My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
2300
>
2300 - Underground Storage Tank Program
>
PR0231893
>
INSTALL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:28 PM
Creation date
11/4/2018 2:15:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231893
PE
2361
FACILITY_ID
FA0018028
FACILITY_NAME
AT&T CALIFORNIA - UE17L
STREET_NUMBER
2300
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
Stockton
Zip
95210
APN
12002013
CURRENT_STATUS
02
SITE_LOCATION
2300 E EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\2300\PR0231893\INSTALL PLAN 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBrIC HEALTH SERVICES <br /> SAN IOAQUIN COUNTY <br /> I ,tel <br /> L* <br /> OGI KHANNA I.D. I.P.H. <br /> < <br /> Health Officer <br /> P.O.Boz 2009 • (1601 Eau Hazelton Avcnue) • Stockton, California 95201 <t'`Oaf <br /> (209)468-3400 <br /> TO: INSTALLERS AIND OWNERS #NEW ERGROUND STORAGE TANKS <br /> San Joaquin County Public Health Services-Environmental Health Division (PHS-EHD) has established the <br /> following guidelines to assist you in the completion of your construction project. The guidelines specify the <br /> construction and monitoring criteria necessary to complete our review of your proposed underground storage <br /> tank (UST) system. <br /> 1. SUBMITTAL OF PLANS <br /> a. Submit 3 complete sets of detailed drawings in non-erasable print to the Environmental <br /> Health Division. Upon approval, one set will be retained by the department and the other <br /> two will be returned. <br /> \ b. Include equipment and material specification sheets and manufacturer's brochures describing <br /> operating and monitoring systems and listing numbers or other evidence of a nationally <br /> recognized testing organization approval. <br /> c Include detailed monitoring and response plans for facility. �'VpUiM)t 7 �kGtFtG BlW <br /> fvr��`j� <br /> d. The draw to scale plot plan should illustrate the location of all existing and ' oposed <br /> structures, including existing UST(s). <br /> C. The plans should include a cross sectional diagram of the tank and piping system including <br /> secondary containment, overflow protection equipment, and extension of all pipes and/or <br /> ports from subgrade to finish grade. <br /> 2. PLAN REVIEW AND OPERATING PERMIT FEES <br /> a. New facility plan review fee of 5624.00 (8 hour minimum per facility), 5170.00 fee per tank, <br /> plus 556.00 state surcharge fee per tank is due at time of plan submittal. <br /> b. New installation of additional tank at an existing facility is $624.00 plan review fee (8 hour <br /> minimum per facility) plus 5170.00 fee per new tank,and 556.00 per tank state surcharge fee. <br /> C. It should be noted that a 5624.00 plan review check fee required for each submittal allows <br /> for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br /> plan review, meetings, inspections, phone or office consultations will be billed to the <br /> applicant at a rate of S78.00 per hour. <br /> d. The maximum review time for UST installation plans is 40 working days. A preliminary <br /> review will be conducted by the PHS/EHD within 20 working days of submittal date to <br /> identify any gross plan deficiencies. <br /> e. If gross deficiencies are identified, the plans will be returned with checklist identifying plan <br /> deficiencies. <br /> f. To expedite the review of installation plans, time and a half per hour overtime fee may be <br /> submitted to have review completed within 10 working days of submittal date. <br /> .1 Dmw M Can J. qm Collry H,JIh fyc` cn C0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.