My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:30 PM
Creation date
11/4/2018 2:26:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ,UL!LISTED DUALOY®PIPING <br /> IS 3000/L&3000 7LCX&CA <br /> ®I Name.W..ayne...A.._Bowman....... .... <br /> AMERON Date..oVember...2A......2.010...... <br /> INTERNATIONAL <br /> Fib Fiberglass Pipe Group Locason...Washing.ton..................... <br /> AMERONFibegia"Pipe Dividon•Bu kb..M Texas <br /> INTERNATIONAL DUALOY® 3000 <br /> INSTALLATION PROCEDURES TRAINING <br /> CERTIFICATION OF COMPLETION <br /> Ameron International Fiberglass-Composite,Pipe Division <br /> hereby certifies that <br /> Wayne A. Bowman <br /> PNE Construction <br /> has completed training on the proper installation procedures for the <br /> Dualoy 3000 UL Listed fiberglass piping systems indicated below, <br /> including procedures for installation of closed containment systems, <br /> as manufactured by the Fiberglass-Composite Pipe Division of <br /> Ameron International Corporation. <br /> DUALOY 3000 <br /> ® /L ® /LCX <br /> Washington <br /> Location of Training <br /> November 20, 2010 <br /> Date of Training <br /> David Luke <br /> Issued By <br /> Certificate valid for three years from date of issue <br /> 9720 Cypresswood Drive, Houston, TX 77070 <br /> FF66f16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.