My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 10:58:43 AM
Creation date
11/4/2018 2:50:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\INSTALL 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Cal. Code Regs. Tide 23, Division 3, Chapter 16, Underground Tank Regulations <br />(d) Owners or their agents shall certify that the installation of the tanks and piping, meets the conditions in subdivision (1) <br />through (4) below. The certification shall be made on a "Certificate of Compliance for underground Storage Tank Installation <br />Form C" (see Appendix V), <br />(1) The installer has met the requirements set forth in section 2715, subdivisions (g) and (h), <br />(2) The underground storage tank, any primary piping, and any secondary containment, was installed according to <br />applicable voluntary consensus standards and any manufacturer's written installation instructions; <br />(3) All work listed in the manufacturer's installation checklist has been completed; and <br />(4) The installation has been inspected and approved by the local agency, or, if required by the local agency, inspected and <br />certified by a registered professional engineer who has education and experience with underground storage tank system <br />installations. <br />Authority: Sections 252.99.3 and 25299.7. 1 feakth and Safety Code. <br />Reference: Sections 25281, 25284.1, 25291 and 25299. Flealth and Safety Code; 40 CFR 280.20, 280.40-280.45. <br />2636. Design, Construction, Installation, Testing, and Monitoring Requirements for Piping. <br />(a) Except as provided below, piping connected to tanks which were installed after July 1, 1987, shall have secondary <br />containment that complies with the requirements of section 2631 for new underground storage tanks. This requirement does not <br />apply to piping described as follows: <br />(1) vent or tank riser piping, provided the primary containment system is equipped with an overfill prevention system <br />meeting the requirements specified in sections 2635(b)(2)(13) or (C); or, <br />(2) vapor recovery piping if designed so that it cannot contain liquid -phase product; or, <br />(3) suction piping if the piping is designed, constructed, and installed as follows: <br />(A) The below -grade piping operates at less than atmospheric pressure (suction piping); <br />(B) The below -grade piping is sloped so that the contents of the pipe will drain back into the storage tank if the suction <br />is released (gravity -flow piping); <br />(C) No valves or pumps are 'installed below grade in the suction line. Only one check valve is located directly below <br />and as close as practical to the suctiun pump; <br />(D) An inspection method is provided which readily demonstrates compliance with subdivisions (A) through (C) <br />above. <br />(b) All corrodible underground piping, if in direct contact with backfill material, shall be protected against corrosion. Piping <br />constructed of fiberglass-reinForced plastic, steel with cathodic protection, or steel isolated from direct contact with backfill, <br />fulfills this corrosion protection requirement. Cathodic protection shall meet the requirements of section 2635(a)(2). <br />(e) Underground primary piping shall meet all of the Following requirements: <br />(1) Primary piping in contact with hazardous substances under normal operating conditions shall be installed inside a <br />secondary containment system which may be a secondary pipe, vault, or a lined trench. All secondary containment systems <br />shall be sloped so that all releases will flow to a collection sump located at the low point o€the underground piping. <br />(2) Primary piping and secondary containment systems shall be installed in accordance with an industry code of practice <br />developed in accordance with voluntary consensus standards. I'lie owner or operator shall certify that the piping was <br />installed in accordance with the above requirements of section 2635(d). The certification shall be made on the "Certificate <br />of Compliance for underground Storage Tank Installation Form C" (see Appendix V). <br />(d) Lined trench systems used as part ora secondary containment system shall be designed and constructed according to a code <br />2a <br />
The URL can be used to link to this page
Your browser does not support the video tag.