Laserfiche WebLink
7 <br /> SWR <br /> CB,January 2002 Page_of_-.,. <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: D UDC Manufacturer D Industry Standard Professional Engineer <br /> D Other(Specify) —- <br /> Test Method Used: D Pressure D Vacuum Hydrostatic <br /> D Other(Spec) _ <br /> Test Equipment Used: Equipment Resolution: <br /> UDC UDC# UDC# UDC# <br /> UDC Manufacturer: <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: - <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes No DNA Yes No DNA Yes No DNA Yes No DNA <br /> product and water)? <br /> Turbine shutdown response time <br /> Is system programmed for fail- Yes D No D NA Yes D No D NA Yes D No D NA Yes D No DNA <br /> safe shutdown? <br /> Was fail-safe verified to be Yes No DNA Yes No DNA Yes No DNA Yes No DNA <br /> operational? -- -- <br /> Wait time between applying <br /> water and starting test — <br /> Test Start Time: <br /> Initial Reading(Rj): — <br /> Test End Time: - <br /> Final Reading RF): - <br /> Test Duration: — <br /> Change in Reading(RF-Ri): --- <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: Pass D Fail Pass D Fail Pass CI Fail Pass D Fail <br /> Was sensor removed for testing? Yes D No D NA Yes D No D NA Yes D No DNA Yes D No D NA <br /> Was sensor properly replaced and Yes D No DNA Yes D No D NA Yes D No ❑NA Yes D No D NA <br /> verified functional after testis ? -__ <br /> Comments- (include information on repairs made prior to testing and recommended follow-up forpiled tests) <br /> Not Tested with this event! <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />