Laserfiche WebLink
S WRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING APR 2 1 2015 <br /> Test Method Developed By: X Piping Manufacturer ❑Industtg�(aV190N T ipnal Engineer <br /> ❑Other(Spec�) I�jj� A.1u •co.oT,er_niT <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx. 120' Approx. 110' Approx. 130' <br /> Product Stored: Regular 87 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 Piping Sump#3 <br /> Wait time between applying 15 Minutes 15 Minutes 15 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:20 9:35 9:40 <br /> Initial Reading(R,): 3 Psi 3 Psi 3 Psi <br /> Test End Time: 11:20 10:35 10:40 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-R,): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> Original equipment Test Boot on Regular 87,has become non pliable and will not tit over Secondary Pipe for Test. <br /> A new split repair Test boot was installed on Regular 87 Secondary Pipe for proper fit and seal,prior to testing. <br />