PLUG UNUSE=D BUNG
<br /> 4" RISER ASSEMBLY I
<br /> FOR TANK GUAGE
<br /> INC. NOTE: j SUB PUMP SEE L7 } FILL SPILL CONTAINMENT
<br /> RYDER®E TRUCK ■ �� ®TES:
<br /> I I MANHOLE PHIL SC-3600 WCS
<br /> DEMOLITION
<br /> CONC. SMALL EXTEND A MINfMUM
<br /> DRIVE, ST®CKTON C�1 OF 2'—a" BEYOND THE ENDS AND i 4" RESER GAP ' !`
<br /> 3633 DUCK CREEK ® ti SIDES OF THE TANKS (SEE SITE I RESERVOIR MONITOR
<br /> 1. SAWCUT, BREAK AND REMOVE CONCRETE TANK;OVER. EXCAVATE AREA NEEDED TO REMOVE ALL PLAN FOR ACTUAL TAN SLAB SIZE). i I { )
<br /> EXISTING UNDERGROUND FUEL PIPING. BRINE FILLED
<br /> ? POMECO COMPOSITE I
<br /> TCOPE OF WORK 2. CUT AND REMOVE PRODUCT LINES FROM EXISTING TANKS TO DISPENSER ISLANDS. 36" RIA MANHOLE 39- CD-W}10 i }
<br /> 3. REMOVE ALL EXISTING FUEL DISPENSERS, C.
<br /> ISLANDS BARRICADES, PRODUCT LINES, VAPOR LINES. i ASPHALT B 6" #3 R
<br /> FENCE WORK AREA WITH TEMPORARY CHAkNL1NK CONSTRUCTION FENCING. POST"KEEP OUT" 8" ' 8" SLOPE CONC. DOWN 1 1/2" i 1'--0 DRIVE SLAB W / #3 REBAR
<br /> ASPHALT AND CONCRETE SURFACES AS REQUIRED, ANY SALVAGEABLE EQUIPMENT TO BE 2' MIN
<br /> SIGNS. REMOVED FROM SITE AS DIRECTED BY RYDER REPRESENTATIVE- FROM MANHOLES, TYP. MIN AT 24" O.C. EA. WAY
<br /> 2. DEMOLISH SITE AND UNCOVER UST'S AND REMOVE ALL RELATED WIPING (SEE DEMOLITION NOTES). I i-1 2" A
<br /> I 4. CONTRACTOR SHALL PROVIDE FOR CLEANING, AS NECESSARY, TRANSPORTATION, DISPOSAL OF
<br /> 3. CONTRACTOR SHALL COVER EXCAVATED SOIL WITH 4 MIL. BLASTIC UNTIL 50iL IS REMOVED. SOIL PIPING, AND RINSEATE IN ACCORDANCE WITH COUNTY REGULATIONS AND PER RYDER APPROVAL, � � - I - --
<br /> STOCKPILED ON SITE FOR SAMPLING PRIOR TO HAUL-OFF AS DIRECTED BY RYDER. SHALL COVER EXCAVATED SOIL WITH 4 MIL. PLASTIC UNTIL SOIL IS REMOVED. SOIL f —
<br /> TO BE 5, CONTRACTOR
<br /> ERS AND TANK SUMPS. INSTALL UNDER DISPENSERr OFF-HAUL AS DIRECTED BY R°�DER. �t � MORRISQN BROS FIBERGLASS PUMP i ,� MORRISON EROS.
<br /> DUCT PIPING DISPENSERS, SITE FOR SAMPLING PRIOR TO OF !
<br /> 4. REMOVE EXISTING PRO TO I3E: STOCKPILED ON ON AINMEN SOLUTIONS
<br /> CONTAINMENT, NEW WESTERN FIBERGLASS TANK SUMPS AND DOUBLE WALLED FIBERGLASS i Cp _j CAP & RING KIT } CAP & RING KIT 1
<br /> ED VENT LINE AND DOUBLE WALLED BULK 0!L LINE AND WASTE � 0 305 X PA--1200 AEC SUMP & LID I ENVIRON � 305 X PA-1200 AK I
<br /> PRODUCT LINE, AND DOUBLE WALL f
<br /> OIL PIPING PER SITE PLAN, STANDARD TANK DRAWINGS, AS PER SCHEDULE BELOW: OWNER/SITE ADDRESS: CONTRACTOR, j` � � TANK GAUGE CONTAINMENT SOLUTIONS ENTRY I 3l4" CONDUIT 1f�
<br /> 3100
<br /> c 4' BILK STEEL ENVIRON FIBERGLASS FILL I # i VEEDER ROOT MODEL#794380-302
<br /> 5. DIESEL PRIMARY &WASTE: 2" RED THREAD IIA AND RED THREAD 11 FITTINGS, DS RYDER TRUCK RENTAL LC-1070 30NSALL PETROLEUM CONSTRUCTION; INC. I SCH 40 RISER ENTRY SUMP I
<br /> 6. OIL PIPNG 8000 SERIES ADHESIVE. PO BOX 960 BONSAL; , CA 92003-0969 � 31QI0 HYDROSTATIC SEN50R VIII
<br /> DIESEL &WASTE OIL 3" RED THREAD EIA AND RED THREAD II 3633 DUCK GREEK DRIVE �- v
<br /> SECONDARY CONTAINMENT FITTINGS. DS 80fl0 SERIES ADHESIVE STOCKTON, CA 95202 760 631 0342 OFFICE 760 631 0526 FAX 4 I
<br /> CONTRACTOR'S LICENSE NO. 682742
<br /> FILLER. �
<br /> PIPING:
<br /> WITH I
<br /> BULK OIL PRIMARY PIPING: DAYCO 1" MPM 1000 SERIES HYDRAULIC HOSE. TRAOPW 4O4x3 I
<br /> BULK OIL SECONDARY 3" RED THREAD IIA AND RED THREAD 11 EXTRACTOR TEE 1�
<br /> CONTAINMENT PIPING: FITTINGS, DS 8000 SERIES ADHESIVE. VEEDER ROOT MODEL#208 ll
<br /> ST BE CERTIFIED AS HAVING BEEN TRAINED BY SMITH MATERIAL LIST L1Qu10 sENso�=. \
<br /> NOTE: PERSONS INSTALLING PIPING MU VEEDER. ROOT MODEL#208 i
<br /> FIBERGLASS. STEEL PIPING: ALL PIPING OTHER THAN FIBERGLASS TO 13E BLACK IRON (GALVANIZED
<br /> FURNISHED INSTALL
<br /> 0PW BALL FLOAT I
<br /> PIPE IS NOT ALLOWED), PIPE THREAD COMPOUND IS TO BE RECTOR SEAL NO. 7 OR JOMAR "THE QT, DESCRIPTION BY BY L(t".tU1D SENSOR s3 SERIESPEA
<br /> P � MIL. FVC � QPW 61SQ-410--C — I� BACKFILL HEAVY WEIGHT," ALL STEEL PIPE BELOW GRADE IS TO BE DOUBLE WRAPPED WITH .0 M,
<br /> .................... ................................................................................................................................................................................................................................................. ..................................... ............................... TANK LEVEL MONITOR
<br /> � OVERFILL PRIMVENTQPN I
<br /> TAPE- 2 RED JACKET 1 112 HP TURBfNE EXISTING BPC I
<br /> E TESTED: .............................................................................................................................:.......................................................................................................... ..................................... ............................... I VALVE
<br /> 7. PIPING SYSTEMS SHALL B 2 GASBOY MODEL NO, 9850XTW-1 MASTER DIESEL DISPENSER RYDER BPC I VEEDER ROOT MAG-1 F'EO�E I g" `g"
<br /> v SOLUTION PRIMARY OIL HOSE). .......... .............................................................................................................-.................1--.........................I...,...................,,...........................................,............. ..............,.......•.............. .......,.....,P.....,...,... 3° VENT FLEX
<br /> A. 1 - 180 PSI AND APPLY SOAP SOLUT O ( ) 4 GASBOY MODEL NO. 216ASS DIGITAL SATELLITE DIESEL DISPENSER NYDER BPC
<br /> FLEX HOSE
<br /> . . �
<br /> I AND APPLY SOAP SOLUTION. .................... ................................................................................................................................................................................................................................................. ..................................... ...............................
<br /> B. 2 80 PS RYDER BPC
<br /> „ $ OVERHEAD HOSE RETRACTOR MODEL NO. 032667 HOSEMASTER
<br /> C. 3 - 80 PSI AND APPLY SOAP SOLUTION. ..............................................................................................................:.. ..........RYD.E.R........ ...........SPC.........
<br /> 4 MAIN SUPPORT POST MODEL N0. 032675 ESMM-3-18 -
<br /> „ SECONDARY- 5 PSI AND APPLY SOAP SOLUTION. ......................................................................................_.................,...........-....,..........,.......................................,....:....,..,.,,..................,.......... ..........,..............,.......,... ............................... 3 X 18" DROP TUBE
<br /> D. 3
<br /> BPC -----�
<br /> NOTE- MARK PRESSURE ON GAUGE AT BEGINNING OF TEST. PRESSURE (AS INDICATED ON 4 SUPPORT POST FDR SATELLITE MODEL NO. 032878 RYDER DEFLECTOR PLATE
<br /> FOR ONE 1 HOUR AND BE WITNESSED BY CUPA REPRESENTATIVE. $ BREAKAWAY CONNECTOR MODEL N0, 044038 RYDER EPC TYP. UNDER ALL 1 }
<br /> LL HOLD _ _
<br /> ,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,, ,, , ,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,„,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,„,,,,,,,,,,,,,,,,,,,,,,,,,,,,, TAN N
<br /> GAUGE) SHA ( ) I< BUNGS
<br /> CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYNAMIC BACK PRESSURE TEST OF ALL
<br /> 8 CO 8 WHIP HOSE MODEL NO. 030421 MIN
<br /> RYDE m
<br /> VENT LINES AS REQUIRED BY RYDER. 8 HIGH FLOW SWIVEL MODEL NO. 064554 RYDER BPC I -
<br /> .............................................................................................-........,........,...........................,...............,....,.............................................................. ........................,..,......... ...................,........... I # -
<br /> . I
<br /> CONTRACTOR SHALL DO ANY OTHER TESTING AS REQUIRED BY LOCAL REGULATIONS. "”"" RYDER BPG
<br /> $ HIGH FLOW DIESEL NOZZLE MODEL N0. 038531 - -
<br /> HALL 13E MAINTAINED UNTIL AFTER THE .................... ................................................................................................................................................................................................................................................. -
<br /> 9. PRESSURE (5 LBS.) ON THE PIPING SECONDARY SPACES 2 WESTERN FIBERGLASS 1123-D2 DOUBLE SIDED DISPENSER $UMP DIESEL BPC BPC # o
<br /> CONCRETE TANK SLABS HAVE BEEN POURED AND SHALL BE WITNESSED BY RYDER FIBERGLASS 1320-D2 SINGLE SIDED DISPENSER SUMP {SATELLITE........................... .... ... BPC ff T
<br /> 4 WESTERN BP., S _
<br /> .................... ........:.::........ -------- ..................................................,..........,.................,,.......,...........,.................... -
<br /> REPRESENTATIVE. .. ..... -
<br /> 10 OPW DOUBLE POPPETTED SHEAR VALVE MODEL N0. 10I3HMP 13P[� BPC LOPE: TANK DOWN 1 ---1:2'" TO 2" TOWARDS ILL
<br /> .................................................................................................................................................................................... ..................................... ...............................
<br /> NEW FUEL ISLANDS AS SHOWN ON DRAWINGS.
<br /> 10. CONSTRUCT � ,� j
<br /> T 10 5' M X 2 FM X 18 FLEXIBLE PIPE CONNECTORS FOR DISPENSERS MODEL 60-1047..... BBC BPC I -
<br /> E WATER TESTS S AS ...................... ...............................
<br /> R BOXES TURBINE SUMPS, AND OVERFILL BOXES ARE TO ................................
<br /> DISPENSE _ - _
<br /> 2 2" M X 2" FMX 18" FLEXIBLE PIPE CONNECTORS FOR TURBINES MODEL NO. 60-10478-0180 BPC BPC
<br /> _ - - _ �
<br /> FOLLOWS. :................. ..,...,.................;..,.LAND FORM BPC BPC
<br /> PEA �
<br /> J
<br /> PENETRATION. 4 4' X 4'X ,3 STEELS _ - I I
<br /> WATER TO HIGHEEST PEN
<br /> 1. FILL WITH ........... ..........................},,...,...........................................................,.........,.............,...,,...,,..................................,...............,................,.....................,...............,....... ..................................... E
<br /> MONITOR LEVEL FOR 24 HOURS. 2 4' X 6 X 13 STEEL ISLAND FORM BPC BPC E E__..... --
<br /> 2. MARK WATER LEVEL AND MON E �- I; _ I �-
<br /> ALL CONDUIT IS TO BE 314" (MINIMUM) CONDUIT. ALL SMITH FIBERGLASS PRIMARY, SECONDARY, VENT PIPES & FITTINGS
<br /> BPC BPC -��
<br /> 12. .......... ...............................................................................................................................................................
<br /> IN EACH TANK ANNULAR SPACE AND SUMPS. ALL BLACK IRON PIPING, NIPPLES AND FITTINGS SPC SPC TOTE:
<br /> STALLMONITORING SYSTEM WITH LIQUID SENSORS A........... ..........................._...............................................,..................,.........................................,.......................................................,...................,.......................,.... .........................,........... .....,...........,.............
<br /> 13. N T TLS350 MONITORING CONTROL PANEL. SUMP SENSORS: . . BPC.............. ..........BPc„,,...... TYP�11�.TANK ELEVATION/SECTION F`:BERGLASS DOUBLE WALL. UNDERGROUND STORAGE TANKS.
<br /> CONNECT TO EXISTING VEEDER R04 21 1 ENVIROIN PENETRATION ...TTINGS FOR CONDUITS
<br /> .................... ...li..................,.........................,.................,............,......,.........,....,......,..................., BPG BPC f/z” :SITE PLOT UNDERGROUND PIPING PLAN FOR SIZES & LOCATION.
<br /> WHEN ACTIVATED, WILL ACTIVATE THE VEEDER ROOT TLS350 AND CAUSE AN AUDIBLE ALARM AND 14 3 ENVIRON PENETRATION FITTINGS FOR PRODUCT PIPING
<br /> VEEDER ROOT SYSTEM WILL BE ..,. . ...........................................................................................,..............................-1-......................,.............,....,.................................,................................. ..............,.....,....,........... .............,.............
<br /> ....
<br /> POSITIVE SHUT DOWN OF THE TURBINE PUMP SYSTEM. THE E BPC BPC
<br /> 1f f{
<br /> V -4
<br /> , _ 4 4 X 3 X 3 OPW EXTRACTOR VALVE OPW 233 . ..................................... ........ ..................
<br /> -11
<br /> PROGRAMMED FOR "FAIL-SAFE". 4 PHIL TITE 36' MANHOLE WITH 1 SPILL COLLECTOR PHILSC-3600-WSC BPC BPC
<br /> SITE PLAN. ............ -............,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,;,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, „,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
<br /> 14. INSTALL NEW CONCRETE TANK MAT AND OTHER CONCRETE AS INDICATED DNS 2 PHIL TITE SWIVEL FILL ADAPTER PHIL-SWI”-100-IT,.,...,. BPC BPC
<br /> TO ........... ................................................................................................... . .... . .........,.................................................................,............................. ..................................... .....................,.,....... -
<br /> CONCRETE TO BE INSTALLED ACCORDING TO RYDER CONCRETE SPECIFICATIONS. DRIVE SLAB 4 MORRISOINI FILL CA_P MB305C-0100AC BPC
<br /> BE 8" THICK W/#4 RIFBAR 18" E.W. TANK SLAB TO BE 9 I HICK. 6..................'. .,...PW 4" x 115 DROP TUBE 6150-410C (OVERFILL FLAPPER VALVE) BPC BPC *Am S1
<br /> 15. INSTALL NEW GASBOY DISPENSERS AS INDICATED ON SITE PLAN AND DESCRIBED IN THE MATERIAL
<br /> 4 O
<br /> Q�'
<br /> LIST. 4........ POMECO 36. COMPOSITE ROUND MANHOLES MODEL..N,0.:,g9..GD-W7..1.0.....:..................................................... .............BPc............. ..........BPc...,...... V SIDE OF DISPENSER
<br /> SUMP WITH LIQUID SENSOR ,. 4 1'Of1PlEC0 11.. RD�JIV MANHOLE.MC3D L NO. ,0 18w... .. PC ENSE
<br /> 16. INSTALL NEW UNDERGROUND BULK OIL SUPPLY LINE AND TRANSITION �..................... ......... . .. . _............ ........_..................... QISP
<br /> DISPENSER
<br /> ISLAND AS INDICATED ON SITE PLAN AND DESCRIBED i4 VEEDER-ROOT LIQUID SUMP SENSORS MODEL#208
<br /> FROM THE ABOVE GROUND TANK TO SERVICE ....................................................................................................................................... ............. ... ............. .......... .................
<br /> ........ 1lEDER-R'OOT RI=MOTE OVERFILL ALARM (MODEL# 79091-001 BPC ��PC JUNCTION 8Dx
<br /> IN THE MATERIAL LIST. ....................................................................... .................................... .............nom,.........
<br /> 1 VEEDER- ROOT OVERFILL ALARM ACICNOVIILI=DGEMENT €.1N1... (MOCSEL..79flC398-G0i) EXISTING '
<br /> 0.:.................. ..
<br /> I ...................................................N. I ..................,...,,..,,........,.,_................_.... ...................................
<br /> ErD''ER FOOT INTERSTITIAL SENSOR MODEL#794380-290) :QC
<br /> ............................:...................................................................................................._".................:.....................................................................,,................
<br /> ..
<br /> 4 VEEDER-ROOT LIQUID LEVEL PROBE UNDERGROUND STORAGE TALK) EXISTING BF'C........,,
<br /> .................. .........:...•.........................................................................,...............,...,.....,.........................................,................................................,............................,...... .............,....................... ..,......... TOP
<br /> 1-1/2" IMPACT V/�L.1JE W UNI(}u
<br /> (SH S€Cr ON MUST FLUSH �
<br /> W/ TOP OF PUW MLAND) SEAL W -
<br /> ` SPLASH GUARD
<br /> POMECO COMPOSITE CASO INE RESISTANT SEALANT
<br /> SEA}--0� 36" DIA k�,�NHOLE 39--CD—WT10 AROUND BASE OF DISPENSER B" RVSED FULL PADWS DISPENSER tSIAI4O
<br /> 32" I.D. 5E$ DETAIL
<br /> (N.s.) CONTAINMENT SOLUTIONS ♦ A 1 a a p s
<br /> SUMP REDUCER WTE 98000245 Tt7F' OF CUNCFi€TI= dRiuE SLAB a
<br /> • ..n, .o•• �. 3" VENT e o n a
<br /> CONTAINMENT SOLUTIONS �. — - e — -�� LINE
<br /> Y
<br /> .�°, - ..�, • FIBERGLASS SUMP LID
<br /> ENVIRON ENTRY 3 PEA GRAVEL Mill
<br /> FEBCOMPRESS*- -'Fa � '.�
<br /> . �•.�•• 2` PRIMARY (P 1-1/2'x3" NfPPLE
<br /> NM
<br /> •`a•
<br /> TANK GAUGE { 1-1/2` COUPLIt4G 3/4"C, DISPENSER POWER
<br /> • - - 3' SECONOM?Y ENVIRON ENTRY
<br /> At�IU COMI;4iJNICATIpfi�1 TO BLDG.
<br /> 3/4- CONDUIT 0 CONDurr 140MMN PER D6PENSE
<br /> � - .rs 2". UNION ` � CONTAINMENT. Elf' FI=B-8300 E ,
<br /> SCR'D BLACK STEEL _
<br /> M A
<br /> TO 'HOLD SUMP SENSOR ATTA f2VC PIPE QPEN AT.- ©ED ENVIRON ENTRY A -- - - - � y' 3/4,"C.
<br /> COM €JNtEEDER R SMO :RING
<br /> FEB -7400
<br /> TO TURBINE RISER IAS UNISTRUT -- - - - _ - - ENVIRON ENTRY
<br /> / 4" VENT �� ----
<br /> ONE CONDUIT PER DESPENS'I;�2)
<br /> - 42" SUMP CONTAIN MEIv T �- ' SECONDARY 3" VENT / 1! FEB-3100
<br /> SOLUTION'S FIBERGLASS ! /-LINE If
<br /> WTE 98000226 �/ PIPING FROM WESTERN FIBERGLASS
<br /> ENVIRON ENTRY FASTER DISF. - „ UNDER DISPENSER CONTAINMENT
<br /> FEB---6300 3/ 4 CONDUIT lI .3 x2 TEST f?C=:R
<br /> MOD # 13zo---D2
<br /> . T�0 TURBINE IJ
<br /> !f 2" BELL x MALE � SENSOR.
<br /> tQUNT�3f�fIVG
<br /> PRODUCT PIPING _ ..�..-..... fl ti7RItARY F'tPlt�Gj FILE NAME
<br /> OF SEWOP NC7-SHO".
<br /> VEEDER ROC MODEL#208
<br /> UNDER DISPENSER CONTAINMENT SHALL 13L� EQUIPPED 1 �
<br /> ENVIRON ENTRY �� WITH �. DOSITIVr SI�ilTnnwN ELF-Clr )NIC SL`soa ,,,AT 1 fQtlln SENSOR
<br /> oI } FEB-3100 ��r WILL INTERRUP POWER TO THE TURBINE. TELEFLEX F-EX CONN.
<br /> 1'10 165-24-0240
<br /> FIBERGLASS SUMP BOND KIT (Diesel SUPPLIED BY CONTAINMENT a�
<br /> „ SOLUTIONS u
<br /> � gE,� MALE � .� I H05EMASTER e) MARK ➢ATE REVISION BY RPV`➢,
<br /> A.DAPT�ER i FEB-7400 3" X18" r . , . I I f f f
<br /> i :. ��g Z munt M. Kwasnica P.E.
<br /> I FSMM-3-18 Ty* � r •D mo»m 170 E. McNair Drive, Suite 300
<br /> CONTAINMENT SOLUTIONS
<br /> FACTORY INSTALLED D COLLAR WESTERN FOERGLASS � � 8
<br /> _ { } p �® Tempe, Arizona 85283
<br /> VEEDER ROOT MODEL#208. � �" �lN, �� .. - t � ��I�I�
<br /> LOUIE) SENSOR a
<br /> 480-839-9207
<br /> ENGINEERING FAX 480-491-7464
<br /> TELEFLEX t60-1478-0180 �..• ,,.••. •,��" •e •..•. -„ r ,••••.,�•r ;r - & DESIGN, LLC
<br /> 2" X 18" FLEX CONNECTOR N(}T TO $OAS.
<br /> i
<br /> Plan Mew
<br /> RYDER TRUCK RENTAL, INC.
<br /> NOTE: ONLY PRODUCT PIPING
<br /> IS SHOWN IN THIS VIEW '?
<br /> FOR CLARITY �;� � 'r FUEL SYSTEM UPGRADE
<br /> SUMP84e�X%tion (Dk.,sel) �`ti �' STANDARD
<br /> u DETAILS
<br /> NOT TO SCALE: .. �c :OCA.MN
<br /> PMS DOCUMENT AND THE INFORMA710N HEREIN RELATING TO K
<br /> ENG:NEE.RING AND DESIGN AND ITS CLIENT HAS BEEN FURNISHED IN
<br /> CONFDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL„ NO DWS
<br /> PAR'; HEREOF SHALL BE COPIED, DUPLICATED, DISCLOSED OR MADE SCALE SHEET OF
<br /> AVAILABLE TO OTHERS, OR USED TO ANY EXTENT WHATSOEVER 1
<br /> EXCEPT AS cXPRESSL' AUTHORIZED IN WRIT}NG BY K ENGINEERING DATE 11�f20/v3 SDI 1 �}I
<br /> AND DL:SIGN AND ITS CLIENT, ANY PERSON, FIRM OR CORPORATON
<br /> RECIEV:`,IG THIS DOCUMENT, HOWEVER OBTAINED, SHALL BY VIRTUE IWN, BY Z.K. JOB NO,
<br /> r REO:" BE `HEYED TO HAVE AGREED 70 `H FORGOING INSTRUCTIONS.
<br /> K�, 3Y 03 001 02
<br />
|