Laserfiche WebLink
SW RCB,January 2002 ! • Page of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ;4 Tank Manufacturer D Industry Standard Professional Engineer <br /> D Other(Spec) <br /> Test Method Used: D Pressure Vacuum ❑ Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: VAWL" thort P C' ooE Equipment Resolution: ! ".v <br /> Tank# 1 -07 Tank# Z' 91 Tank# ,3j-Ott Tank# <br /> Is Tank Exempt From Testing?' D Yes 00 D Yes No D Yes PNo D Yes D No <br /> Tank Capacity: N2 1220 1 Z I ZZO 12 1 ZZO <br /> Tank Material: gtw S reel, fZ� .s Tu t- W 6 4- <br /> Tank Manufacturer: -IfpGw2 voot:L vinolZ <br /> Product Stored: 8UA12cEd G O16SE L <br /> Wait time between applying \ <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: d l-( :S SAd I /1 6oAti <br /> Initial Reading(Rj): /o "14 ta" /o"14 <br /> Test End Time: 10'. 90Ae7 /p•�{"Q /a.:SPH <br /> Final Reading(RF): /O , µ /O a14q /o "N <br /> Test Duration: 1144- 1 402 I <br /> Change in Reading(RF-Rj): 0149 O '1l( 0 Fl <br /> Pass/Fail Threshold or Criteria: -i- _ 14 <br /> Test Result: Pass ❑Fail Pass ❑Fail Pass D Fail D Pass D Fail <br /> Was sensor removed for testing? �t Yes D No DNA )4Yes D No DNA )aYes D No [INA D Yes []No DNA <br /> Was sensor properly replaced and 91Yes D No DNA )0 Yes D No D NA *es D No D NA D Yes D No DNA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommemtedfollow-up forfailed tests) <br /> 'Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)) <br />