PERFORMANCE SPECIFICATION '� yy
<br /> 3,
<br /> SECTION I GENERAL CONDITIONS - CONTINUED - - SECTION I GENERAL CONDITIONS CONT,NQ�ED � `
<br /> SECTION I GENERAL CONDITIONS
<br /> - �
<br /> "„
<br /> PART 4 - RESPONSIBILITY OF THE CONTRACTOR - CONTINUED PART 7 - COMPLETION OF CONTRACT - psC , :` ; L h'-A,,,o" »' 0 e
<br /> Y.1 SCOPE OF WORK: THE WORK INCLUDED IN THE CONTRACT FOR THIS PROJECT 4.7 INSPECTIONS: CONTRACTOR SHALL BE REQUIRED TO ADHERE TO ALL REQUIREMENTS OF 72..2 FIXED PARTS OR MEMBERS SHALL BE .. ,Tr ,I'C�f 19�' 6E, FREE FI+pM
<br /> PART 1 GENERAL
<br /> CONSISTS OF THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND
<br /> OWNER'S INSPECTION PROGRAM. CONTRACTOR SHALL COMPLY WITH REQUIREMENTS FOR DfSTCRHONS. � ) .'e��, P " a q
<br /> m
<br /> PROPERLY INCIDENTAL TO THE COMPLETE NOTIFICATION, SITE PREPARATION REQUIREMENTS, COMPLIANCE, ON-SITE PRESENCE DURING 7.2.3 FINISHES SHALL BE. FREE FROM 8UBE3i.ES, STREAIrtS, PEED G, PITS OR OTHER 4
<br /> APPLIANCES REQUIRED IN CONJUNCTION WITH OR
<br /> tN INSTALLATION FOR THE SOUTHLAND CORPORATION. INSPECTION AND CORRECTION OF ANY DEFECTS OR RELATED PROBLEMS AS DIRECTED BY IRREGULARITIES, EXCEPT WHERE ROUGH MATERIALS MAY REQUIRED. F'INIS,H
<br /> CONSTRUCTION OF A GASOLINE S *` •'
<br /> PART 2 - AGREEMENT INSPECTING REPREDENTIVE. CONTRACTOR SHALL PROVIDE NO LESS THAN 4$ HOURS NOTICE SURFACES SHALL BE FREE FROM GREASE, MASTICS, FINGERPRINTS, S4RATCHEu
<br /> PRIOR TO INSPECTION. DENTS, CRACKS, STAINS, CHIPS OR OTHER DAMAGING EFFECTS "
<br /> 2. Y CONTRACTOR FORM SHALL BE SOUTHLAND CORPORATION "CONSTRUCTION AGREEMENT" ,;.g COORDINATION: GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING ALL PHASES 7,3 CLEANING: - ' - C'1
<br /> #4400157, DATED 11/88 AND RELATED INSURANCE SPECIFICATION, A COPY OF THIS CON- OF THE GASOLINE INSTALLATION WITH THE GENERAL CONTRACTOR IN CHARGE OF THE
<br /> 7.3,1 ALL WORK SHALL BE CLEAN AND READY FOR USE UPON COMPLETION," REMOVE
<br /> TRACT 15 AVAILABLE THROUGH LOCAL CONSTRUCTION OFFICE OR SITE MANAGER FOR REVIEW. BUILDING OR MAJOR PORTION OF THE PROJECT. THE BUILDING GENERAL CONTRACTOR AND
<br /> TEMPORARY TAPES, WRAPPING, COALING, PAPER LABELS AND OLHE.R ;ITEM$, 1".
<br /> 2.2 PAGE 3 -- ARTICLE II - OWNER: WHENEVER THE WORD "OWNER" APPEARS IN THE THE GASOLINE CONTRACTOR SHALL JOINTLY DEVELOP A MUTUALLY AGREEABLE SCHEDULE _
<br /> CONTRACT DOCUMENTS, DRAWINGS AND SPECIFICATIONS, IT SHALL BE DEEMED TO READ: AND TIMETABLE FOR COMPLETION ON THE GASOLINE INSTALLATION. TIMETABLE FOR BUILDING /.3.2 CLEANING METHODS MANUFACTURER'S I PROPRIETARY MATERIALS SHALL BE IN STRICT ACCNTS, A
<br /> "THE SOUTHIAND CORPORATION." AND GASOLINE SHALL COINCIDE AND COMPLIMENT EACH OTHER SO THAT ONE DOES NOT ORWITHERTERIALSINSTRUCTIONS. CLSAPPG SOLUTIONS, AGENTS, CULVERTS, WAXES
<br /> DELAY THE OTHER. OR OTHER MATERIALS SHALL BE ONLY AS APPROVED BY THE MANUFACTURER OF THE
<br /> 2.3 PAGE 3 -- ARTICLE III - CONTRACTOR: WHENEVER THE WORD "CONTRACTOR" APPEARS MATERIAL INSTALLED IN THF WORK.
<br /> IN THE CONTRACT DOCUMENTS, DRAWINGS AND SPECIFICATIONS, IT SHALL BE DEEMED TO
<br /> 7,3.3 CLEAN-UP: CONTRACTOR SHALL CLEAN UP ALL pFBRIS C'AUSFD BY THE WORK OF
<br /> READ "GENERAL GASOLINE INSTALLATION CONTRACTOR," SHOULD GASOLINE CONTRACTOR FAIL TO MEET DEADLINES AS ESTABLISHED BY THE -
<br /> THIS SECTION,, KEEPING THE PREMISES NEAT AT ALL TIMES.
<br /> PART 3 INTENT OF DRAWING AND SPECIFICATIONS SCHEDULE AND/OR HOLD UP THE COMPLETION OF THE OVERALL BUILDING PROJECT, PART S - CODES
<br /> 3.1 THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PRESCRIBE A COMPLETE SOUTHLAND CORPORATION RESERVES THE RIGHT TO RECTIFY THE SITUATION ACCORDINGLY.
<br /> WORK OR IMPROVEMENT WHICH THE CONTRACTOR UNDERTAKES TO DO IN FULL COMPLIANCE 4.9 CONTRACTOR SHALL PROVIDE OWNER WRITTEN CERTIFICATION AS TO THE FOLLOWING: 8,1 THE FOLLOWING COPES ARE MADE D PARI O THIS SHALL
<br /> L [IF9CATIER SAID CODES SHALL
<br /> DICTATE MINIMAL ACCEPTABLE STANDARDS. CODE SHALL- DE' ADHERED TO UNLESS LOCAL
<br /> WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL DO ALL WORK AS MAY BE 4,9,1 CERTIFICATION FROM LOCAL/STATE GOVERNING AUTHORITIES AS APPLICABLE FOR GOVERNING AUTHORITIES DICTATE HIGHER OR MORESTPINGFNTREQUIREMENTS WHICH
<br /> NECESSARY TO COMPLETE "THE WORK IN A SATISFACTORY AND ACCEPTABLE MANNER. CONTRACTOR CERTIFICATION/LICENSING FOR INSTALLATION OF GASOLINE STORAGE
<br /> SHALL TAKE: PRECEDENCE:
<br /> 3.2 THE CONTRACTOR SHALL, UPON DISCOVERY, REPORT ANY DISCREPANCIES IN THE TANK SYSTEM.
<br /> DRAWINGS AND SPECIFICATIONS TO THE OWNER'S CONSTRUCTION MANAGER. 4,9.2 CERTIFICATION FROM EQUIPMENT MANUFACTURES AND SUPPLIERS (TANKS, 8.1.1 NEPA .8.1 .2 PEI MANUAL FLAMMABLE"RECOMMENDED PRACTICES FOR iNSTALLARpN OF llPipERGR0UN0
<br /> 3.3 THE DRAWINGS AND SPECIFICATINS ARE INTENDED TO BE COMPLIMENTARY, ANYTHING PRODUCT LINES, GTM'S, ETC.) AS TO ATTENDING AND ACHEVING CERTIFICATION LIQUID STORAGE SYSTEMS " #RP-100 -87 (OR IAfEST EDITION)
<br /> MENTIONED IN THE SPECIFICATIONS AND NOT SHOWN ON THE DRWAINGS, OR SHOWN ON THE FROM APPROPRIATE COMPANY FOR INSTALLATION OF EQUIPMENT. PART g ^" WARRANTY / GUARANTEE
<br /> DRAWINGS AND NOT MENTIONED IN THE SPECIFICATIONS, SHALL BE OF LIKE EFFECT AS IF 4,9.3 CERTIFICATION ON APPROPRATE FORMAT AS TO INSTALLATION OF COMPLETE
<br /> SHOWN OR MENTIONED IN BOTH. GENERALLY, THE SPECIFICATIONS DESCRIBE 'WORK WHICH 9.1 EXCEPT WHERE SPECIAL GUARANTEES ARE REQUIRED IN EXCESS OF ONE (i) YEAR, THE : z
<br /> SYSTEM BEING PERFORMED IN COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL
<br /> CANNOT BE READILY IDENTIFIED ON THE DRAWINGS AND INDICATED TYPES, QUALITIES AND LAWS AND REGULATIONS. CONTRACTOR AGREES TO REPAIR OR REPLACE ANY DEFECT IN MATERIAL OR WORKMANSHIP
<br /> METHODS OF INSTALLATION OF THE VARIOUS MATERIALS AND EQUIPMENT REQUIRED FOR (BEYOND ORDINARY WEAR AND TEAR) TO THE SATISFACTION OF THE OWNER`S CONSTRUCTION
<br /> 4.9.4 CERTIFICATION THAT ALL EQUIPMENT EITHER SUPPLIED BY OWNER OR CONTRACTOR u
<br /> THE WORK. IT IS NOT INTENDED TO MENTION EVERY ITEM OF WORK IN THE SPECIFICATIONS HAS BEEN INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS BY PERSONNEL MANAGER FOR A PERIOD OF ONE (i) YEAR AFTER DATE OF ACCEPTANCE, NHF:THER IN HI5
<br /> WHICH CAN BE ADEQUATELY SHOWN ON THE DRAWINGS NOR TO SHOW ON THE DRAWINGS TRAINED AND QUALIFIED FOR THAT SPECIFIC ITEM. WORK OR IN THAT OF SUBCONTRACTOR'S, WITHOUT COST TO .THE OWNER. U
<br /> ALL ITEMS OF WORK DESCRIBED OR REQUIRED BY THE SPECIFICATIONS EVEN IF THEY ARE PART 10 - AS BUILT PLAN . AND DOCUMENTATION OF SUCH NATURE THAT THEY COULD HAVE BEEN SHOWN THEREON. 4.10 PAYMENT SHALL BE MADE PER ARTICLE 1113.2 OF THE CONTRACT,
<br /> 4.11 LIENS: CONTRACTOR SHALL PERMIT NO LIENS OF ANY KIND TO BE FIXED UPON OR 10. 1 UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE "A5-BUILT SITE PLAN"
<br /> AGAINST THE PROPERTY BY ITS LABORERS, MECHANICS OR MATERIALMEN, AND SHALL PLUMBVERIFYING
<br /> FINAL EC TRICALTION OF IMPROVEMENTS INCLUDING, BUT NOT LIMITED lO, 4G
<br /> PLUMBING ANp ELECTRICAL.
<br /> ALL MATERIALS OR LABOR FOR WORK WHICH 15 SHOWN ON THE DRAWINGS OR IS INDEMNIFY, PROTECT AND SAVE OWNER HARMLESS FROM AND AGAINST ALL SUCH -
<br /> REASONABLY INFERABLE AS BEING NECESSARY TO PRODUCE A FINISHED JOB SHALL BE CLAIMS AND LIENS. 10.2 CONTRACTOR SHALL KEEP PHOTOGRAPHIC JOURNAL OF` ALL PHASE' OF THE COMPtE7F,
<br /> PROVIDED BY THE CONTRACTOR WHETHER OR NOT THE WORK IS EXPRESSLY COVERED ININSTALLATION. PHOTOGRAPHS ARE TO BE PROPERLY DATED, IDENTIFIED AND FORWARDED , i7 U
<br /> 4.12 EQUIPMENT RESPONSIBILITY: CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING
<br /> U.
<br /> THE SPECIFICATIONS.
<br /> RECEIVING, UNLOADING, HANDLING AND PROVIDING PROTECTED INSIDE STORAGE FOR ALL TO LOCAL CONSTRUCTION OFFICE.
<br /> 3.4 THE CONTRACTOR, SUBCONTRACTORS AND ALL TRADES SHALL EXAMINE THE SITE AND OWNER SUPPLIED EQUIPMENT AND MATERIAL. CONTRACTOR SHALL INSPECT EQUIPMENT UPON c
<br /> ASCERTAIN EXISTING CONDITIONS PRIOR i0 THE START OF THEIR PORTIONS OF THE WORK. RECEIPT AND IMMEDIATELY REPORT ANY DAMAGE DUE TO SHIPPING i0 THE OWNER'S SECTION Ii INSPECTIONS / TESTING /L />�vIt
<br /> �/
<br /> BEFORE ORDERING MATERIALS OR DOING ANY WORK, THE CONTRACTOR SHALL VERIFY AND REPRESENTATIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO FAILURE --�__-�`. �'� � ���^-� n��_ -
<br /> BE RESPONSIBLE FOR THE CORRECTNESS OF ALL MEASUREMENTS AT THE SHE. ANY TO COMPLY WITH THESE REQUIREMENTS. DISPENSERS SHALL BE PROTECTED WITH SHIPPING PART 1 - GENERAL '
<br /> DIFFERENCES WHICH MAY BE FOUND BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS BOXES UNTIL STORE IS TURNED OVER FOR OPENING. CONTRACTOR SHALL BE SOLELY
<br /> OWNER'S 1.1 SCUPS: THIS SECTION COVER$ THE FURNISHING OF E. I_ LABOR, SERVICES AND
<br /> INDICATED ON THE DRAWINGS OR SHOP DRAWINGS SHALL BE SUBMITTED TO THE
<br /> RESPONSIBLE FOR ADEQUATE AND LOCKED STORAGE OF OWNER'S MISCELLANEOUS EQUIPMENT AS REQUIRED TO PROVIDE INSPECTION SERVICES OF ITIS GAS INSTALLATION.
<br /> CONSTRUCTION MANAGER FOR CONSIDERATION BEFORE PROCEEDING WITH THE ACTUAL EQUIPMENT, TO INCLUDE GASOLINE CONSOLE, PRIOR TO OPENING OF THE STORE. rr�� /. #
<br /> DIMENSIONS AND MEASUREMENTS INDICATED ON THE DRAWINGS UNLESS A SUBSTANTIAL ERROR PART G - INSPECTIONS
<br /> HAS BEEN MADE. IF SUCH AN ERROR SHOULD OCCUR, IT SHALL. BE BROUGHT TO THE 4.13 GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FILING OF RECEIVING FORMS AND > 1 1"` L��
<br /> MISCELLANEOUS CONFIRMATION OF EQUIPMENT RECEIVING INFORMATION A5 REQUIRED BY 2.1 INSPECTOR INSPECTIONS / TESTS SH
<br /> BE PERFORMED BY SOUTHLAND LOCAL p Gi ,*
<br /> ATTENTION OF THE OWNER'S CONSTRUCTION MANAGER AND RESOLVED BEFORE PROCEEDING LOCAL CONSTRUCTION OFFICE. CONSTRUCTION DEPARTMENT AND/OR APPOINTEU RFPRESENTAl IVE.
<br /> WITH WORK. 4. 14 GENERAL CONTRACTOR SHALL PROVIDE ALL PLUMBING, WIRING. MATERIAL. ANO LABOR AS I 2.2 NOTIFICATION CONTRACTOR' SHALL BF. RESPONSIBLE FPR NOTIFYING SCIUTHLAND'S { a c% x
<br /> 3.5 THE ORGANIZATION OF SPECIFICATIONS INTO DIVISIONS, SECTIONS AND PARAGRAPHS, AND CONSTRUCTION DEPARTMENT 48 HOURS PRIOR TO REQUESTED INSPECTION +`"
<br /> REQUIRED TO INSTALL OWNER SUPPLIED EQUIPMENT. INCLUDE MONIES IN BID PROPOSAL
<br /> THE ARRANGEMENT OF THE DRAWINGS ARE NOT INTENDED TO CONTROL THE CONTRACTOR D SPILIACE OF PRODUCT OCCUR AT ANY PHASE OF INSTALLATION OR 0
<br /> IN DIVIDING ITIS WORK AMONG SUBCONTRACTORS OR IN ITIS ESTABLISHING THE EXTENT OF FOR INSTALLATION OF OWNER SUPPLIED EQUIPMENT UNLESS NOTED OTHERWISE. 2.3 SPILLAGE SHOULD
<br /> WORK TO BE PERFORMED BY ANY TRADE PART' J ..• PROTECTION TESTING, LOCAL SOUTHLAND CONSTRUCTION DEPARTMENT AND ENVIRONMENTAL DEPART
<br /> ARE 1"Q BE NOTIFIED IMMEDIATELY ESTIMATED LOSS OF' PRODUCT AS 'WELL- AS ACTION c�
<br /> 4/ N
<br /> 3.6 DRAWINGS AND SPECIFICATIONS: DRAWINGS INDICATE GENERAL DESIGN AND ARRANGEMENTS 5.1 CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY LOSS OR DAMAGE CAUSED BY TAKEN I7 TO BE NOTED AND RECORDED -
<br /> DRAWINGS ARE DIAGRAMMATIC AND ARE NOT SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS HIM OR HIS WORKMEN TO THE PROPERTY OR EQUIPMENT OF THE OWNER, OR TO THE WORK
<br /> IT TUAL PLANS AND EQUIPMENT TO BE FURNISHED. VERIFY DIMENSIONS IN THE OR MATERIALS OF OTHER CONTRACTORS. CONTRACTOR SHALL MAKE GOOD ANY ILOSS, 2.4 REPRESENTATIVE!=CONTRACTOR AND PLUMBING SUBCONTRACTOR SHALL HREQUAVAILABLE
<br /> FROM ARCH EC ON SITE DURING: TESTING PROGRAMS. .FAILURE 7Q COMPLY' WITH THIS ISf2EIREMF_NT WfLh
<br /> FIELD. DAMAGE OR INJURY WITHOUT COST TO OWNER FOR SUCH LUSS OR DAMAGE. RESULT IN ANY CONNECTIONS AND/OR REPAIRS AS REQUIRED BEING PERFORMED BY OWNER
<br /> 5,2 CONTRACTOR SHALL PROVIDE AND MAINTAIN SUITABLE TEMPORARY SIDEWALKS, FENCES, AS REQUIRED COST OF SAID REPAIRS AND/OR CONNECTIONS SHALL BE DEDUCTED IROM
<br /> PART 4 - RESPONSIBILITY OF THE CONTRACTOR
<br /> ALL SPECIFICATIONS AND EXAMINED THE LIGHTS, SIGNS OR OTHER STRUCTURES AND DEVICES AS REQUIRED BY LAW, DO NOT CONTRACT AMOUNT AS REQUIRED TO SATISFY THE SITUATION, i-
<br /> 4.1 CONTRACTOR HEREBY DECLARES HE HAS READ L OBSTRUCT OR INTERFERE WITH TRAFFIC IN PUBLIC STREETS, ALLEYWAYS OR PRIVATE
<br /> DRAWINGS AND THAT HE UNDERSTANDS ALL CONDITIONS. RIGHT-OF-WAYS. IF WORK IS SUSPENDED, KEEP ALL ROADWAYS AND .SIDEWALKS IN 2 5 PROHIBITED WORK ATCONTRACTORS SHALL SCHEDULE WORK SUCH THAT NO WELDING
<br /> 4
<br /> 4,2 CONTRACTOR HEREBY DECLARES HE HAS VISITED THE SITE AND IS FIMILiAR WITH THE PROPER CONDITION AND PUT AND LEAVE THEM IN PROPER CONDITION AT TERMINATION OF T � . .. R EN
<br /> EQUIPMENT IS OPERATING ON SITE DURING INSPECTION PROGRAMS. NO NELD+NG OR OP,
<br /> CONDITIONS AFFECTING THE WORK. NO ALLOWANCES SHALL BE MADE SUBSEQUENTLY ON WORK. ),6 INSTALLATION REPORTS: SHOULD SOUTHLAND OR THEIR APPOINTED REPRESENTATIVES BE 1
<br /> FLAMES SHALL BE ALLOWED ON SITE AT ANY TIME DURING TEST PROCEDURES
<br /> i5 BEHALF OF THE CONTRACTOR FOR ANY ERROR NEGLIGENCE ON HIS PART. IF IN THE 5.3 CONTRACTOR SHALL SEND PROPER NOTICES, MAKE NECESSARY ARRANGEMENTS AND PERFORM I
<br /> E PERFORMANCE OF THE CONTRACT, LATENT CONDITIONS AT THE SITE ARE FOUND TO BE ALL WORK REQUIRED FOR THE CARE, PROTECTION AND MAINTENANCE OF PUBLIC UTILITIES UNABLE 1O HE"F RESENT AT SITE FOR PURPOSES OF FILING ANY INSPECTION REPORTS,
<br /> FQ MATERIALLY DIFFERENT FROM THOSE INDICATED BY THE DRAWINGS AND SPECIFICATIONS, OR CONTRACTOR SHALL BE ON OFFICE,
<br /> FOR COMPLETE INSPECTION AND HOTCFILINOF REPORT
<br /> UNKNOWN CONDITIONS UNUSUALLY INHERENT IN WORK OF THIS CHARATER SHOWN AND ON AND AROUND THE BUILDING SITE, ASSUMING ALL RESPONSIBlLTY AND PAYING ALL COSTS WITH LOCAL CONSTRUCTION OFRCE."WRITIEN REPORT SHALL INCLUDE PHOTOGRAPVaIC i
<br /> FOR WHICH THE OWNER MAY BE LIABLE. CONTRACTOR HEREBY DECLARES HE HAS VERIFIED
<br /> SPECIFIED, THE ATTENTION OF THE OWNER'S CONSTRUCTION MANAGER SHALL BE CALLED THE LOCATIONS OF THE EXISTING UNDERGROUND UTILITIES ON SITE PRIOR TO THE START TEST FAILURE:
<br /> CN OF ALL SYSTEM
<br /> PROCEDURES.
<br /> IMMEDIATELY TO SUCH CONDITIONS BEFORE THEY ARE DISTURBED. OF WORK. CONTR. HEREBY AGREES TO MAKE ARRANGEMENTS FOR AND TO PAY ALL CHARGES 2.7 TEST FAIL URF: 5HOUlU SYSTEM FAIL. ANY PORTION OF tE57 PROGRAM, CONTRACTOR
<br /> SHALT. IMMEDIATELY INSTIGATE PROCEDURES AS REOUIREUfO BRING SYSTEM INTO
<br /> CONTRACTOR HEREBY DECLARES THAT HE HAS READ AND IS FAMILIAR WITH THE APPLICABLE IN CONJUNCTION WITH THE RELOCATIONS OF EXISTING UTILITIES A$ REQUIRED. ITIS CONTRAC-
<br /> 4 3 SOILS REPORT. TOR SHALL BE RESPONSIBLE FOR ANY AND ALL UTILITY EASEMENTS, HOOK-UP CHARGES, TAP COMPLIANCE SH CULU FAILURE OF TESD DUE TO FACILITY WORK REQUIRE F,'XPENp1TURE OF. `� e
<br /> IK FEES AND SYSTEM DEVELOPMENT FEES AS NECESSARY FOR COMPLETION OF THIS PROJECT. ADDITIONAL MONIES FOR RESCHEDULING AND/OR RETESTING OF SYSTEM, CONTRACTOR
<br /> SHALL. BE HELD RESPONSIBLE FOR COMPENSATION ACCORDINGLY
<br /> CONTRACTOR SHALL BE RESPONSIBLE FOR STRICTLY ADHERING TO THE RECOMMENDATIONS 5.4 IF ALL OR PART OF THE 'WORK IS SUSPENDED FOR ANY REASON, CONTRACTOR SHALL 2 g CLEAN-EJP: .N THE EVENT PRODUCT SPILLAGE SHOULD OCCUR DURING CONSTRUCTION
<br /> OF SAID SOILS REPORT FOLLOWING ALL APPLICABLE PROCEDURES NOTED THEREIN. EXISTING PROPERLY COVER OVER, SECURE AND PROTECT ANY PORTION LIABLE i0 SUSTAIN INJURY OR DURING 'WARRANTY PERIOD DUE TO WORK PERFORMED BY CONTRACTOR, CONTRACTOR
<br /> WATER TABLE SHALL DETERMINE THE UTILIZATION OF TANK STRAPS AND TYPE OF BACKFILL FROM ANY CAUSE.
<br /> MATERIAL, SHOULD GROUND WATER OR CONTAMINATION BE DISCOVERED DURING TANK .5.5 PRODUCT PROTECTION: CONTRACTOR SHALL PROVIDE ADEQUATE AND SECURE PROTECTION SHALL BE RESPONSIBLE FOR CLEAN-UP ASMAY. BF REQUIRED
<br /> rn
<br /> EXCAVATION, 'WORK SHALL BE SUSPENDED PENDING REVIEW BY LOCAL SOUTHLAND OF PRODUCT IN TANKS UPON DEUVERLY UNTIL TURNED OVER FOR OPERATION. ALL FILL, 2.9 TEST. REPOI* UPON COMPLETION :OF TESTING PROGRAMS, REPRFSENTIVE OF TESTING/
<br /> N CONSTRUCTION REPRESENTATIVE. VENT AND GAUGING CAPS AND/OR OPENINGS SHALL BE SECURED AND PADLOCKED TO INSPECTION COMPANY 'SHALL 1.3E RESPONSIBLE FOR FILING COPIES OF TANK AND PIPING
<br /> 0 4.4 CONTRACTOR SHALL REPORT ANY OBJECTION TO MATERIALS, APPLIANCES, OR METHODS OF PREVENT VANDALISM OR THEFT. TEST/INSPECTION COPY
<br /> TO
<br /> `B SITE,LOCAL SOUTHLAND CONSTRUCTION OFFICE OR SHE
<br /> CONSTRUCTION SHOWN OR SPECIFIED TO THE OWNER'S CONSTRUCTION MANAGER AND OBTAIN PART 6 - SUBSTITUTION OF MATERIALS MANAGER WITH COPY TO JOB SITE, `
<br /> PART 3 -- TANK INSTALLATION INSPECTION
<br /> A DECISION BEFORE PROCEEDING. 6.1 MATERIALS AS SPECIFIED REPRESENT REQUIRED STANDARDS. SUBSTITUTION MAY BE pATs 15JUL91
<br /> 4,5 PROPOSALS: CONTRACTOR SHALL SUBMIT BID ON SOUTHLAND FORM PROPOSED IN WRITING WITH ADEQUATE SUPPORTING DATA FURNISHED. USE OF SUBSTITUE 3.1 SCHEDULE: CONTRACTOR SHALL BE R4:SPONSIHLE. FOR ADJUSTING SCHEpI�I E: S0 - _.
<br /> "GASOLINE INSTALLATION BID AND MATERIALS I5 DEPENDENT ON RECEIPT OF WRITTEN APPROVAL FROM OWNER'S APPROVED TANKS ARE TESTED AND SET IN YANK HOLE SAME PAY QF. DELIVERY. P GTNO;_._,_ _
<br /> ESTIMATE FORM." PROPOSALS SUBMITTED ON ANY OTHER FORM SHALL BE REJECTED AND REPRESENTATIVE. 3,2 EXCAVATION: ALL. EXCAVATIONS SHALL. HE COMPLETED WITH BEDDING MATERIAL IN 3Qf 9 d0 '
<br /> PLACE AND READY FOR INSTALLATION PRIOR TO TANK DELIVERY
<br /> RETURNED. PROPOSALS NOT COMPLETELY AND PROPERLY FILLED OUT SHALL BE
<br /> PART 7 - COMPLETION OF CONTRACTgRAWNs M51,
<br /> REJECTED. PROPOSALS SHALL INCLUDE MONIES FOR REMOVAL OF ALL EXISTING 3.3 ANCHORS: 'SHOULD t)N--SITE CONDITIONS REQUIRE A WET HOLE° TYPE iNSTALU1TfON
<br /> IMPROVEMENTS AS REQUIRED FOR GASOLINE INSTALLATION, 7.1 THE CONTRACT SHALL BE CONSIDERED FULFILLED, SAVE AS PROVIDED IN ANY MAINTENANCE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE PREPARATION OF (ANCLtETE:
<br /> ,k(5 PERMITS: CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING AND PAYING ALL STIPULATIONS, BOND OR BY LAW, WHEN ALL THE WORK HAS BEEN COMPLETED WITH FINAL ANCHORS (DEADMAN) PRIOR TO SCHEDULING TANK DELIVERY APFRGYEII Ci_
<br /> APPLICABLE STATE AND LOCAL PERMITS AND APPLICATIONS AS RELATED TO THIS WORK. INSPECTION AND ACCEPTANCE MADE BY ALL APPLICABLE GOVERNING BUILDING DEPARTMENTS, -
<br /> FIRE MARSHALLS OR OTHER JURISDICTIONS. 3.4 STRAPS ON SITE CONDITIONS REVEAL THE NEED FOR WET HOLE TYPE
<br /> COPIES OF PERMITS AND CERTIFICATES SHALL BE FORWARDED TO LOCAL SOUTHLAND INSTALLATION, CONTRACTOR SHALL IMMEDIATELY NOTIFY TANK MANUFACTURER AND i DRAWING
<br /> CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO COMMENCEMENT OF WORK, FINAL 7,2 WORKMANSHIP: SOIJTHIAND CONSTRUCTION DEPARTMENT OF SITUATION. SAID NOTIFICATION WILL. BE
<br /> CERTIFICATION OF ACCEPTANCE BY GOVERNING AUTHORITIES SHALL ALSO BE ON FILE 7,2.1 FRAME CORNERS AND JOINTS IN RUNNING MATERIALS OF THE SAME CROSS SECTION REQUIRED SO AS TO INCLUDE ANCHOR STRAPS WITH DELIVERY OF TANK PACKAGE_ ' I. � gp^�`��"'a�
<br /> WITH LOCAL CONSTRUCTION OFFICE OR SITE .MANAGER PRIOR TO THE PROCESSING OF PROFILE SHALL BE ACCURATELY FITTED TO NEAT CLOSED JOINTS, FREE FROM FSP,i -
<br /> FINAL. PAYMENT REQUEST OFFSETS ACROSS THE FINISH SURFACES AT THE JOINT.
<br />
|