> THE EXISTENCE OF UNDERGROUND UTILITIES IS UNKNOWN. IT SHALL BE THE CONTRACTORS 5. REMOVE EXISTING TLS kSO TANK MONITORING PANEL LOCATED IN OFFICE TOM CHILCOTE <br /> RESPONSIBILITY TO DETERMINE THE EXACT LOCATION(S) AND/OR EXISTENCE OF ALL UNDER- BUILDING AND TURN OVER TO PACIFIC BELL. <br /> GROUND UTILITIES IN WORK AREA. PRIOR TO EXCAVATION, CONTRACTOR SHALL UTILIZE THE PAGER (408) 236-8552 <br /> 6. INSTALL ONE NEW 15,000 CAL STEEL (10 000/5.000 GAL COMPARTMENT) <br /> SERVICES OF A INDEPENOENT.UTILITY LOCATING SERVICE FOR FIELD MARKING OF UTILITY LOCATIONS. DOUBLE .WALL UNDERGROUND FUEL STORAGE TANK AND E UI MENT EIT VOICE MAIL (510) 901-9448 <br /> 5. ROBERT H, LEE & ASSOC. SHALL APPLY, SECURE APPROVAL AND PAY FOR ENVIRONMENTAL HEALTH, DRAWINGS AND MANUFACTURERS INSTALLATION INSTRUCTIONS. SEE SHEET <br /> AIR POLLUTION. BUILDING AND FIRE DEPARTMENT PERMIT PLAN CHECK FEES. CONTRACTOR SHALL APPLY AND PA P-3 FOR EQUIPMENT FURNISHED BY PACIFIC BELL. CONTRACTOR SHALL <br /> PROVIDE ALL OTHER MATERIALS, LABOR AND EQUIPMENT FOR A COMPLETE <br /> FOR ALL PERMIT FEES INCLUDING OBTAINING ANY OVER THE COUNTER PERMITS REQUIRED FOR THE COMPLETION SYSTEM. CONTRACTOR SHALL COORDINATE WITH SHIELDS. HARPER AND <br /> OF THIS PROJECT. CONTRACTOR TO SUPPLY CERTIFICATE OF INSURANCE, CITY BUSINESS LICENSE, COMPANY FOR DELIVEAY OF OWNER FURNISHED EQUIPMENT AND START UP <br /> EVIDENCE OF CONTRACTORS LICENSE AND ANY OTHER INFORMATION WHICH THE PERMITTING AGENCY OF TANK MONITORING-SYSTEM. <br /> REQUIRES FROM CONTRACTORS, 7 INSTALL TWO NEW SINGLE PRODUCT, SINGLE HOSE SUCTION DISPENSERS, <br /> 6. GENERAL CONTRACTOR SHALL NOTIFY THE ENGINEER PROMPTLY IF SITE CONDITIONS OR DIMENSIONS YARD LIGHT, AND A:R/WATER 11 BOX ON CONCRETE DISPENSER ISLAND. <br /> DISAGREE WITH INFORMATION SHOWN ON THESE DRAWINGS. WORK IS NOT TO PROCEED UNTIL Millilms <br /> SUCH DIFFERENCES ARE RESOLVED. <br /> 9 INSTALL NEW 2"' FIBC�CLASS VAPOR RETURN AND VENT PIPE AND BLACK i ON <br /> V 7. CONTRACTOR SHALL COORDINATE WITH THE ENVIRONMENTAL CONSULTANT AND PACIFIC BELL FOR DISPOSAL <br /> W VENT RISERS. ATTACH NEW VENT RISERS TO NEW V4Ni RISER STAND <br /> V OF TANK, PIPING AND RELATED EQUIPMENT AND THE TESTING FOR CON RM:NA710N. 10. INSTALL NEW TLS,35QITANKMONITORING PANEL NTH LIQUID SENSORS, LEVEL <br /> E 8. CONTRACTOR TO PULL TANK AND LOAD ONTO TRUCK PROVIDED BY ENVIRONMENTAL CONSULTANT. <br /> GAUGE AND ALL A55QCIAFED EOUIPMENT, PER DRAWINGS AND SEAL BY LOCAL ENGINEER <br /> 9. PACIFIC BELL ENVIRONMENTAL CONSULTANT SHALL BE RESPONSIBLE FOR ALL SOIL/GROUNDWATER SAMPLING MANUFACTURERS INSTALLATION INSTRUCTIONS P90VIOE AND 'NSTALL A STEEL <br /> N AND ANALYSIS ENVIRONMENTAL CONSULTANT SHALL TRANSPORT AND DISPOSE OF TANK, PIPING AND ALL ENCLOSURE BOX ON THE WALL UNDER THE PANEL TO HOUSE THE EXISTING <br /> TANK EXCAVATION SOIL AND GROUNDWATER, CLEAN OR CONTAMINATED. CONTRACTOR SHALL DISPOSE OF MODEM. R67B8RT H. LEN 0 ASSSOCIAT119, INC. <br /> BROKEN ASPHALT AND CONCRETE, DEBRIS AND MISCELLANEOUS EQUIPMENT CONTRACTOR SHALL LOAD SOIL 11. INSTALL NEW CONOUIj AND CONDUCTORS AS REQUIRED FOR MONITORING <br /> PLANNING ONTO <br /> ONTO TRUCK PROVIDED BY ENVIRONMENTAL CONSULTANT. EQUIPMENT AND DISP NSER POWER. EXISTING CONDUITS MAY BE REUSED Ir+�ro.nmc �.a.w. r�u�uu,cA 9nwe Don »-rwo <br /> FROM BUILDING TO TANK AREA. .+�.+w. nw* ra Kn•recr . ,io, sK yv,Q..� a¢reeq <br /> 10. CONTRACTOR SHALL PROVIDE A DETAILED METHOD OF PROCEDURE (M.O.P.) TO PACIFIC BELL <br /> 12. PERFORM PRESSURE TESTS ON NEW TANK AND PIPING IN COMPLIANCE WITH <br /> FOR APPROVAL PRIOR TO START CONSTRUCTION. THE FOLLOWING: <br /> u0 A. MANUFACTURER."$ INSTRUCTIONS FOR TESTING. - 1 <br /> 11. CONTRACTOR SHALL SUPPLY PACIFIC BELL NTH A DETAILED WORK SCHEDULE AND UPDATE PROGRESS 0. 1991 UNIFORM FIRE CODE SECTIONS 79.605 AND 79.708 <br /> V) AND/OR CHANGES ON A WEEKLY BASIS. C. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> N 12. CONTRACTOR SHALL PROVIDE THREE SETS OF SUBMITTALS ON ANY CONTRACTOR SUPPLIED EQUIPMENT D. SECTIOPRECIS ON 35 (b) (P)ROOUCT LINES AND TANKS - <br /> TO PACIFIC BELL PRIOR TO START OF CONSTRUCTION. <br /> E A,O.M.D. REQUIRED SOURCE TEST <br /> 13. CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING THREE COMPLETE SET$ OF OPERATION, 13. AFTER COMPLETION OF ALL PRESSURE TESTS, BACKFILL TANK EXCAVATION ISSUED FOR BID CTL <br /> MAINTENANCE AND TEST DATA TO PACIFIC BELL, WHICH SHALL INCLUDE: <br /> �n AND PIPING TRENCH TO SUBGRADE WITH PEAGRAVEL AND POUR NEW <br /> rn <br /> CONCRETE TANK PAD' MAINTAIN EXISTING SITE DRAINAGE. NO. REVISIONS / AUTHORIZATIONS DATE BY <br /> A) ALL MANUFACTURER'S LITERATURE, SUBMITTAL DATA COPIES, INSTALLATION, <br /> OPERATION AND MAINTENANCE DATA ON ALL EQUIPMENT AND DEVICE$ 14, PATCH AND REPAIR EXISTING ASPHALT PAVING WHERE DISTURBED BY NEW \/ C� <br /> INSTALLED, THIS I$ TO INCLUDE TANKS, SENSORS, WELLS, PIPING, PUMPS, WORK TO MATCH EXISTING. RESTORE PARKING SPACES TO ORIGINAL COVER FR 11HFET <br /> U <br /> DOUBLE CONTAINMENT SYSTEM, SUMPS, AND ALL OTHER INSTALLED ACCESSORIES, CONDITION. <br /> p B) ALL TEST RESULTS INCLUDING BUT NOT UNITED t0 PRESSURE AND/OR LEAK TESTING. 15. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL ARRANGE A FINAL <br /> WALK 7HRU SITE INSPECTION WITH PACIFIC BELL AND POET. H. LEE 4 ASSOC. <br /> C) ALL PERMITS, COPIES OF SIGNED-OFF PERMITS FROM ALL AGENCIES INVOLVED, 15, PROVIDE ALTERNATE BID TO REMOVE EXISTING TANK HOLD-DOWN SLAB DRAWINGS PREPARED FOR <br /> D) COPY OF CORRESPONDENCE WITH VARIOUS AGENCIES CONCERNING THIS PROJECT. PACIFIC BELL <br /> E) ALL DOCUMENTS AND DATA SHALL BE INSTALLED IN A RING BINDER AND EACH <br /> SECTION APPROPRIATELY IDENTIFIED. OUTSIDE COVER SHALL CLEARLY IDENTIFY SACRAMENTO, CALIFORNIA <br /> JOB LOCATION AND DATE, FACILITY ADDRESS <br /> ` "5`B°"T Ory 2300 E. EIGHT MILE ROAD <br /> 14. STOCKPILE OF. DIRT SHALL BE COVERED COMPLETELY WITH PLASnC TARP, ANCHOR AND SECURE r <br /> PLASTIC TARP FIRMLY TO PROTECT FROM THE ELEMENTS. s <br /> p. 15. ALL ELECTRICAL WORK TO BE DONE IN COMPLIANCE NTH CHAPTER 5, ARTICLES 500-50 AND 514 NOTE STOCKTON, CALIFORNIA <br /> p OF THE NATIONAL ELECTRIC CODE, SEAL ALL CONDUITS AS REQUIRED UNDER THE CODE, TANK SYSTEM TO BE INSPECTED BY LEAD AGENCY AT FOUR SEPARATE PHASES. <br /> DATE: DRAWN BY, <br /> 16. NO GALVANIZED PIPE OR FITTINGS FOR DIESEL SERVICE WILL BE ALLOWED, 1 SETTING <br /> OFTE TA K EST SHALL INCLUDE THE SOAP TEST, HOLIDAY TEST, <br /> OR RHPROJECT ENGINEER CHECKED BY: J. Mc GRATH <br /> 17, ALL CONDUIT SHALL BE RIGID TYPE WITH THREADED CONNECTORS AND BE WRAPPED FOR CORROSION 2, PRIMARY PIPING AND TANK SYSTEMS INCLUDING VENT, VAPOR LINES, RISERS, <br /> PROTECTION TO A POINT ABOVE GROUND LEVEL. NO DIE CAST, PVC, OR PLASTIC ELECTRICAL CONDUIT ETC, EST/RO NO. SHEET 1 OF 6 SHEETS <br /> " OR FITTINGS SHALL BE USED. USE ONLY STEEL CONDUIT FITTINGS, 3. INSPECTION OF ALL "SECONDARY CONTAINMENT TO INCLUDE SECONDARY PIPE APPROVED DRAWING N0. <br /> PRESSURE TEST, CORROSION PROTECTION, AND DISPENSER CONTAINMENT BOX. <br /> G 18. NEW TANKS AND PIPING. TO BE TESTED IN ACCORDANCE WITH APPLICABLE REGULATIONS AND 4, FINAL SYSTEM INSPECTION WHICH INCLUDES ELECTRICAL, MECHANICAL, AND <br /> SPECIFICATIONS SALL Y57EMSTION$ OF THE LEAK DETECTION SYSTEM AND OTHER MONITORING Y- D..1 <br /> 0 1 <br /> MANAGER <br />