My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:19 PM
Creation date
11/4/2018 3:15:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 2013-2015.PDF
QuestysFileName
COMPLIANCE INFO 2013-2015
QuestysRecordDate
2/15/2018 7:45:41 PM
QuestysRecordID
3796185
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12-05-'14 13:12 FROM- Westar Envmt Inc. +559-277-0106 T-538 P0005/0006 F-206 <br /> SWRCB,January 2002 Page_of_ <br /> 6. PIPING SUMP TESTI <br /> Test Method Developed By: Sump Manufacturer e1ndustry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum y rostatic <br /> Other(Specify) <br /> Test Equipment Used: co^j Equipment Resolution: <br /> Sump:#::]= Sump# ( Sump# 8 Sump# <br /> Sump Diameter: qy 11/V <br /> Sump Depth: <br /> Sump Material: <br /> Height from Tank Top to Top of � <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: ooKJ o�� a O <br /> Portion of Sump Tested' 13 S Jc <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No Yes No Yes No Yes No NA <br /> product and water)?' <br /> Turbine shutdown response time 0 0 <br /> Is system programmed for fail-safe Yes No �I Yes No Yea No N Yes No NA <br /> shutdown?' <br /> Was fail-safe verified to be Yes No Yes No Yes No Yes No NA <br /> o erational?' <br /> Wait time between applying <br /> pressure/vacuum/water and starting C"qtj rj t� 5-111),) <br /> test: <br /> Test Start Time: /;RI //ioti <br /> Initial Reading(Rd: q l$ a hyo -f as91 2213 ki 735- 2 27 <br /> fest Pad Time 1.3G l 3(0 (al 101;/7 r5_FinalReading(Ra): yTest Duration:Change inReading(RF-Rb: fp,poly a0.0 .�p,000y �0,4ax Pass/Fail Threshold or Criteria: }/a,e,� +/o,doa� '£.4.4.50 +�A.OW Test Result: Pa Fail Fa Fail Pass Rail <br /> Was sensor removed for testing? Y No NAgT No NA No NA Yes No NA <br /> Was sensor properly replaced and Y No NA Y ) No NA No NA Yes No NA <br /> verified functional atter testing? <br /> Comments—(include infnrmarion on repairs made prior to resting,and recommended follow-up for failed tests) <br /> WENT/,t IICALI I'I <br /> �GPARTlyINT- <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to=of the questions indicated with an <br /> asterisk(R)is"NO"or"NA",the entire sump must be tested. (See SWRCB LO-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.