My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO 2007 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:11 PM
Creation date
11/4/2018 3:46:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2010
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DUCK CREEK\3633\PR0232461\COMPLIANCE INFO 2007 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2010
QuestysRecordDate
4/25/2018 11:45:33 PM
QuestysRecordID
3869854
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: 01/2 009 17.03 #347 P.005/011 <br />SECONDARY PIPE TESTING <br />Page 4 <br />Test Method Developed By: <br />- Piping Manufacturer X Industry Standard <br />-. Other (S17ecifj•) <br />rl Professional Engineer <br />Test Method Used: <br />X Pressure -. <br />Other (Specr' ') <br />Vacuum <br />D Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Material: <br />New Oil <br />Vent <br />Fiberglass <br />Main Diesel <br />Product <br />Main Diesel <br />Vent <br />Reserve Diesel <br />Product <br />Reserve Diesel <br />Vent <br />Fiberglass Fiberglass Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />AOS <br />AOS <br />AOS <br />AOS <br />AOS <br />Piping Diameter: <br />3" <br />3" <br />31' <br />Y <br />3" <br />Length of Piping Run: <br />-30' <br />--100' <br />-30' <br />-100' <br />-25' <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />'fest Bell <br />Test Bell <br />Test Bell <br />Test Bell <br />Test Bell <br />Wait time between applying <br />pressure/vacuunt/water and <br />starting test:. <br />Test Start Time: <br />9:30 am <br />9:30 am <br />10:00 ant <br />10:00 am <br />10:00 am <br />Initial Reading (R[): <br />3 psi <br />3 psi <br />3 psi <br />3 psi <br />3 psi <br />Test End Time: <br />10:30 am <br />10:30 am <br />11:00 alit <br />11:00 am <br />11:00 am <br />Final Reading (RF): <br />3 psi <br />3 psi <br />3 psi <br />3 psi <br />3 psi <br />Test Duration: <br />1 hour <br />l hour <br />I hour <br />1 hour <br />1 hour <br />Change in Reading (RF -R,): <br />0 <br />0 <br />o <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />One hour, no loss <br />Test Result: <br />x Pass �: Failx <br />Pass El Fail <br />I x Pass 0Fail <br />x Pass 0 Fail <br />x Pass ❑ Fatj ;..". <br />Comments - (include irrjor enation on repairs made prior to testing and recommended folloit�-trp,for failed tests) <br />NOTE: Product secondary lines for main diesel and reserve diesel lines that travel from master <br />Dispensers to satellite pumps are secondarily contained and connected underground. <br />When testing the product secondary lines from the piping sumps of main diesel and <br />Reserve diesel, the product secondary lines from the master pumps to the satellite pumps <br />Are being tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.