My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
2300
>
2300 - Underground Storage Tank Program
>
PR0231893
>
INSTALL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:28 PM
Creation date
11/4/2018 2:15:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231893
PE
2361
FACILITY_ID
FA0018028
FACILITY_NAME
AT&T CALIFORNIA - UE17L
STREET_NUMBER
2300
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
Stockton
Zip
95210
APN
12002013
CURRENT_STATUS
02
SITE_LOCATION
2300 E EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\2300\PR0231893\INSTALL PLAN 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. PLAN REVIEW C IELTNES <br /> a. The enclosed plan review sheet is provided for your information to assist you in interpreting <br /> our requirements for your new UST system. <br /> b. A copy of the California UST Regulations may be obtained from the State Water Resources <br /> Control Board at (916) 7394332. <br /> C. Permits andtor plan check approval may also be required by the San Joaquin Air Pollution <br /> Control District,County/City Building Department and Fire District in your respective area. <br /> d. Complete and submit the State Water Resources Control Board "Facility Permit (A)' and <br /> Tank Permit (B)' application forms. <br /> e. A minimum of 3 inspections will be conducted on the UST system installation. A S-8 per <br /> hour inspection fee shall he charged for additional inspections or reinspection as required. <br /> (See required inspection below) <br /> f. Applicanticontractor to adhere to the approval plan and any change or deviation shall be <br /> reported and approved by PHS/EHD prior to installation. <br /> g. Application for installation of underground tanks are only valid for the calendar year in which <br /> it has been issued. A permit may be extended into the next calendar year if a letter is sent <br /> to PHS-EHD requesting this extension thirty days prior to the end of the calendar year. A <br /> one year--one time extension may be granted by PHS-EHD upon receipt of this letter. <br /> 4. REOUTRED INSPECTIONS <br /> All appointments for inspection must be made at least 48 hours in advance for the following. <br /> a. Primary and secondary tank(s) shall be tested pneumatically at 3 - 5 p.s.i. for one hour,one- <br /> half hour for primary tank and one-half hour for secondary tank. Double walled tanks are <br /> exempt if annular space is monitored using either pressure or vacuum testing. (All external <br /> connection shall be soap tested while under pressure) <br /> b. Pressure piping shall be hydrostatically tested to 150% or pneumatically tested to 110% of <br /> maximum anticipated system pressure but does not less than 5 lbs. per square inch at the <br /> highest point of the system for a minimum of 20 minutes. <br /> C. All lines other than pressure piping shall be pressure tested at not less than 3 p.s.i. and not <br /> more than 5 ps.i. for a minimum of 20 minutes and soap tested while under pressure. <br /> d. Containment sumps shall pass a 24 hour leak test. <br /> e. Overfill protection shall be capable of draining liquid back into fuel tanks. <br /> e. Monitoring system shall pass a functional test The functional test shall consist of the <br /> activation of the alarm via the monitoring probes/senors. <br /> f. Final inspection and approval to operate will be granted after the above requirements are <br /> satisfied and a hard copy of the precision test is submitted to inspector at site. <br /> The contractor's approved printset of the UST installation shall kept at the job site and must be shown to the <br /> inspector upon request. In addition, the Local Fire Department shall approve UST installation prior to <br /> commencement of work <br /> If you need further assistance, or wish to schedule an appointment to discuss the plan review or field <br /> inspection, please contact our Underground Storage Tank Staff at (209) 468-3427. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.