My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:30 PM
Creation date
11/4/2018 2:26:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Costco Additive Manteca, CA# 1031 <br /> SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY <br /> 20-May 21 22 23 24 25 <br /> Concrete demo&Haul away Vac out existing tank hole FLY OUT _ OFF <br /> Plates down as required. Start tank hole dig <br /> Layout and saw cut concrete product line excavation and <br /> Set up work area and staging electrical trench to kiosk. _ <br /> fence&Job Trailer. <br /> Vent sump penetrations <br /> and set in p lace <br /> 28 27 28 29 30 31 1-Jun <br /> Fly In AM <br /> install penitrations begin tl PNE pfimsry test _ Secondary PNE <br /> _off off complete tank hole a pipe Tank set and inspections fitting rima and seconds complete additive sump Presure test <br /> trench excavation Backfill to Top of tank and Piping andglue i in . <br /> ballast. begin additive sump piping _ <br /> _ electrical U>G>install <br /> PM Agency primary sail and <br /> pressure test. <br /> glue up secondary <br /> 2 3 4 S 6 7 8 <br /> off __ AM Concrete Pour OFF <br /> PNE Secondary Test AM Agency and Jones complete backfill Prep for concrete and an <br /> Electrical U.G.install Covey re bury inspection pre pour inspections <br /> elictrical cover inspection <br /> PM ELD Pre Bury Test begin backfill set sono tube and required <br /> bollards <br /> PM Fly Home <br /> 9 11 12 13 14 15 <br /> Fly In AM <br /> _Off _ Start fill sump pipingand clean Complete fill sump piping _ AM Additive drop site detail ans striping work <br /> Electrical Pull wire manwa s and all com onants done in AM Final ELDTesting__ Pu a&Calibrate <br /> additive sum <br /> Data Disconnect PM elec.pulling wires PM VR program for sensors <br /> and VR Cold Start Agency OK for fuel drop <br /> Landscape&irrigation Landscape&irrigation confirm completion of <br /> restoration. restoration. additive drop form <br /> 16 27 18 19 20 21 <br /> OFF <br /> Electrical final Complete Cleaning and Jones Covey final walk <br /> Complete purgeand Calibrate DeMob from site. and other agency finals <br /> Site detail work Complete Punch List <br /> PM Full monitor Can with <br /> All sensors on line-possible <br /> agency's to observe. <br />
The URL can be used to link to this page
Your browser does not support the video tag.