Laserfiche WebLink
t� <br /> Dec 10 08 02iO3p Eli 0 Iv Contractors Inc 2094616 4 P. 6 <br /> W#HL A at c.; It t I, I. I: A v FN 1; 1 NFC 14 1 -,N C - EN V I It 0 N M C.N I-A L 4 Y, nvI V, t: <br /> w'l I, T�' I No,., 11 ....... IT,', 71i•1110 N 11 9 <br /> February 13,2001 REVISED July 17,2001 <br /> S. Bravo Systems, Inc. <br /> 2929 Vail Avenue <br /> Commerce,CA 90040 <br /> ATT: Don Mukai.P.E. <br /> RE: THIRD PARTY APPROVAL <br /> CCR Title 23,Division 3,Chapter 16 Sections.2631(d)and 2636(b) <br /> BRAVO UL EPDXY COATED STAINLESS MEL CLAMP <br /> CALIFORNIA WATER RESOURCES CONTROL BOARD LETTER <br /> DATED 11/14/00 TO ALL LOCAL AGENCY UNDERGROUND STORAGE <br /> TANK PROGRAM MANAGERS AND CUPAS <br /> I have examined and wviCwcd the following items on the Bravo protected steel clamps fur <br /> use on boot systems used on buried petroleum product lines: <br /> I Bravo UL Epoxy Coated Stainless Steel Clamps, <br /> 2. Data on stainless steel worm clamps, <br /> 3. Appendix#6B UL test reports on steel coating. <br /> 4. Appendix#8 Product information on Valkent 116 Polyareffiane Sealant, <br /> S. Bravo installation instructions. <br /> Upon review of the manufacturing procudurcs and the employment of the materials used in <br /> the construction and installation of the Bravo UL Epoxy Coatcd stainless Steel Clamp <br /> System, it is my opinion and conclusion that sound engineering design and engineering of <br /> this product will provide isolation ofthL;clam p from the backfill in buried lines. <br /> The review and conclusion were made in accordance with the requirements of Sections <br /> 2631(d)and 2636(b)listed <br /> /James H. Ray <br /> Sr. Civil Engin=r <br /> 3 <br /> 1il-11,1. A T.,I,u•I 1. t;j" <br /> .: .•I 1 1,1-n P.-.. A7. VtN,:111,VEK. WA <br />