My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1991 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO 1991 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 3:26:05 PM
Creation date
11/4/2018 3:36:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991 - 2004
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DUCK CREEK\3633\PR0232461\COMPLIANCE INFO 1991 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 1991 - 2004
QuestysRecordDate
4/25/2018 10:10:21 PM
QuestysRecordID
3869105
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> Site Address: 3633 DUCK CREEK DRIVE Date of Testing/Service: 10/31/2001 <br /> F. In-Tank Gauging / SIR Equipment Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> 0 Yes ❑No•I Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes ❑No•I Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑Na' Was accuracy of system product level readings tested? <br /> ❑Yes ❑No' Was accuracy of system water level readings tested? <br /> Evas ❑No' Were all probes reinstalled properly? <br /> QYes ❑No Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> 0 Yes ❑No• ❑NfA (Check all that apply)Simulated leak rate: X❑ 3 g.p.h❑0.1 g.p.h ❑0.2 g.p.h <br /> X Yes ❑No• Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes ❑NaWas the testing apparatus properly calibrated? <br /> ❑Yes Or No' ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ElLYes JNo' ❑X NIA For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No' ®N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ON.° Q N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑No' 0 NIA For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> MYes ❑No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.