Laserfiche WebLink
GENERAL NOTES o <br /> G.C. TO INSTALL DEDICATED a <br /> UNSWITCHED FOURPLEX NEW AT ENTRANCE/EXIT AREA AT EDP ROOM ❑ SEE MATERIALS LIST (T-7) FOR SPECIFICATIONS ON EQUIPMENT <br /> OUTLET AT EDP ROOM UNDER //�� USED IN THIS CONSTRUCTION. co In <br /> (OWER <br /> WAREHOUSE <br /> FROMSCOPE <br /> WAREHOUSEWORK CVSTCO 115 16 13 <br /> VEEDERPRROOT 4 114 ❑ANEL ROOWNGOSHO SHOWN <br /> DRAWINGS.SCHEMATIC, <br /> FINAL LOCATIONS SHALL BE o <br /> FOR VIDEO SYSTEM) BUILDING n `� <br /> *SEE CONDUIT ❑ SALL PECIFICATIONS.ONS. SHALL BE INSTALLED AS PER MANUFACTURER'S � 13 Z <br /> INSTALLATION NOTES FUNCTIONS OF THE CONTINUOUS MONITORING: g 2 W CC J <br /> NOT TO SCALE SEE CIVIL PLANS 4 Q F U <br /> ❑ -MONITORING OF ALL ANNULAR SPACES. p OO Q <br /> FOR ROUTING -MONITORING OF ALL PRODUCT PIPING AND FILL SUMPS. <br /> INFORMATION 38 NK MO I ORING o U- <br /> -PROVIDE .1 GPH PRESSURE LINE LEAK DETECTION (PLED) OF <br /> 17 TA " PRODUCT LINES. w [L W V Z <br /> PROPOSED TRANSFORMER 17 13 O 36 ANK MONITORING -PROVIDE CONTINUOUS TANK LEVEL MONITORING. <br /> LOCATION o 0 0 2 1 FUTURE DIAGNOSTIC 59 -MONITORING OF ALL DISPENSER SUMPS. o = w ` Z Q O <br /> CONTRACTOR TO INSTALL (1)-3" o 0 8 _ THE CONTINUOUS MONITORING DEVICE . SHALL PROVIDE POSITIVE E3 m co CO <br /> I 1" FUTURE POWER/COMM 58 SHUTDOWN OF TURBINES AND DISPENSERS AUTOMATICALLY IN 0 <br /> UNDERGROUND PVC CONDUIT 5 r c <br /> THE EVENT OF A LIQUID RELEASE AND MANUALLY THROUGH THE J <br /> (SCHEDULE 80) OR AS REQUIRED CONTROLLER O . ° TANK RISER o O <br /> BY POWER COMPANY. ° ° 117 ENCLOSURE CD 18 ® . ESO SWITCH LOCATED ON THE CONTROLLER ENCLOSURE AND a W ED a U <br /> ° 00 AMP, 3-PH, 4W EMERGENCY GROUNDING REMOTE ESO SWITCH AS INDICATED ON SITE PLAN. U <br /> TYP. ALL TANKS VENT STACKS N <br /> METER & DISCONNECT 13 5 110 16 SHUT-OFF SWITCH FILL FILL FILL ( ) ALL WIRES ENTERING CONTROL PANELS, MAIN PANELS, AND SUB <br /> PANELS SHALL BE MARKED WITH PHASE TAPE U <br /> OVERFILL A" PHASE = BLACK Y Y Y Y Y <br /> CODING AS FOLLOWS: <br /> 2" C, (4) #3/0 THWN C.U. O <br /> N N y y N W <br /> + (1) #4 C.U. E.G. 116 115 ,_ „ W 0 V <br /> ALARM B PHASE = RED <br /> 123 911 PHONE TANK #1 TANK #2 TANK #3 "C" PHASE = BLUE o o ^o ^o a <br /> UNLEADED UNLEADED UNLEADED s <br /> REGULAR REGULAR PREMIUM ❑ ALL CONDUCTORS SHALL BE CONTINUOUS (WITH NO SPLICES) STRANDED <br /> CAMERA POWER COPPER WITH 75'C THWN INSULATION, OIL AND GAS RESISTANT. o o o <br /> —q �- O2 B-1 B_5 O4 39 SUPPLY LOCATION A SEAL 7❑ LEAV NG �FCLASS FI F MUST ED AREA LCONDUITSLED RFIRST EMERGENCETO ENTERING DFROM a m M K ^ � ~ <br /> 3 Al 4,16,18 A20,22 24 A26 28 30 BELOW GRADE MUST BE CONNECTED TO A SEAL-OFF. <br /> O °� TURBINE TURBINE TUf2BINE 8 ALL. CONDUITS SHALL HAVE INSULATED GROUNDING BUSHINGS INSTALLED AND <br /> DISPENSER POWER (TYP.) 8 12 O 19 O3 ❑ TIED TOGETHER W/ #6 BARE COPPER WIRE. BOND ALL INSULATED GROUNDING <br /> �® BUSHINGS AND GUTTER BOX BACK TO POWER CENTER GROUND. <br /> 1 I <br /> DISPENSER SENSORS (TYP.) 103 98 4 39 1 I ❑ ALL INSTALLATIONS SHALL BE PER N.E.C., ARTICLE 514. <br /> CAMERA (POWER) 13 49 = I I 4 VAC. MONITORING 1p INSTALL FOUR (4) 1" CONDUITS FOR SUBMERSIBLE PUMP POWER AS FOLLOWS: ONE ( 1) <br /> CAMERA FEEDS 141 14 56 20 85 131i-----0SPARE CONDUIT AT TURBINE SUMP #1 (UNLEADED), ONE ( 1) AT TURBINE SUMP #2 (UNLEADED), <br /> 10 TURBINE POWER 10 TWO (2) AT TURBINE SUMP #3 (PREMIUM/PREMIUM). ALL TURBINE POWER TO BE 1 " RIGID <br /> 103 10 98 42 40 STEEL, PVC COATED CONDUIT. ALL SEAL-OFFS AND ELECTRICAL BOXES TO BE SET MINIMUM <br /> FUTURE ELECTRICAL 75 VAC. MONITORING 20 6" ABOVE SUMP PENETRATIONS. TURBINE CONTROLLERS AT BUILDING SHALL BE LABELED AS <br /> EQUIPMENT J-BOXES 1 69 - ---OTURBINE POWER FOLLOWS: "A" TURBINE #1 UNLEADED REGULAR, "B" TURBINE #2 UNLEADED REGULAR, "C" <br /> )VAC. MONITORING TURBINE #3 PREMIUM UNLEADED, TURBINE #4 PREMIUM UNLEADED. <br /> 19 L— - - R <br /> 11 <br /> B-9 B-131> - ----@ TURBINE POWER VIDEO RECORDER SHALL BE INSTALLED IN THE EDP ROOM, FIELD VERIFY LOCATION WITH <br /> o O CONSTRUCTION PM OR MG2 PM. N <br /> 20 8 14 12 REMOTE ALARMS AT THE ENTRANCE/EXIT AREA SHALL INCLUDE AUDIBLE AND VISUAL ALARM, Q <br /> O O VEEDER-ROOT TLS 350. VERIFY LOCATION WITH CONSTRUCTION PM OR MG2 PM. 00 t S <br /> 103 98 4 47 I 13 VERIFY P.O.C., EQUIPMENT AND FEES WITH UTILITY COMPANY AND OWNER BEFORE J ® Q <br /> 1 ❑ INSTALLATIONS OF NEW ELECTRICAL SERVICE. O W <br /> CANOPY LIGHTS 13 7 <br /> 14 ALL EQUIPMENT SHALL BE U.L. APPROVED. ���[[ � <br /> 20 85 15 ° MOUNT E.S.O ON SUPPORT BRACE WELDED TO 6" BOLLARDS PER DETAIL #11 ON . SHEET Q J Q <br /> N98 42 4 * INSTALL (4) CONDUITS AS FOLLOWS: 15 A4.01 . 4' ABOVE ADJACENT GROUND LEVEL (TYP.) (WITH COLORED PLASTIC SLEEVES) U p1 a <br /> 1D3 35 (1) 1" C (PVC), (3) #10 AWG THWN, (1) #10 GND. 16 MOUNT E.S.O. ON ENCLOSURE EXTERIOR. <br /> RUN CONDUIT UP EXTERIOR OF FOR VEEDER ROOT OVERFILL ALARM FROM <br /> COLUMN INSIDE COLUMN WRAP CONTROLLER ENCLOSURE TO EDP ROOM V <br /> <10>B_17 19 B-2 (np•) & CONTINUED TO WALL AT MEMBER 17 VERIFY TRANSFORMER PAD LOCATION, ELEVATION AND APPURTENANT. <br /> O ❑ ENTRANCE/EXIT (FILL BY G.C.) 18 ALL TANK FILL AND VAPOR RETURN RISERS SHALL BE GROUNDED TO PREVENT STATIC <br /> 20CO16 0 (1) 2" C (PVC), (2) 25 PAIR CABLE, (1) #12 GND. DISCHARGE. <br /> 11 FOR TELEPHONE SERVICE AT CONTROLLER TO EDP BOXES FOR FUTURE ELECTRICAL EQUIPMENT AT EXIT SIDE COLUMNS SHALL BE <br /> 10 3 98 4 43 O I ROOM (CONTINUOUS) FILL BY DEPT. OWNER I.S. 19 EXPLOSION PROOF WITH SEAL-OFF. SET J-BOXES 2' ABOVE ISLAND FORMS. O <br /> f I ® (1) 1" C (PVC), FIBER OPTIC CABLE (12 STRAND, 5MM K JACKET) 20 ALL ELECTRICAL JUNCTION BOXES IN SUMPS AND DISPENSER PANS SHALL BE EXPLOSION LL <br /> CANOPY FASCIA LIGHTS 13 6 = TO EDP ROOM (CONTINUOUS) FILL BY OWNER I.S. PROOF WITH SEAL-OFF ENTERING AND LEAVING. SEAL-OFFS TO BE A MINIMUM OF 6" <br /> 20 85 17 1 CANOPY ABOVE (1) 2" C (PVC) ABOVE THE HIGHEST PENETRATION FOR TESTING PURPOSES. AT A MINIMUM, THE LAST 2' <br /> FUTURE CANOPY LIGHTS 13 8 E-3 2 (1) 18-6 STRANDED SHIELDED CABLE (KEYPAD) OF ANY CONDUIT RUN ENTERING OR LEAVING A BRINE FILLED DOUBLE WALL SUMP SHALL <br /> 103 98 42 44 (1) 18-2 STRANDED (DOOR CONTACTOR) BE PVC COATED RIGID METAL CONDUIT (TYP.) W � <br /> (1) 18-6 STRANDED (AUDIO DETECTOR) 21 ALL NONMETALLIC CONDUIT SHALL HAVE THE LAST 2' OF THE UNDERGROUND RUN TO THE L <br /> (1) 18-2 ZIP CORD (SIREN)-- POINT OF EMERGENCE OR TO THE POINT OF CONNECTION TO THE ABOVE GROUND RACEWAY <br /> FOR BURGLAR ALARM AT CONTROLLER ENCLOSURE TO BE THREADED RIGID METAL CONDUIT. THE RIGID NONMETALLIC CONDUIT INCLUDING RIGID <br /> 14 19 16 TO WAREHOUSE EDP ROOM AND CONTINUE W/ 1" C NONMETALLIC CONDUIT ELBOWS & FITTINGS ARE REQUIRED TO BE LOCATED NOT LESS THAN cc <br /> B-6 8-10 TO BURGLAR PANEL (CONTINUOUS) FILL BY OWNER I.S. 2' BELOW GRADE. ALL METAL CONDUIT & FITTINGS SHALL BE WRAPPED WITH 10 MIL TAPE, !pgypp s <br /> a 0 (ALL CONDUIT AND PULL ROPE BY G.C., CONDUIT FILL AS NOTED.) 3 WRAPS. ALL CONDUIT PENETRATION FITTINGS SHALL USE STAINLESS STEEL CONDUIT ca <br /> ENTRY NIPPLES AND SWEEPS. dQ d <br /> 20 8 18 13 20 85 19 15 OFEW WAREHOUSE AND GAS CONTROLLER ENCLOSURE. PROVIDE PUCONDUITS <br /> BOXES�ORWITHIN <br /> ONDUTS AS 2U � <br /> 103 98 4 45 <br /> Die <br /> FUTURE ETHERN 103 98 42 46 REQUIRED FOR EVERY 250 FEET OR AFTER (2) 90 DEGREE BENDS oQRaTE6s10pq�� <br /> ALL DISPENSER 51 (ALL CONDUITS TO BE ROUTED UNDER THE FREEZE LINE) 2y`` d <br /> (Np EMERGENCY NAL P. U66 m <br /> 15 110 SHUT-OFF SWITCH 7 14 <br /> Cal Tol Free LEGEND <br /> 1 (800) 227-2600 Electrical Site Plan % 613o/d1 <br /> TWO --- --- - --- --- --- -- --- EXISTING UNDERGROUND CONDUIT 01 v 14 <br /> BEFORE YYOU E_1 SCALE 1 10'-0" 29 - - P UNDERGROUND ELECTRICAL SERVICE CONDUIT TF OF <br /> UNDERGROUND TELEPHONE SERVICE CONDUIT <br /> Ll 11 11 11 N.E.C. HAZARDOUS AREA NOTES SERVICE DATA " <br /> EXPOSED CONDUIT � <br /> a a <br /> TANK - UNDERGROUND CONDUIT X <br /> ❑ B � x <br /> ��� ® O TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION (UNDERGROUND TANK - FILL OPENING) <br /> Fel EXTENT OF CLASS 1, GROUP D, DIVISION t LOCATION: SERVICE VOLTAGE: 3 PH 120/208V, 4W LOAD DATA: CLASS I HAZARDOUS AREA (PER NEC) YI YI 0&,I O <br /> ANY PIT, BOX, OR SPACE BELOW GRADE LEVEL, ANY PART OF WHICH IS WITHIN CONNECTED 36.5 KVA, ESTIMATED DEMAND 41.7 KVA SERVICE " g <br /> THE DIVISION 1 OR 2 CLASSIFIED LOCATION. CONDUCTORS 4#3/0 THWN & 1#4 GND. ® EXPLOSION PROOF SEAL ° <br /> 7 A EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION: METERING: PER UTILITY 9 x <br /> UP TO 18" ABOVE GRADE LEVEL WITHIN A HORIZONTAL RADIUS OF 10' FROM TYPE: UNDERGROUND INDICATES DISPENSER NUMBERING AND POSITION w <br /> TANK FILLS A LOOSE FILL CONNECTION AND WITHIN A HORIZONTAL RADIUS OF 5' FROM A BILLING INFORMATION: COSTCO WHOLESALE ® x <br /> TIGHT FILL CONNECTION. 999 LAKE DRIVE HV HIGH VOLTAGE <br /> UNDERGROUND ISSAQUAH, WA 98027 <br /> TANKS QB TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION (UNDERGROUND TANK - VENT-DISCHARGING UPWARD) ATTN: Kim Sanford LV LOW VOLTAGE <br /> EXTENT OF CLASS 1, GROUP D, DIVISION 1 LOCATION: _ .12 o <br /> WITHIN 3' OF OPEN END OF VENT, EXTENDING IN ALL DIRECTIONS. VR VEEDER-ROOT <br /> ° EXTENT OF CLASS 1 , GROUP D, DIVISION 2 LOCATION: <br /> SPACE BETWEEN 3' AND 5' OF OPEN END OF VENT, EXTENDING IN ALL E.S.O. EMERGENCY SHUT—OFF N gN <br /> DIRECTIONS. CAUTION: w Xa d a <br /> POTENTIAL UTILITY CONFLICT. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING E.D.P. ELECTRICAL DISTRIBUTION PANEL z N <br /> 08 <br /> 7 C CO TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION (REMOTE PUMP — OUTDOOR) AND NEW UTILITIES PRIOR TO CONSTRUCTION. SEE UTILITY CONFLICT NOTE THE �! N N 04 <br /> EXTENT OF CLASS 1, GROUP D, DIVISION 1 LOCATION: EXISTING WATER, STORM, AND SANITARY SEWER SERVICE SHOWN IS C CONDUIT ¢ If, C1.4 r, z N <br /> TANK TURBINES ANY PIT, BOX, OR SPACE BELOW GRADE LEVEL IF ANY PART IS WITHIN A z m > <br /> HORIZONTAL DISTANCE OF 10' FROM ANY EDGE OF PUMP. APPROXIMATE, BASED ON FIELD SURVEYS AND "AS—BUILT" RECORDS. THE F.F., FINISHED FLOOR z c I I w w N <br /> EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION: <br /> GENERAL CONTRACTOR SHALL "POTHOLE" THE EXISTING UTILITIES TO VERIFY THE <br /> � 3 <br /> WITHIN 3' OF ANY EDGE OF PUMP, EXTENDING IN ALL DIRECTIONS. ALSO UP DIAMETER AND LOCATION (INCL. ELEVATIONS) PRIOR TO CONSTRUCTION. ANY N E <br /> TO 18" ABOVE GRADE LEVEL WITHIN 10' HORIZONTALLY FROM ANY EDGE OF DISCREPANCIES IN THE LOCATION OF THE EXISTING PIPE OR INCOMPATIBILITY OF <br /> W.YOSEMITEAVE. nn <br /> THE DESIGN SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNERS nmu H LOto J > <br /> PUMP. REPRESENTATIVE, AND BARGHAUSEN CONSULTING ENGINEERS (425-251-6222). <br /> ? N N _1 <br /> Yvv UN p <br /> D TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION (DISPENSING DEVICE — PITS) c°G Q HNINNN <br /> EXTENT OF CLASS 1, GROUP D, DIVISION 1 LOCATION: LMUN CONFLICT NOTE: ¢ 2}NIN �,N o ON/"s i <br /> ANY PIT, BOX, OR SPACE BELOW GRADE LEVEL, ANY PART OF WHICH IS WITHIN <br /> NIWINHNINIM JGj 6°,�y <br /> THE DIVISION 1 OR 2 CLASSIFIED LOCATION, CAIJ�IOPk <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, a {HNHIflHHINNV Q i <br /> 7 D E F G O TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION (DISPENSING DEVICE — DISPENSER) DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE <br /> EXTENT OF CLASS 1, GROUP D, DIVISION 1 LOCATION: PLANS OR NOT BY POT HOLING THE UTILITIES AND SURVEYING THE HORIZONTAL <br /> DISPENSER SPACE CLASSIFICATION INSIDE THE DISPENSER ENCLOSURE IS COVERED IN DANIELSST ANSI/UL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE SITE <br /> AREA 87, "POWER OPERATED DISPENSING DEVICES FOR PETROLEUM PRODUCTS." CALLING UTILITY LOCATE 0 1 (800) 227-2600 AND THEN POT HOLING ALL OFTHE EXING UTILIES AT O� <br /> OF ONS OF NEW UTIUTY COSSINGS <br /> TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION (DISPENSING DEVICE — DISPENSER) PHYSICALLY VERIFYOWHETHEROOR¶NOT CONFLICTS EXIST. LOCATIONSTOF SAID a coNS <br /> EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION: UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED <br /> WITHIN 18" HORIZONTALLY IN ALL DIRECTIONS EXTENDING TO GRADE FROM (1) PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD Q, <br /> THE DISPENSER .ENCLOSURE OR (2) THAT PORTION OF THE DISPENSER OCCUR, THE CONTRACTOR SHALL CONSULT BARGHAUSEN CONSULTING COSTCO <br /> ENCLOSURE CONTAINING LIQUID HANDLING COMPONENTS. ENGINEERS, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH _ <br /> OTYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION (DISPENSING DEVICE — OUTDOOR) CONSTRUCTION. SITE CALE NOT TO SCALE E a Pj o <br /> 2 Hazardous Location 1. EXTENTUP TO CLASS <br /> ABOVE GRADE DLEVELDIVISION <br /> 2 LOCATION : w <br /> HORIZONTALLY OF ANY EDGE OF N <br /> E-" SCALE 1 "= 2q'—O' CONTROLLER ENCLOSURE. VICINITY MAP LOCATOR MAP <br /> c: <br />