My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
845
>
2300 - Underground Storage Tank Program
>
PR0231964
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 2:41:36 PM
Creation date
11/4/2018 3:30:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231964
PE
2381
FACILITY_ID
FA0003984
FACILITY_NAME
PEP BOYS #0710
STREET_NUMBER
845
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734514
CURRENT_STATUS
02
SITE_LOCATION
845 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\845\PR0231964\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
3/12/2012 8:00:00 AM
QuestysRecordID
139949
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY-21-96 16:39 FROM:WESTON NCA IO:5106037901 <br /> • Ifts/ber name. <br /> • Any injuries that may have occurred. <br /> • Name, type, and quantity of hazardous materials/wastes involved, to the extant known. <br /> • Any other information requested by the attendant. <br /> After ordering emergency medical assistance, the discovering employee shall immediately <br /> notify the Emergency Coordinator, who then implement the following: <br /> • Restrict public access to the spill. If spill occurs inside store, the Emergency <br /> Coordinator shall evacuate customers and any non-responding employees to the <br /> evacuation area shown on Figure 1. Customers are free to leave the site, but <br /> employees must stay in the evacuation area until they are told to return to work or go <br /> home by the Emergency Coordinator. In the event of an emergency, customers are <br /> not allowed to wander the site or interfere with the emergency response crews. <br /> • Quickly determine the magnitude of the spill. If the Emergency Coordinator <br /> determines that the release is uncontrollable with the equipment on hand or that <br /> contamination outside the facility has occurred, he/she will contact the Environmental <br /> Department Manager per the attached Emergency Notification List. As many counties <br /> an informal polic that spills less than one gallon that do not present a hazard do not <br /> need to be reported_ the Environmental Department Manager will only be called for <br /> spills greater than one gallon. <br /> • The Environmental Department Manager will contact the Environmental Cleanup <br /> Contractor and is responsible for authorizing any work necessary under this plan. <br /> • Identify the cause of the spill and contain spill with spill kit (if possible). Contain spill <br /> so as to prevent flow to sewer or storm dram. <br /> • Take appropriate measures to stop the spill(e.g., upright the container). <br /> • Recover material (as much as possible) and arrange for proper disposal with the <br /> Environmental Department Manager and Emergency Cleanup Contractor. <br /> Recovered material should be placed in the overpack drum provided with the spill kit and <br /> the drum should be labeled with a"Hazardous Waste" label. The label shall be completely <br /> filled out, including the accumulation date (date of cleanup), store address, EPA ID <br /> number, EPA and state waste codes, hazardous properties, and DOT shipping mane. <br /> The overpack drum containing recovered material shall be kept in the hazardous wastes <br /> accumulation area in the store toolroom until it is removed by the Environmental Cleanup <br /> Contractor. As Pep Boys is only a generator, the drum will be taken offsite for treatment <br /> and/or disposal at an appropriate hazardous waste facility within 90 days. Do not place <br /> the recovered materials in the waste oil underground storage tank_ <br /> PEP-BOYs.DOC 4 5n0r96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.