My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 10:58:43 AM
Creation date
11/4/2018 2:50:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\INSTALL 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veeder-Root Line Leak A*ation Guide 0 <br />Special Installations <br />Manifolded Line Applications <br />PLLD, WPLLD, and VLLD leak detection systems can handle product lines supplied by .multiple tanks and pumps, to a maxi- <br />mum of 8 tanks and pumps per product line. <br />Standard line leak sensing and check valve equipment should be installed at the primary pump. <br />To perform 0.2 and 0.1 gph tests, a non -vented SwiftCheck valve (PIN 330020-416), or new Red Jacket 65 psi relief valve (PIN <br />410153-002), or FE Petro 65 psi Relief Check Valve (FE PIN 402459931) should be installed on each of the other pumps sup- <br />porting the manifolded product line. The Non -Vented SwiftCheck Valve is rated to a maximum 70 gpm. <br />A relay on a Four -Relay module or 110 Combination module must be available to control each secondary pump. The standard <br />line leak modules will provide pump control output for the primary pump and the "Pump In" signal for the set. <br />A typical manifolded line installation for PLLD is shown below:. <br />To Dispensers <br />Flexible Pipe with <br />Flexible Pipe with Swivel or Union <br />Swivel or Union <br />Ball Valve Ball Valve Non -Vented <br />SwiftCheck SwiftCheck <br />Valve , `. Valve (if req'd.) <br />PLLfl � <br />Sensor <br />LJ G <br />Warning Tag Master Pump Slave Pump <br />p+r WdWks_epg Lower Numbered Tank Higher Numbered Tank <br />Transducer Installation - Red Jacket CPT and Quantum CPT Pumps <br />This installation procedure is to be used with Red Jacket CPT and Quantum CPT Pumps. <br />1. Install the Red Jacket CPT Transducer Adapter Kit (Red Jacket part number 144-326-5) following the instructions with the <br />kit. Thread the PLLD transducer in the mechanical LLD port of the pump. <br />IMPORTANT! Seal any pipe threads using a UL -classified, nontoxic pipe sealant suitable for the fuel involved. The figure <br />below illustrates two PLLD transducer installations in Red Jacket CPT pumps - consult "PLLD and WPLLD Check Valves' <br />on page 5, to determine what check valve you will need to install to perform your intended level of testing. <br />2_ Verify that the console has Version x19 or later software. <br />3. Verify that the CPT Controller has Version 1.02 or later software installed. <br />4. Locate red switch bank labeled S1 on the CPT's Controller CPU board, and verify that dip switch 2 is set to the Closed <br />position (to enable the PLLD precision line leak function), and dip switch 8 is set to the Open position (to disable the CPT's <br />line leak function). <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.