Laserfiche WebLink
12-05-'14 13:12 FROM- Westar Envmt Inc. +559-277-0106 T-538 P0006/0006 F-206 <br /> SWRCE,January 2002 Page_of_ <br /> 7. UNDER-DISPENSER CONTA.INME TING <br /> Test Method Developed By: UDC Manufacturer r1ndustry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum Hytlrostatic <br /> Other(Specify) <br /> Test Equipment Used: p J EquipmentResolution: -t ^ O•o0d�0 <br /> UDC# UDC# UDC# y UDC# 7 <br /> UDC Manufacturer: LdAytJ6 WAVi4i A Ngo LJA YAJJ9 <br /> UDC Material: AA 6 L M tru, m772 <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: o� <br /> Height from UDC Bottom to 6 <br /> Lowest Electrical Penetration: <br /> Condition of ADC prior to <br /> testing: �oC,a t��b y�n0 CjooO <br /> Portion of UDC Tested' <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes NoYes No � Yes No Yes No <br /> ( <br /> product and water)?' (/ <br /> Turbine shutdown response time <br /> Is system programmed for fail- Yes No 'Yes No (N3 Yes No (N3 Yes No <br /> safe shutdown? <br /> Was fail-safe verified to be Yes No Yes No O Yes No t N Yes No <br /> operational'?* <br /> Wait time between applying <br /> pressure/vacuum/water and 5m lr) �y11 r/ S ✓t 1 TM Irj <br /> starting test <br /> Test Start Time; :s f 55 : 5 ; 15 Z 3 (1 a <br /> Initial Reading(Ri): 3 <br /> Test End Time: <br /> Final Reading(Rr.): S919 I 9..3• o! 0.33 a, 3z`/a YyaJ,q770 A P, a <br /> Test Duration: ✓J S I 5 N ,v <br /> Change in Reading(RP-Ri): 4o•aaa4 -o,od®o .0,0009. '4'aml - ,w9. -,9,040 40,0e04a,0019- <br /> Pass/Fail Threshold or Criteria: f.a,oe a aa9d h^o ^ -a,003r' i^a•as ^e eax o, -a.aa,D <br /> Test Result: Pas Fail Pa Fail Fail ass Fa' <br /> Was sensor removed for testing? No ,� No No No N <br /> Was sensor properly replaced and No ( Nr No N No Q1 No N� <br /> verified functional after testing? <br /> Comments-(include inlormatiou on repairs made prior to testing, and recommended ollow-up for ailed rests) <br /> AID JGLnz � Akio aagz5 <br /> REE)EK <br /> DE 5 2014 <br /> t if the entire depth of the UDC is not tested,specify how much was tested. If the answer to g"of the questions indicated with an <br /> asterisk(�)is "NO"or"NA",the entire UDC must be tested. (See SWRCE LG-160) <br />