Laserfiche WebLink
From: � 0112712009 17:03 #347 P.004/011 <br />S. SECONDARY PIPE TESTING <br />Page 3 <br />Test Method Developed By: <br />- Piping Manufacturer X Industry Standard <br />71 Other (Specifv) <br />= Professional Engineer i <br />Test Method Used: <br />X Pressure Vacuum <br />E- - Other (Specf}j) <br />; Hydrostatic <br />Test Equipment Used: <br />Waste Oil <br />Vent <br />Waste Oil <br />Remote Fill <br />Equipment Resolution: <br />New Oil -i -- New Oil <br />Product/Air antifreeze <br />New Oil <br />Oil/Air <br />Piping Material: - <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiber -lass <br />Fiberglass <br />Piping Manufacturer: <br />ACTS <br />AOS <br />AOS <br />AOS <br />AOS <br />Piping Diameter: <br />3" <br />3" <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />-30' <br />--30' <br />-100° <br />-150' <br />--150' <br />Product Stored: <br />Method and location of <br />i pin -run isolation; <br />Test Bell <br />Test Bell <br />Test Bell <br />Test Bell. <br />Test Bell <br />Wait tune between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />12:30 pm <br />12:30 pm <br />12:30 pm <br />12:30 pm <br />9:00 am <br />Initial Reading (Rt): <br />3 psi <br />3 psi <br />3 psi <br />3 psi <br />3 psi <br />Test End Time: <br />1:30 pm <br />1:30 pm <br />1:30 pm <br />1:30 pm <br />10:00 am <br />Final Reading (Rr): <br />Test Duration: <br />3 psi <br />1 hour <br />3 psi <br />1 hour <br />3 psi <br />I hour <br />3 psi <br />1 hour <br />3 psi <br />1 hour <br />Change in Reading (RF-Rj): <br />0 <br />0 <br />00 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />a .Pass Fail <br />x Pass Fail : <br />x Pass Fail <br />x Pass 0 Fail <br />x Pass Fail <br />Comments — (include hilbrntation on repairs made prig to testing, and reconiwended follow-up for failed tests) <br />NOTE: New Oil - Product 1 Air = Piping from New Oil Tank to the buildin . <br />New Oil - Antifreeze = Pi in from Transition Sum to the building <br />New Oil - Oil 1 Air = Piping from Transition Sump to the building _ <br />Note: Repairs made to Secondary line penetrations to New Oil : Product / Air; Antifreeze ; Oil / Air <br />