My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 10:58:43 AM
Creation date
11/4/2018 2:50:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\INSTALL 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />41 <br />Muniappa Naidu [EH1 <br />From: Harley Mattson [hmattson@barghausen.com] <br />Sent: Wednesday, January 23, 2008 10:39 AM <br />To: Muniappa Naidu [EH] <br />Cc: Mary Rose Holtz; David Painter <br />Subject: Costco Gasoline UST Installation Permit (BCE #12919) <br />Attachments: 12919 Kleinfelder email.pdf <br />Hello Mr. Naidu, <br />I left you a voicemail yesterday regarding the status of the Costco Gasoline UST Installation <br />Permit for the proposed Costco fueling facility in Manteca, California. I did receive a voicemail <br />yesterday around 2 pm that was indecipherable. There was a considerable amount of static <br />and I could not tell if it was you that had left me the voicemail or not. <br />At any rate, I need to know what the status is of the UST Installation Permit. I am aware of the <br />discussions that were held between you and David Painter and Mary Rose Holtz of my office. <br />We have consulted with the geotechnical engineer and have confirmed that the contractor will <br />be held responsible for determining whether shoring is needed during tank installation (see <br />attached). A note to this effect is always placed on our tank and electrical drawings. We do <br />not specify whether or not shoring is required. It is solely at the discretion of the contractor and <br />is based on field conditions and the geotechnical engineer's recommendations. <br />We have prepared revisions to the plans for the vent transition since our initial submittal of the <br />plans to your office. We will send you copies of the sheets that were revised. <br />Please confirm that the permit will be ready to be issued upon receipt of our revised sheets. <br />Harley Mattson I Senior Planner I <br />Barghausen Consulting Engineers, Inc. 118215 72nd Avenue South I Kent, WA 980321 <br />Phone: (425) 251-6222 1 Facsimile: (425) 251-8782 <br />1/23/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.