Laserfiche WebLink
PLUG UNUSE=D BUNG <br /> 4" RISER ASSEMBLY I <br /> FOR TANK GUAGE <br /> INC. NOTE: j SUB PUMP SEE L7 } FILL SPILL CONTAINMENT <br /> RYDER®E TRUCK ■ �� ®TES: <br /> I I MANHOLE PHIL SC-3600 WCS <br /> DEMOLITION <br /> CONC. SMALL EXTEND A MINfMUM <br /> DRIVE, ST®CKTON C�1 OF 2'—a" BEYOND THE ENDS AND i 4" RESER GAP ' !` <br /> 3633 DUCK CREEK ® ti SIDES OF THE TANKS (SEE SITE I RESERVOIR MONITOR <br /> 1. SAWCUT, BREAK AND REMOVE CONCRETE TANK;OVER. EXCAVATE AREA NEEDED TO REMOVE ALL PLAN FOR ACTUAL TAN SLAB SIZE). i I { ) <br /> EXISTING UNDERGROUND FUEL PIPING. BRINE FILLED <br /> ? POMECO COMPOSITE I <br /> TCOPE OF WORK 2. CUT AND REMOVE PRODUCT LINES FROM EXISTING TANKS TO DISPENSER ISLANDS. 36" RIA MANHOLE 39- CD-W}10 i } <br /> 3. REMOVE ALL EXISTING FUEL DISPENSERS, C. <br /> ISLANDS BARRICADES, PRODUCT LINES, VAPOR LINES. i ASPHALT B 6" #3 R <br /> FENCE WORK AREA WITH TEMPORARY CHAkNL1NK CONSTRUCTION FENCING. POST"KEEP OUT" 8" ' 8" SLOPE CONC. DOWN 1 1/2" i 1'--0 DRIVE SLAB W / #3 REBAR <br /> ASPHALT AND CONCRETE SURFACES AS REQUIRED, ANY SALVAGEABLE EQUIPMENT TO BE 2' MIN <br /> SIGNS. REMOVED FROM SITE AS DIRECTED BY RYDER REPRESENTATIVE- FROM MANHOLES, TYP. MIN AT 24" O.C. EA. WAY <br /> 2. DEMOLISH SITE AND UNCOVER UST'S AND REMOVE ALL RELATED WIPING (SEE DEMOLITION NOTES). I i-1 2" A <br /> I 4. CONTRACTOR SHALL PROVIDE FOR CLEANING, AS NECESSARY, TRANSPORTATION, DISPOSAL OF <br /> 3. CONTRACTOR SHALL COVER EXCAVATED SOIL WITH 4 MIL. BLASTIC UNTIL 50iL IS REMOVED. SOIL PIPING, AND RINSEATE IN ACCORDANCE WITH COUNTY REGULATIONS AND PER RYDER APPROVAL, � � - I - -- <br /> STOCKPILED ON SITE FOR SAMPLING PRIOR TO HAUL-OFF AS DIRECTED BY RYDER. SHALL COVER EXCAVATED SOIL WITH 4 MIL. PLASTIC UNTIL SOIL IS REMOVED. SOIL f — <br /> TO BE 5, CONTRACTOR <br /> ERS AND TANK SUMPS. INSTALL UNDER DISPENSERr OFF-HAUL AS DIRECTED BY R°�DER. �t � MORRISQN BROS FIBERGLASS PUMP i ,� MORRISON EROS. <br /> DUCT PIPING DISPENSERS, SITE FOR SAMPLING PRIOR TO OF ! <br /> 4. REMOVE EXISTING PRO TO I3E: STOCKPILED ON ON AINMEN SOLUTIONS <br /> CONTAINMENT, NEW WESTERN FIBERGLASS TANK SUMPS AND DOUBLE WALLED FIBERGLASS i Cp _j CAP & RING KIT } CAP & RING KIT 1 <br /> ED VENT LINE AND DOUBLE WALLED BULK 0!L LINE AND WASTE � 0 305 X PA--1200 AEC SUMP & LID I ENVIRON � 305 X PA-1200 AK I <br /> PRODUCT LINE, AND DOUBLE WALL f <br /> OIL PIPING PER SITE PLAN, STANDARD TANK DRAWINGS, AS PER SCHEDULE BELOW: OWNER/SITE ADDRESS: CONTRACTOR, j` � � TANK GAUGE CONTAINMENT SOLUTIONS ENTRY I 3l4" CONDUIT 1f� <br /> 3100 <br /> c 4' BILK STEEL ENVIRON FIBERGLASS FILL I # i VEEDER ROOT MODEL#794380-302 <br /> 5. DIESEL PRIMARY &WASTE: 2" RED THREAD IIA AND RED THREAD 11 FITTINGS, DS RYDER TRUCK RENTAL LC-1070 30NSALL PETROLEUM CONSTRUCTION; INC. I SCH 40 RISER ENTRY SUMP I <br /> 6. OIL PIPNG 8000 SERIES ADHESIVE. PO BOX 960 BONSAL; , CA 92003-0969 � 31QI0 HYDROSTATIC SEN50R VIII <br /> DIESEL &WASTE OIL 3" RED THREAD EIA AND RED THREAD II 3633 DUCK GREEK DRIVE �- v <br /> SECONDARY CONTAINMENT FITTINGS. DS 80fl0 SERIES ADHESIVE STOCKTON, CA 95202 760 631 0342 OFFICE 760 631 0526 FAX 4 I <br /> CONTRACTOR'S LICENSE NO. 682742 <br /> FILLER. � <br /> PIPING: <br /> WITH I <br /> BULK OIL PRIMARY PIPING: DAYCO 1" MPM 1000 SERIES HYDRAULIC HOSE. TRAOPW 4O4x3 I <br /> BULK OIL SECONDARY 3" RED THREAD IIA AND RED THREAD 11 EXTRACTOR TEE 1� <br /> CONTAINMENT PIPING: FITTINGS, DS 8000 SERIES ADHESIVE. VEEDER ROOT MODEL#208 ll <br /> ST BE CERTIFIED AS HAVING BEEN TRAINED BY SMITH MATERIAL LIST L1Qu10 sENso�=. \ <br /> NOTE: PERSONS INSTALLING PIPING MU VEEDER. ROOT MODEL#208 i <br /> FIBERGLASS. STEEL PIPING: ALL PIPING OTHER THAN FIBERGLASS TO 13E BLACK IRON (GALVANIZED <br /> FURNISHED INSTALL <br /> 0PW BALL FLOAT I <br /> PIPE IS NOT ALLOWED), PIPE THREAD COMPOUND IS TO BE RECTOR SEAL NO. 7 OR JOMAR "THE QT, DESCRIPTION BY BY L(t".tU1D SENSOR s3 SERIESPEA <br /> P � MIL. FVC � QPW 61SQ-410--C — I� BACKFILL HEAVY WEIGHT," ALL STEEL PIPE BELOW GRADE IS TO BE DOUBLE WRAPPED WITH .0 M, <br /> .................... ................................................................................................................................................................................................................................................. ..................................... ............................... TANK LEVEL MONITOR <br /> � OVERFILL PRIMVENTQPN I <br /> TAPE- 2 RED JACKET 1 112 HP TURBfNE EXISTING BPC I <br /> E TESTED: .............................................................................................................................:.......................................................................................................... ..................................... ............................... I VALVE <br /> 7. PIPING SYSTEMS SHALL B 2 GASBOY MODEL NO, 9850XTW-1 MASTER DIESEL DISPENSER RYDER BPC I VEEDER ROOT MAG-1 F'EO�E I g" `g" <br /> v SOLUTION PRIMARY OIL HOSE). .......... .............................................................................................................-.................1--.........................I...,...................,,...........................................,............. ..............,.......•.............. .......,.....,P.....,...,... 3° VENT FLEX <br /> A. 1 - 180 PSI AND APPLY SOAP SOLUT O ( ) 4 GASBOY MODEL NO. 216ASS DIGITAL SATELLITE DIESEL DISPENSER NYDER BPC <br /> FLEX HOSE <br /> . . � <br /> I AND APPLY SOAP SOLUTION. .................... ................................................................................................................................................................................................................................................. ..................................... ............................... <br /> B. 2 80 PS RYDER BPC <br /> „ $ OVERHEAD HOSE RETRACTOR MODEL NO. 032667 HOSEMASTER <br /> C. 3 - 80 PSI AND APPLY SOAP SOLUTION. ..............................................................................................................:.. ..........RYD.E.R........ ...........SPC......... <br /> 4 MAIN SUPPORT POST MODEL N0. 032675 ESMM-3-18 - <br /> „ SECONDARY- 5 PSI AND APPLY SOAP SOLUTION. ......................................................................................_.................,...........-....,..........,.......................................,....:....,..,.,,..................,.......... ..........,..............,.......,... ............................... 3 X 18" DROP TUBE <br /> D. 3 <br /> BPC -----� <br /> NOTE- MARK PRESSURE ON GAUGE AT BEGINNING OF TEST. PRESSURE (AS INDICATED ON 4 SUPPORT POST FDR SATELLITE MODEL NO. 032878 RYDER DEFLECTOR PLATE <br /> FOR ONE 1 HOUR AND BE WITNESSED BY CUPA REPRESENTATIVE. $ BREAKAWAY CONNECTOR MODEL N0, 044038 RYDER EPC TYP. UNDER ALL 1 } <br /> LL HOLD _ _ <br /> ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,, ,, , ,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,„,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,„,,,,,,,,,,,,,,,,,,,,,,,,,,,,, TAN N <br /> GAUGE) SHA ( ) I< BUNGS <br /> CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYNAMIC BACK PRESSURE TEST OF ALL <br /> 8 CO 8 WHIP HOSE MODEL NO. 030421 MIN <br /> RYDE m <br /> VENT LINES AS REQUIRED BY RYDER. 8 HIGH FLOW SWIVEL MODEL NO. 064554 RYDER BPC I - <br /> .............................................................................................-........,........,...........................,...............,....,.............................................................. ........................,..,......... ...................,........... I # - <br /> . I <br /> CONTRACTOR SHALL DO ANY OTHER TESTING AS REQUIRED BY LOCAL REGULATIONS. "”"" RYDER BPG <br /> $ HIGH FLOW DIESEL NOZZLE MODEL N0. 038531 - - <br /> HALL 13E MAINTAINED UNTIL AFTER THE .................... ................................................................................................................................................................................................................................................. - <br /> 9. PRESSURE (5 LBS.) ON THE PIPING SECONDARY SPACES 2 WESTERN FIBERGLASS 1123-D2 DOUBLE SIDED DISPENSER $UMP DIESEL BPC BPC # o <br /> CONCRETE TANK SLABS HAVE BEEN POURED AND SHALL BE WITNESSED BY RYDER FIBERGLASS 1320-D2 SINGLE SIDED DISPENSER SUMP {SATELLITE........................... .... ... BPC ff T <br /> 4 WESTERN BP., S _ <br /> .................... ........:.::........ -------- ..................................................,..........,.................,,.......,...........,.................... - <br /> REPRESENTATIVE. .. ..... - <br /> 10 OPW DOUBLE POPPETTED SHEAR VALVE MODEL N0. 10I3HMP 13P[� BPC LOPE: TANK DOWN 1 ---1:2'" TO 2" TOWARDS ILL <br /> .................................................................................................................................................................................... ..................................... ............................... <br /> NEW FUEL ISLANDS AS SHOWN ON DRAWINGS. <br /> 10. CONSTRUCT � ,� j <br /> T 10 5' M X 2 FM X 18 FLEXIBLE PIPE CONNECTORS FOR DISPENSERS MODEL 60-1047..... BBC BPC I - <br /> E WATER TESTS S AS ...................... ............................... <br /> R BOXES TURBINE SUMPS, AND OVERFILL BOXES ARE TO ................................ <br /> DISPENSE _ - _ <br /> 2 2" M X 2" FMX 18" FLEXIBLE PIPE CONNECTORS FOR TURBINES MODEL NO. 60-10478-0180 BPC BPC <br /> _ - - _ � <br /> FOLLOWS. :................. ..,...,.................;..,.LAND FORM BPC BPC <br /> PEA � <br /> J <br /> PENETRATION. 4 4' X 4'X ,3 STEELS _ - I I <br /> WATER TO HIGHEEST PEN <br /> 1. FILL WITH ........... ..........................},,...,...........................................................,.........,.............,...,,...,,..................................,...............,................,.....................,...............,....... ..................................... E <br /> MONITOR LEVEL FOR 24 HOURS. 2 4' X 6 X 13 STEEL ISLAND FORM BPC BPC E E__..... -- <br /> 2. MARK WATER LEVEL AND MON E �- I; _ I �- <br /> ALL CONDUIT IS TO BE 314" (MINIMUM) CONDUIT. ALL SMITH FIBERGLASS PRIMARY, SECONDARY, VENT PIPES & FITTINGS <br /> BPC BPC -�� <br /> 12. .......... ............................................................................................................................................................... <br /> IN EACH TANK ANNULAR SPACE AND SUMPS. ALL BLACK IRON PIPING, NIPPLES AND FITTINGS SPC SPC TOTE: <br /> STALLMONITORING SYSTEM WITH LIQUID SENSORS A........... ..........................._...............................................,..................,.........................................,.......................................................,...................,.......................,.... .........................,........... .....,...........,............. <br /> 13. N T TLS350 MONITORING CONTROL PANEL. SUMP SENSORS: . . BPC.............. ..........BPc„,,...... TYP�11�.TANK ELEVATION/SECTION F`:BERGLASS DOUBLE WALL. UNDERGROUND STORAGE TANKS. <br /> CONNECT TO EXISTING VEEDER R04 21 1 ENVIROIN PENETRATION ...TTINGS FOR CONDUITS <br /> .................... ...li..................,.........................,.................,............,......,.........,....,......,..................., BPG BPC f/z” :SITE PLOT UNDERGROUND PIPING PLAN FOR SIZES & LOCATION. <br /> WHEN ACTIVATED, WILL ACTIVATE THE VEEDER ROOT TLS350 AND CAUSE AN AUDIBLE ALARM AND 14 3 ENVIRON PENETRATION FITTINGS FOR PRODUCT PIPING <br /> VEEDER ROOT SYSTEM WILL BE ..,. . ...........................................................................................,..............................-1-......................,.............,....,.................................,................................. ..............,.....,....,........... .............,............. <br /> .... <br /> POSITIVE SHUT DOWN OF THE TURBINE PUMP SYSTEM. THE E BPC BPC <br /> 1f f{ <br /> V -4 <br /> , _ 4 4 X 3 X 3 OPW EXTRACTOR VALVE OPW 233 . ..................................... ........ .................. <br /> -11 <br /> PROGRAMMED FOR "FAIL-SAFE". 4 PHIL TITE 36' MANHOLE WITH 1 SPILL COLLECTOR PHILSC-3600-WSC BPC BPC <br /> SITE PLAN. ............ -............,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,;,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, „,,,,,,,,,,,,,,,,,,,,,,,,,,,,, <br /> 14. INSTALL NEW CONCRETE TANK MAT AND OTHER CONCRETE AS INDICATED DNS 2 PHIL TITE SWIVEL FILL ADAPTER PHIL-SWI”-100-IT,.,...,. BPC BPC <br /> TO ........... ................................................................................................... . .... . .........,.................................................................,............................. ..................................... .....................,.,....... - <br /> CONCRETE TO BE INSTALLED ACCORDING TO RYDER CONCRETE SPECIFICATIONS. DRIVE SLAB 4 MORRISOINI FILL CA_P MB305C-0100AC BPC <br /> BE 8" THICK W/#4 RIFBAR 18" E.W. TANK SLAB TO BE 9 I HICK. 6..................'. .,...PW 4" x 115 DROP TUBE 6150-410C (OVERFILL FLAPPER VALVE) BPC BPC *Am S1 <br /> 15. INSTALL NEW GASBOY DISPENSERS AS INDICATED ON SITE PLAN AND DESCRIBED IN THE MATERIAL <br /> 4 O <br /> Q�' <br /> LIST. 4........ POMECO 36. COMPOSITE ROUND MANHOLES MODEL..N,0.:,g9..GD-W7..1.0.....:..................................................... .............BPc............. ..........BPc...,...... V SIDE OF DISPENSER <br /> SUMP WITH LIQUID SENSOR ,. 4 1'Of1PlEC0 11.. RD�JIV MANHOLE.MC3D L NO. ,0 18w... .. PC ENSE <br /> 16. INSTALL NEW UNDERGROUND BULK OIL SUPPLY LINE AND TRANSITION �..................... ......... . .. . _............ ........_..................... QISP <br /> DISPENSER <br /> ISLAND AS INDICATED ON SITE PLAN AND DESCRIBED i4 VEEDER-ROOT LIQUID SUMP SENSORS MODEL#208 <br /> FROM THE ABOVE GROUND TANK TO SERVICE ....................................................................................................................................... ............. ... ............. .......... ................. <br /> ........ 1lEDER-R'OOT RI=MOTE OVERFILL ALARM (MODEL# 79091-001 BPC ��PC JUNCTION 8Dx <br /> IN THE MATERIAL LIST. ....................................................................... .................................... .............nom,......... <br /> 1 VEEDER- ROOT OVERFILL ALARM ACICNOVIILI=DGEMENT €.1N1... (MOCSEL..79flC398-G0i) EXISTING ' <br /> 0.:.................. .. <br /> I ...................................................N. I ..................,...,,..,,........,.,_................_.... ................................... <br /> ErD''ER FOOT INTERSTITIAL SENSOR MODEL#794380-290) :QC <br /> ............................:...................................................................................................._".................:.....................................................................,,................ <br /> .. <br /> 4 VEEDER-ROOT LIQUID LEVEL PROBE UNDERGROUND STORAGE TALK) EXISTING BF'C........,, <br /> .................. .........:...•.........................................................................,...............,...,.....,.........................................,................................................,............................,...... .............,....................... ..,......... TOP <br /> 1-1/2" IMPACT V/�L.1JE W UNI(}u <br /> (SH S€Cr ON MUST FLUSH � <br /> W/ TOP OF PUW MLAND) SEAL W - <br /> ` SPLASH GUARD <br /> POMECO COMPOSITE CASO INE RESISTANT SEALANT <br /> SEA}--0� 36" DIA k�,�NHOLE 39--CD—WT10 AROUND BASE OF DISPENSER B" RVSED FULL PADWS DISPENSER tSIAI4O <br /> 32" I.D. 5E$ DETAIL <br /> (N.s.) CONTAINMENT SOLUTIONS ♦ A 1 a a p s <br /> SUMP REDUCER WTE 98000245 Tt7F' OF CUNCFi€TI= dRiuE SLAB a <br /> • ..n, .o•• �. 3" VENT e o n a <br /> CONTAINMENT SOLUTIONS �. — - e — -�� LINE <br /> Y <br /> .�°, - ..�, • FIBERGLASS SUMP LID <br /> ENVIRON ENTRY 3 PEA GRAVEL Mill <br /> FEBCOMPRESS*- -'Fa � '.� <br /> . �•.�•• 2` PRIMARY (P 1-1/2'x3" NfPPLE <br /> NM <br /> •`a• <br /> TANK GAUGE { 1-1/2` COUPLIt4G 3/4"C, DISPENSER POWER <br /> • - - 3' SECONOM?Y ENVIRON ENTRY <br /> At�IU COMI;4iJNICATIpfi�1 TO BLDG. <br /> 3/4- CONDUIT 0 CONDurr 140MMN PER D6PENSE <br /> � - .rs 2". UNION ` � CONTAINMENT. Elf' FI=B-8300 E , <br /> SCR'D BLACK STEEL _ <br /> M A <br /> TO 'HOLD SUMP SENSOR ATTA f2VC PIPE QPEN AT.- ©ED ENVIRON ENTRY A -- - - - � y' 3/4,"C. <br /> COM €JNtEEDER R SMO :RING <br /> FEB -7400 <br /> TO TURBINE RISER IAS UNISTRUT -- - - - _ - - ENVIRON ENTRY <br /> / 4" VENT �� ---- <br /> ONE CONDUIT PER DESPENS'I;�2) <br /> - 42" SUMP CONTAIN MEIv T �- ' SECONDARY 3" VENT / 1! FEB-3100 <br /> SOLUTION'S FIBERGLASS ! /-LINE If <br /> WTE 98000226 �/ PIPING FROM WESTERN FIBERGLASS <br /> ENVIRON ENTRY FASTER DISF. - „ UNDER DISPENSER CONTAINMENT <br /> FEB---6300 3/ 4 CONDUIT lI .3 x2 TEST f?C=:R <br /> MOD # 13zo---D2 <br /> . T�0 TURBINE IJ <br /> !f 2" BELL x MALE � SENSOR. <br /> tQUNT�3f�fIVG <br /> PRODUCT PIPING _ ..�..-..... fl ti7RItARY F'tPlt�Gj FILE NAME <br /> OF SEWOP NC7-SHO". <br /> VEEDER ROC MODEL#208 <br /> UNDER DISPENSER CONTAINMENT SHALL 13L� EQUIPPED 1 � <br /> ENVIRON ENTRY �� WITH �. DOSITIVr SI�ilTnnwN ELF-Clr )NIC SL`soa ,,,AT 1 fQtlln SENSOR <br /> oI } FEB-3100 ��r WILL INTERRUP POWER TO THE TURBINE. TELEFLEX F-EX CONN. <br /> 1'10 165-24-0240 <br /> FIBERGLASS SUMP BOND KIT (Diesel SUPPLIED BY CONTAINMENT a� <br /> „ SOLUTIONS u <br /> � gE,� MALE � .� I H05EMASTER e) MARK ➢ATE REVISION BY RPV`➢, <br /> A.DAPT�ER i FEB-7400 3" X18" r . , . I I f f f <br /> i :. ��g Z munt M. Kwasnica P.E. <br /> I FSMM-3-18 Ty* � r •D mo»m 170 E. McNair Drive, Suite 300 <br /> CONTAINMENT SOLUTIONS <br /> FACTORY INSTALLED D COLLAR WESTERN FOERGLASS � � 8 <br /> _ { } p �® Tempe, Arizona 85283 <br /> VEEDER ROOT MODEL#208. � �" �lN, �� .. - t � ��I�I� <br /> LOUIE) SENSOR a <br /> 480-839-9207 <br /> ENGINEERING FAX 480-491-7464 <br /> TELEFLEX t60-1478-0180 �..• ,,.••. •,��" •e •..•. -„ r ,••••.,�•r ;r - & DESIGN, LLC <br /> 2" X 18" FLEX CONNECTOR N(}T TO $OAS. <br /> i <br /> Plan Mew <br /> RYDER TRUCK RENTAL, INC. <br /> NOTE: ONLY PRODUCT PIPING <br /> IS SHOWN IN THIS VIEW '? <br /> FOR CLARITY �;� � 'r FUEL SYSTEM UPGRADE <br /> SUMP84e�X%tion (Dk.,sel) �`ti �' STANDARD <br /> u DETAILS <br /> NOT TO SCALE: .. �c :OCA.MN <br /> PMS DOCUMENT AND THE INFORMA710N HEREIN RELATING TO K <br /> ENG:NEE.RING AND DESIGN AND ITS CLIENT HAS BEEN FURNISHED IN <br /> CONFDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL„ NO DWS <br /> PAR'; HEREOF SHALL BE COPIED, DUPLICATED, DISCLOSED OR MADE SCALE SHEET OF <br /> AVAILABLE TO OTHERS, OR USED TO ANY EXTENT WHATSOEVER 1 <br /> EXCEPT AS cXPRESSL' AUTHORIZED IN WRIT}NG BY K ENGINEERING DATE 11�f20/v3 SDI 1 �}I <br /> AND DL:SIGN AND ITS CLIENT, ANY PERSON, FIRM OR CORPORATON <br /> RECIEV:`,IG THIS DOCUMENT, HOWEVER OBTAINED, SHALL BY VIRTUE IWN, BY Z.K. JOB NO, <br /> r REO:" BE `HEYED TO HAVE AGREED 70 `H FORGOING INSTRUCTIONS. <br /> K�, 3Y 03 001 02 <br />