My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1991 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO 1991 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 3:26:05 PM
Creation date
11/4/2018 3:36:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991 - 2004
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DUCK CREEK\3633\PR0232461\COMPLIANCE INFO 1991 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 1991 - 2004
QuestysRecordDate
4/25/2018 10:10:21 PM
QuestysRecordID
3869105
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Instructions for Equipment Testing and Certification <br /> General Instructions <br /> 1. Equipment that monitors underground strorage tank systems containing hazardous materials must be tested/serviced <br /> annually,or on a schedule specified by the manufacturer,whichever is more frequent. <br /> 2. This certification form must be used to document the following activities: 1.)Periodic testing as described above;2.) <br /> Testing of new monitoring systems upon installation; 3.)Testing of replacement sensors,probes,or other system; <br /> and 4.)Testing of repaired sensors, probes, or other system components. <br /> 3. As noted on Page 1,a separate certification form must be completed for each individual monitoring system control panel. <br /> For example: If one control panel monitors in-tank gauging probes and another panel monitors electronic line leak detectors, <br /> two certification forms are required. <br /> 4. Except in the case of emergency repairs, many local agencies require that a permit be obtained prior to installing new <br /> monitoring systems or components(i.e. installation of new or different equipment, rather than using parts identical to those <br /> replaced). Check with your local agency for their requirements before starting work. <br /> Section B <br /> 1. In the Tank ID sections,describe which tanks you worked on(e.g. Diesel Tank, North Tank, Middle Tank). <br /> 2. For compartmental tanks, list each compartment as a separate tank. <br /> 3.Where"Model'is asked for,the name of the manufacturer and the manufacturer's specific model name or number, <br /> as referenced in the"List of Leak Detection Equipment and Methods for Underground Storage Tanks"(i.e. LG-113)must be <br /> specified. <br /> 4. Hands-on functional testing of individual leak detection components to confirm operability to manufacturer's specifications <br /> and state regulations is required.This includes verifying and mechanical or electronic automatic shut-off features(e.g. <br /> dispenser floats and chains). In the case of sensors that can not be non-destructively tested,contact you local agency <br /> that regulates UST systems to see if they will approve alternate testing methods(e.g.testing of representative samples). <br /> Section C <br /> 1.Certification must be made by a licensed and certified technician as per 23 CCR <br /> 2.All work associated with testing/servicing of equipment must be performed by or under the direct supervision of the <br /> certifying technician. <br /> Section D <br /> 1.When testing operability of positive turbine shut down,you must; 1.)Verify shut-down by simulating a leak; and 2.) <br /> Verify shut-down by disconnecting the sensor. <br /> Attachments <br /> 1.Site Plan-You must attach a drawing showing the general layout of tanks and piping. Clearly identify locations of the <br /> following equipment, if installed: monitoring system control panels;sensors monitoring tank annular spaces,sumps, <br /> dispenser pans,spill containers,and other secondary containment areas; mechanical or electronic line leak detectors; <br /> and in-tank liquid level probes(if used for leak detection). Note the date the Site Plan was prepared. <br /> 2. System Set-Up Report- If the monitoring system or diagnostic equipment used in testing is capable of generating <br /> a hard-copy report describing system set-up,you must include a copy of the report with this Certification. <br /> 3.Alarm History Report-If the monitoring system is capable of generating a hard-copy alarm history report,you must <br /> include a copy of the report with this Certification. Relevant alarms that should appear in this report include overfill, <br /> high water,and leak detection equipment related alarms.This should be printed before you test any sensors. <br /> 05100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.