Laserfiche WebLink
• <br /> Monitoring System Certification <br /> site Address: 3633 DUCK CREEK DRIVE Date of Testing/Service: 10/31/2001 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 119.02 <br /> Complete the following checklist: <br /> x Yes No Is the audible alarm operational? <br /> Q Yes No' Is the visual alarm operational? <br /> I� Yes No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> Q Yes El No' interfere with their proper operation? <br /> Yes No' F1 NIA If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ Yes ©No' ❑N/A monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor fail ureldisconnection? ❑ Yes No <br /> For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> ❑ Yes [—]No N/A overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? %__ <br /> Yes` ©No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> © Yes' ❑No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) E]Product; <br /> ❑ Water. If yes,describe causes in Section E,below. <br /> © Yes ❑No` Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> G Yes ❑No' Is all monitoring equipment operational per manufacturers'specifications? <br /> `In Section E below,describe how and when these deficiences were or will be corrected. <br /> E. Comments: <br /> NEW OIL HAS PROBUCT IN SUMP <br /> DIE RES ANNULER HAS .5 INCH WATER <br /> page 2 of 3 <br />