Laserfiche WebLink
PARKING <br /> z z z z <br /> Y Y Y <br /> i s a n a <br /> PARKING + <br /> i ( PARKING <br /> III <br /> GATE ///��� EXISTING EMERGENCY GENERATOR <br /> POWER PLUG AND SWITCH <br /> �I <br /> Q <br /> p FILEACH <br /> OFFICE BUILDING CABLE STORAGE <br /> uj <br /> FIELD BUILDING I POND <br /> RAMP _I / <br /> AREA OF CONSTRUCTION. i <br /> W + _ SEE DEMOLITION AND <br /> INSTALLATION PLANS + <br /> ` GATE --�" _ BELOW ----� <br /> l <br /> PARKING WASH -. <br /> PAD <br /> +l i z z i PARKING <br /> x z z z I + <br /> Q Q <br /> PARKING <br /> 1 <br /> NORTH <br /> OVERALL SITE PLAN <br /> SCALE: 1" = 40'-0' <br /> LEGEND <br /> DIESEL <br /> DF PRODUCT PIPING WITH <br /> DEMOLITION NOTES INSTALLA'BiON NOTES u UNLEADED SECONDARY <br /> CONTAINMENT <br /> UNDERGROUND'UTILRIES ARE NOT ALL PIPING RUNS ARE SHOWN Q INSTALL ONE New 15,000 CAL. COMPARTMENTAL (IDK-uNL/sK-DSL ------v ------ 2° FIBERGLASS venT urvE <br /> SHOWN. IT IS THE CONTRACTORS SCHEMAT!CAL0. BEST ROUTE UNDERGROUND STEEL DOUBLE WALL TANK IN ACCORDANCE <br /> 7 INSTALL TEMPORARY 6' HIGH CHAIN WITH THE INSTALLATION SPECIFICATIONS ON SHEETS <br /> RESPONSIBILITY TO LOCATE UTILITIES LINK FENCE AROUND WORK AREA, SHALL BE DETERMINED IN FIELD. P-3 AND P=8 SET NEW TANK IN EXISTING HOLE SEE 2 — — —VR— — -- 2" FIBERGLASS VAPOR RETURN LINE <br /> PRIOR TO TRENCHING OR EXCAVATING P-J <br /> — O REMOVE EXISTING 10,000 GALLON ® NEW 8" THICK REINFORCED CONCRETE TANK _ _ _A — — _ AIR LINE <br /> FRP UNDERGROUND GASOLINE TANK, SLAB AND DRIVE SLAB NTH N4 REBAR 12' <br /> CONCRETE TANK SLAB, OC. EACH WAY. SEE1 <br /> CONCRETE HOLO DOWN SADDLES <br /> AND ALL ASSOCIATED EQUIPMENT - P-3 — — —W— — — WATER LINE <br /> IN ACCORDANCE WITH THE UNOER- <br /> GROUND TANK REMOVAL PROCEDURE O NEW 2" FIBERGLASS VAPOR RETURN LINE SLOPE 1/8" PER <br /> ON SHEET P-6. FOOT DOWN:TOWARDS TANK E RIGID STEEL CONDUIT <br /> O3 EXISTING TLS-250 TANK MONITORING 38'-0" DO NEW 2" FIBERGLASS VENT LINE SLOPE 1/8" PER FOOT <br /> } PANEL TO BE REMOVED AND TURNED MIN -- . <br /> . pOWN':TQWAROS TANKS <br /> a. OVER TO PACIFIC BELL. EO NEW 1 1/2" PRIMARY TOTAL CONTAINMENT ENVIROFLEX PRODUCT <br /> (fE Q EXISTING CONCRETE ISLAND NTH FUEL EXISTING EMERGENCY (PING WI ]ICON AA Y NTAI MENT PIPIN LOPE j <br /> DISPENSER AND AIR/WATER DISPENSER OSNUpO�EF _5 <br /> 8 PER FOOT:MIN. DOWN WA NKS <br /> X X X -- X - X X— X X� TO BE REMOVED 5 7 <br /> 0 i O O NEW UNLEADED, TWO HOSE SUCTION DISPENSER. SEE P-4 P-1 <br /> < ^ NEW DISPENSER SHALL BE LOCATED A7 <br /> 1 x0 ✓ EXISTING YARD LIGHT, VENT RISERS SAME LOCATION OF EXISTING DISPENSER. <br /> 0 0 AND ALL ASSOCIATED PIPING - - 0 O E <br /> TO BE REMOVED. 10 <br /> OBSERVATION WELL L NEW CONCRETE DISPENSER ISLAND. SEE <br /> P-4 <br /> f ! SEAT. BY LOCAL ENGINEER <br /> m x x O REMOVE EXISTING 4,000 GALLON SUCTION TUBE4 <br /> y FRP UNDERGROUND GASOLINE TANK, INSTALL NEW VENT RISERS ON NEW AREA LIGHT. SEE P-4 <br /> I CONCRETE TANK SLAB, VENT monsRT H. LEN & A880CIAT69, INC. <br /> I CONCRETE HOLD DOWN SADDLES CONNECT EXISTING AIR AND WATER LINES UNDERGROUND ARCCUTSC)71 E PLANNINQ ENOVZERNO <br /> AND ALL ASSOCIATED EQUIPMENT DIESEL FILL 0 O <br /> "O IN ACCORDANCE `NTH THE UNDER- TO NEW AIR/WATER DISPENSER. ++�ro.n.co.+g�a.w. csr,uirw a soma y Ron vm ,l <br /> x x TLS \ D T Ar+ v. AST ua+r[ci .uas ra anv,a.�sr{Eeq <br /> o GROUND TANK REMOVAL PROCEDURE F E �\ O NEW AIR/WATER DISPENSER. <br /> ON SHEET P-6, SUCTION TUBE M <br /> v ( I n 1 B O7 SALVAGE EXISTING BOOTH. REPLACE VENT/VAPOR \ © NEW 6" STEEL PIPE BOLLARD (TYP. OF 4) SEE .' <br /> LJ I AFTER CONSTRUCTION. U� <br /> N x 5 TLS I \.., E p M IDENTIFY AND REUSE EXISTING CONDUITS AND CONDUCTORS FOR <br /> \, REPLACE EXISTING UNDERGROUND II . 1 O DISPENSER',POWER, EXTEND r0 NEW EQUIPMENT AS NECESSARY <br /> O 4 UTILITY BOX. I I V. <br /> F P n USING MATCHING MATERIALS. INSTALL NEW JUNCTION BOXES AND <br /> x <br /> I VR— M SEAL OFFS AS REQUIRED BY MFR'S INSTALLATION INSTRUCTIONS. ISSUED FOR BID 12--95 CTL <br /> ON O <br /> E IDENTIFY AND REUSE EXISTING CONDUITS AND INSTALL NEW CONDUCTORS ISSUED TO CLIENT FOR PRELIMINARY REVIEW 12-1-95 CTL 1 ' 0 0 FOR TLS MONITORING SYSTEM, EXTEND CONDUITS AND CONDUCTORS TO <br /> N K NEW SENSORS USING MATCHING MATERIALS. INSTALL NEW JUNCTION N0. REVISIONS / AU hiCR12A 1ION5 DATE BY <br /> t ^ I BOXES AND SEAL OFFS AS REQUIRED BY ELECTRICAL ORAWANGS, <br /> C6 u x TRUCK VAPOR I J SPECIFICATIONS, AND MANUFACTURER'S INSTALLATION INSTRUCTIONS, <br /> ' <br /> ALL PENETRATIONS THROUGH FIBERGLASS SUMPS TO DE SEALED SITE PLAN <br /> > UNLEADED FILL _ a I U WATER TIGHT. <br /> Z A ORECONNECT EXISTING EMERGENCY PUMP SHUT-OFF SNATCH. �I <br /> x L — — — — — — — — — — — — — -I x REUSE EXISTING CONDUIT AND RUN NEW CONDUCTORS IF REQUIRED DRAWINGS PREPARED FOR <br /> ANNULAR SPACE E _ <br /> L X X X X X X X X � ' / -Op OO REINSTALL EXISTING BOOTH ON NEW CONCRETE ISLAND. PACIFIC '1 BELL <br /> N <br /> C NEW YARD LIGHT. IDENTIFY AND REUSE EXISTING CONDUITS AND SACRAMENTO, CALIFORNIA <br /> R CONDUCTORS FOR NEW YARD LIGHT. EXTEND AS NECESSARY USING FACILITY ADDRESS <br /> MATCHING MATERIALS. REFER TO MFRS INSTL. INSTRN'S SEE <br /> P-4 2300 E. EIGHT MILE ROAD <br /> SO NEW TLS-350 MONITORING SYSTEM WITH INSTALLATION <br /> MODEM ENCLOSURE STOCKTOI(�`I CALIFORNIA <br /> PI BOX BELOW. REFER TO MANUFACTURER'S NSTAlLAT10N 1 <br /> N <br /> INSTRUCTIONS. SEE SHEET P-5. <br /> O <br /> N O7 NEW DIESEL, TWO HOSE SUCTION DISPENSER, SEE 5 7 DATET DRAWN BY: JET <br /> COVER PLATE AT ISLAND MAY BE LOCATION OF CHECKED BY: J. M<GRAh1 <br /> ABANDONED DISPENSER STUB-UPS MAY EXIST. PROJECT ENGINEER <br /> U INSTALL NEW CONDUITS AND CONDUCTORS OR EXTEND <br /> Z DEMOLITION PLAN INSTALLATION PLAN EXISTING AS REQUIRED. FIELD VERIFY ESTSHEET 2 OF 6 SHEETS <br /> APPROVED VEDD DRAWING N0, <br /> SCALE' I'' 10' SCALE: /" IQ' OU NEW UNDERGROUND UTILITY BOX. <br /> 3 <br /> Y- <br /> IP-2 <br /> O MANAGER <br />