Laserfiche WebLink
From: 01/2 009 17.03 #347 P.005/011 <br />SECONDARY PIPE TESTING <br />Page 4 <br />Test Method Developed By: <br />- Piping Manufacturer X Industry Standard <br />-. Other (S17ecifj•) <br />rl Professional Engineer <br />Test Method Used: <br />X Pressure -. <br />Other (Specr' ') <br />Vacuum <br />D Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Material: <br />New Oil <br />Vent <br />Fiberglass <br />Main Diesel <br />Product <br />Main Diesel <br />Vent <br />Reserve Diesel <br />Product <br />Reserve Diesel <br />Vent <br />Fiberglass Fiberglass Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />AOS <br />AOS <br />AOS <br />AOS <br />AOS <br />Piping Diameter: <br />3" <br />3" <br />31' <br />Y <br />3" <br />Length of Piping Run: <br />-30' <br />--100' <br />-30' <br />-100' <br />-25' <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />'fest Bell <br />Test Bell <br />Test Bell <br />Test Bell <br />Test Bell <br />Wait time between applying <br />pressure/vacuunt/water and <br />starting test:. <br />Test Start Time: <br />9:30 am <br />9:30 am <br />10:00 ant <br />10:00 am <br />10:00 am <br />Initial Reading (R[): <br />3 psi <br />3 psi <br />3 psi <br />3 psi <br />3 psi <br />Test End Time: <br />10:30 am <br />10:30 am <br />11:00 alit <br />11:00 am <br />11:00 am <br />Final Reading (RF): <br />3 psi <br />3 psi <br />3 psi <br />3 psi <br />3 psi <br />Test Duration: <br />1 hour <br />l hour <br />I hour <br />1 hour <br />1 hour <br />Change in Reading (RF -R,): <br />0 <br />0 <br />o <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />One hour, no loss <br />Test Result: <br />x Pass �: Failx <br />Pass El Fail <br />I x Pass 0Fail <br />x Pass 0 Fail <br />x Pass ❑ Fatj ;..". <br />Comments - (include irrjor enation on repairs made prior to testing and recommended folloit�-trp,for failed tests) <br />NOTE: Product secondary lines for main diesel and reserve diesel lines that travel from master <br />Dispensers to satellite pumps are secondarily contained and connected underground. <br />When testing the product secondary lines from the piping sumps of main diesel and <br />Reserve diesel, the product secondary lines from the master pumps to the satellite pumps <br />Are being tested. <br />