My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 10:58:43 AM
Creation date
11/4/2018 2:50:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\INSTALL 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
♦ The standard 22" manway installed in single-wall tanks <br />❑ Has a load bearing capacity of 1200 lbs. <br />♦ Optional heavy duty manway. <br />❑ Has a load bearing capacity of 2400 lbs. <br />♦ Fiberglass heavy duty manways must be specified on <br />tanks equipped with helical heating coils, agitators or <br />pumps with a total downward load greater than 1200 lbs, <br />but less than 2400 lbs, <br />♦ Do not exceed 50 foot pounds torque during bolt tight- <br />ening or manway flange damage may occur. <br />Note: All 30" and 36" manways installed on single- <br />wall tanks and all manways on double-wall tanks <br />are heavy duty. <br />A13. SPECIAL INSTRUCTIONS FOR <br />COMPARTMENT TANKS <br />Kerosene must be separated from gasoline <br />with a Double-wall Bulkhead. Potable water <br />must be separated from all petroleum prod- <br />ucts with a Double-wall Bulkhead. Mixing of <br />kerosene and gasoline may result in explosion <br />or fire and possible injury or death. <br />+ tacn compartment should be tested as though it were <br />an individual tank. Use the applicable procedures <br />listed previously in this section (section A-3). <br />♦ Test the annular space as described earlier in this <br />section (note that the annular space is continuous <br />around all compartments including the space between <br />any double wall bulkhead). <br />♦ For single wall tanks in a double bulkhead: <br />❑ Connect compressor hose to the 4" bulkhead an- <br />nulus access fitting and pressurize to 5 psi maxi- <br />mum. <br />❑ Close the valve and disconnect the air supply. <br />❑ Soap the fitting and the tank shell wall for 5 feet <br />on each side of the fitting. Soap this area 360 <br />degrees complete around the tank. <br />16 <br />A14. SITE MONITORING WELLS <br />♦ New installations - place monitoring wells a minimum <br />of 1' outside of tank sides or ends. <br />♦ Existing installation - place monitoring wells a mini- <br />mum of 3' from tank sides or ends (see figure 25). <br />RGURE 25 <br />O <br />Monitoring Well <br />� <br />1 ft. Minimum -New Installation 4 <br />3 fit. Minimum -Existing Installation <br />• aacrcnii wrm same material as tank backfill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.