Laserfiche WebLink
SWRCB,January 2002 0 • Page_of_ <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard $'Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: 0 Pressure 0 Vacuum 'RHydrostatic <br /> C Other(Spec) <br /> Test Equipment Used: OCA f3 S- S Equipment Resolution: O-pO01 <br /> SUMP# I- Pj Sump# 'Z- I sump#3-1577 Sump# <br /> Sump Diameter: t48 ` ,E3' qg " <br /> Sump Depth: G3," &1?- <br /> Sump <br /> 02Sump Material: g 17-) <br /> Height from Tank Top to Top of 11 ' <br /> Highest Piping Penetration: n /9 <br /> Height from Tank Top to Lowest ZZ / ' t <br /> Electrical Penetration: Z Z <br /> Za <br /> Condition of sump prior to testing: GCZ 41J GlcA, C <br /> Portion of Sump Tested' 4 ' z ,/'' Z " <br /> Does turbine shut down when yes ❑No ❑NA <br /> sump sensor detects liquid(both *Yes 0 No DNA 6Yes 0 No DNA 0 Yes 0 No 0 NA <br /> product and water ?' <br /> Turbine shutdown response time SSG 37 s6c, ScC <br /> Is system programmed for fail-safe Oes 0 No ❑NA *yes 0 No C NA gYes 0 No 0 NA []Yes 0 No DNA <br /> shutdown?' <br /> Was fail-safe verified to be Yes 0 No 0 NA %Yes 0 No DNA KYes C No DNA 0 Yes 0 No [INA <br /> operation 1?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting l a#-I It-) l O <br /> test: <br /> Test Start Time: 56 A/-j 12 :2q /4-1 <br /> Initial Reading(Ri): q •3371 4 7873" <br /> Test End Time: /U : /D A" 1/ : e)i8 /2 : 114 12" <br /> Final Reading(RF): '/• (//o t'' if .334.5 ' 4 -7 8-6.4 <br /> Test Duration: .` G M 1 rte•' &-"1 A.� /5 F'11►) <br /> Change in Reading(RF-R[): o. C�cea9 " D .pop20- 00/9 ', <br /> Pass/Fail Threshold or Criteria: + -p.Oa2 a/- 4),zx•2` 1/•-u •na Z <br /> Test Result: X Pass 0 Fail B'Pass 0 Fail 9 Pass 0 Fail 0 Pass 0 Fail <br /> Was sensor removed for testing? Yes 0 No 0 NA .5iLl a p No 0 NA ' Yes 0 No CNA C Yes C No DNA <br /> Was sensor properly replaced and %;�'1'es C No DNA dYes 0 No CNA 9Yes 0 No DNA 0 Yes C No C NA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />