My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:12 PM
Creation date
11/4/2018 3:09:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
2/15/2018 12:34:40 AM
QuestysRecordID
3795241
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dec 10 08 02: 03p Elite Iv Contractors Inc 209461 2 p. 7 <br /> L <br /> 1.f 1(1,1..T.INf'. <br /> Upon review of the manulhcmring procedures and the empluymcnt of the muteriuls used in <br /> the construction and installation of the Bravo Flex Boat systcni utilizing adhesive FRY pipe <br /> systems and UL epoxy coated stainless steel hose clamps with isolation sealant systema, it <br /> is my opinion and conclusion that sound engineering design and cngtnccring of this product <br /> will eliminate or provide isolation of the staintcss steel liosc clamp lium the backfill in <br /> buried lines. rr <br /> James FI.Ray <br /> Sr,Civil hm;incer <br /> I ' <br /> IsnI I iiV F, w 1 A MANIA, CA M A A:IN L.,'., CA Pi 1'ALUmA. CA <br /> !d111 dM 1.-1111, ..:A 4(-1\"'; •I�\LC, AV Vn r,111 I.,V I..It. W'A <br />
The URL can be used to link to this page
Your browser does not support the video tag.