Laserfiche WebLink
SWRCB,January 2002 0 Page_of <br /> 7. UNDER-DISPENSER CONTAINMENT DC TESTING <br /> Test Method Developed By: 0 UDC Manufacturer 0 Industry Standard &Professional Engineer <br /> D Other(Spec) <br /> Test Method Used: D Pressure D Vacuum Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: 7 L:Ccg.s Fs- I S Equipment Resolution: 0 .otao/" <br /> UDC# UDC# 3 UDC# 540 UDC# 7 <br /> UDC Manufacturer: V 0 16"L)6 t3aAJo aiA�u <br /> UDC Material: ST576 L $T EL 5 L- S L <br /> UDC Depth: 91' <br /> Height from UDC Bottom to Top U C� <br /> of Highest Piping Penetration: U <br /> Height from UDC Bottom to U •• '' O f) <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> C-teSLin C-a.-V ArGI✓ (; �N C Ci <br /> Portion of UDC Tested 71, 7 •• 7 ' -7 ' <br /> Does turbine shut down when 0 yes D No RNA <br /> UDC sensor detects liquid(both D Yes 0 No SNA D Yes 0 No $NA D Yes D No 6INA <br /> product and water)?. <br /> Turbine shutdown response time <br /> Is system programmed for fail- ra Yes D No 0 NA 9,es 0 No D NA AYes D No D NA pYes 0 No DNA <br /> safe shutdown?' <br /> Was fail-safe verified to be Yes D No DNA &fZ,as D No DNA VYes 0 No DNA Ues D No DNA <br /> operational?' <br /> Wait time between applying \ <br /> pressure/vacuum/waterand /U Hr� /J/llAi (Lt 1-4 14 /0 v <br /> starting test <br /> Test Start Time: It :3s-4" IL J: AM Iq 3 R,-1 cc t't t <br /> Initial ReadinE (R,): •,Igc7" /• 3C%-7 CJ 37 <br /> Test End Time: 71 : CD 4,"l /( =5Z+A t '.S 1 '3s—pM <br /> Final Reading R. : o •V14I53 " <br /> Test Duration: /,S.1-1 IN I6'M/� tSMII-� IJ"f�tr l�-7 <br /> Change in Reading F-Rj <br /> 0:4)0rV', 0.0opq't G.CC)C8a p.•DO' 02' <br /> Pass Fail Threshold or Criteria: ' o <br /> Test Result: Pass D Fail A Pass D Fail Pass D Fail Pass 0 Fail <br /> Was sensor removed for testing? D Yes D No qNA C Yes 0 No SNA D Yes D No YNA 0 Yes ❑No SNA <br /> Was sensor properly replaced and D Yes 0 No [[NA D Yes 0 No GYNA D Yes D No RiNA 0 Yes 0 No Q NA <br /> verified functional after testing? <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> ` If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UPC must be tested. (See SWRCB LG-160) <br />