My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:12 PM
Creation date
11/4/2018 3:09:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
2/15/2018 12:34:40 AM
QuestysRecordID
3795241
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 • RECE4VEQ <br /> Secondary Containment Testing Report Form JAN 17 2012 <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of thisform to report results for all components tested The completed form, writtEM1N) FAI MFALTH <br /> printouts from tests(f applicable),should be provided to the facility owner/operator for submittal to the FEW*�SEPMjQWncy. <br /> 1. FACILITY INFORMATION <br /> Facility Name: C" U--AIJdODate of Testing: 'Z f I 2011 <br /> Facility Address: 50g tOODI�A` GpM CA. 9520 <br /> Facility Contact: Surinjeir Sin h Saini Phone: - tF� 3c4 <br /> Date Local Agency Was Notified of Testing: )1-,30-11 <br /> Name of Local Agency Inspector(fpresent during testing): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: V-eU 1?TV2VLZt)1-d S l7 t e,Es ( C— <br /> Technician Conducting Test: G al a G Z <br /> Credentials: CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester <br /> License Type: I License Number: <br /> Manufacturer Training <br /> Manufacturer Com oncrd s Date TraininR Ex ices <br /> 1tJc4D&-,). - STS l2- o ,. <br /> Cz-- GeV icc IW64 - 2g - n <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> bt�1JJLAVL 13'7 9 ❑ ❑ ❑ LIDC, '7 8 ❑ ❑ ❑ <br /> A,l"%.W— q l R ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> )tA2 pie-svL M ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ►iy 4�'� id ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> 15CV6DA¢. I 9 ❑ 1 ❑ ❑ 1 ❑ 1 ❑ ❑ 1 ❑ <br /> gEco IESCti R ❑ I ❑ ❑ ❑ ❑ ❑ ❑ <br /> S%)"IP z ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ST P ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> X71cSkL -1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDS I 2_ '4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> 0DC, a d ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Ix 56 ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,descnbe what was done with the water after completion of tests: <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in this docunsent are accurate and in full compliance with legal requirements <br /> Technician's Signature: - �� - � y Date: 12-11012.1c,11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.