Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED FORWr <br /> ., <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Paile I of 2) <br /> TYPE OF ACTION ❑ 1.NE W PLAN ® 2.CHANGE OF INFORMATION <br /> PLAN TYPE ❑ ].MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. 490-1. <br /> I (Check one item only) ® 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 12 K DSL, 6 K DSL, 5 K Now 011 490-2, <br /> FACILITY ID#(Agency use only) 1• FACILITY INFORMATION <br /> BUSINESS NAME(Same as FacilityName or DBA) 1 <br /> Ryder Transportation Services#1071 3. <br /> BUSINESS SITE ADDRESS <br /> 3633 Duck Creek Dr. 103. CITY <br /> Stockton 104. <br /> I I1' EQUIPMENT TESTING'AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance and calibration of monitoring equipment(e.g.,sensors,probes,line leak detecto ,e( most <br /> beonned at the frequency specified <br /> by the ey-uiPment manufacturers msWctions or annually whichever is more fr uent.Such work must be erfortned by ualified ersonne0 z3 cCR ]632,ency x_3_$1641 <br /> ___._ ________._�____ p <br /> MONITORING EQUIPMENT IS SERVICED 9__--� -__I _ § <br /> Q 1.ANNUALLY ❑ 99.OTHER S eci �- <br /> III. MONITORING LOCATIONS p fy) 49036 <br /> ❑ I NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN 4911 36. <br /> 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [z3 cca gz63z, <br /> IV, TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ].CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT VAULT(S)he 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.E23,,,92632,26341 the!a <br /> SECONDARY CONTAINMENT IS: <br /> PANEL MANUFACTUR ❑ a.DAY ER: Veeder Root 13 b.LIQUID FILLED ❑ c.PRESSURIZED <br /> Eld.UNDER VACUUM 490-6. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 4I490.3.97.. MODEL#: TLS-350 <br /> I 490.8. <br /> AUTOMATIC T;NK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TAN�r9j MODEL#(S)_ 420 <br /> 490.1°. <br /> PANEL MANUFACTURER: �--�.[z3 ccR Sz643] 4WT11. <br /> IN-TANK PROBE MANUFACTURER: 49012. MODEL#: 490.13 <br /> LEAK TEST FREQUENCY: Ela.CONTINUOUS 49014. MODEL#(S): 490-I5. <br /> ❑ d.MONTHLY ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> _ PROGRAMMED TESTS: ❑ e.OTHER(Specify): a96n <br /> ❑ a.0.1 g.p.h. _❑ b.0.2 g.p.h. _ <br /> 0 3.MONTHLY STATISTICAL INVENTORY RECONCII.IATION Iz3 ccR§2646.q ❑ c OTHER(Specify). 49046. <br /> _-_�- _ _490.19. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)I23 CCR§264x] a90z0. <br /> ❑ 5.TANK INTEGRITY TESTING PER In CCR§2643.q TESTING PERIOD_❑ a.36 HOURS ❑ b.60 HOURS 49021. <br /> .__.______OTHER <br /> _._TEST <br /> -ANNUALLY 490-23. <br /> ❑ 99.OTHER(Specify): ..."..-"..___..__________._-__-- .b_BIENNIALLY ( p �,): <br /> - ..... ❑ c.OTHER S eci 44024. <br /> -..._____._. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING'METHOD(S) °9026. <br /> 490-27 <br /> Check elf <br /> I.CONTINUOUS MONITORING OF PIPE/I'IPING SUMPS)AND OTHER SECONDARY CONTAINMENT WITH AUDB3LE&VISUAL ALARMS. <br /> [23 CCR - that. <br /> §2636] SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED 00 26 <br /> PANEL MANUFACTURER: Veeder Root ❑ C.PRESSURIZED ❑ d.UNDER VACUUM °90-29. <br /> 49430' MODEL#: TLS-350 49031. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 4"-32 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN MODEL#(S): 208 2205 49°.33. <br /> _ FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a'YES ❑ b.NO 490-34. <br /> ® 2.MECHANICAL LA16 LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 ® a.YES ❑ b.NO 490"35. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.Iz3 ccR§2636] SPh.LEAK TESTS AND RESTRICTS OR SHUTS OFF 449636. <br /> __MELD MANUFACTURER(S): VMI 49632 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(FLED)THAT ROUTINELY PERFORMS 3.0 ----MODEL#(S): LD-2000 490-38. <br /> ELLD MANUFACTURER(S): g.p.h.LEAK TESTS.123 CCR§2636] -61so-3y' <br /> 49.3.30. MODEL#(S): <br /> PROGRAMMED IN LINE LEAK TEST: 49041. <br /> ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1g.p.h. 49642. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN, <br /> __ ELLD FAILURE/DISCONNECTfON TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043. <br /> ® 4.PIPE INTEGRITY TESTING. - --___._-_ ❑ a.YES ❑ b.NO 45e-". <br /> __TEST FREQUENCY: as0<I <br /> _® a_ANNUALLY ❑ b.EVERY 3 YEARS C] c.OTHER(Specify) 490-46. <br /> ❑ 5.VISUAL PIPE MONITORING. 490.4 <br /> FREQUENCY: ❑ a.DAILY- 490._48_ <br /> ❑ b.WEEKLY ❑ C.NUN.MONTHLY&EACH TIME SYSTEM OPERATED- 49649. <br /> ❑ 6.SUCTION PIPING MEETSEXE_MPTIONCRITERIA.I23eCR 12636(oH3)] Albwed fo__monitoring ofunburied¢mer ea ¢enereb,Poelpipmxonty pee HSC 2528L5 3 <br /> _ § �.)S.L.__ <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM, 49°-So. <br /> _______ <br /> ❑ 99.OTHER(Specify) _-__ 44o-sl. <br /> 208: Main DSL Fill Sump, Reserve DSL STP Sump, New Oil t In 8 £11 sum .39.3x2.- <br /> 205: Main DSL STP Sump, Reserve DSL fill sump P P 9 490x3. <br /> P <br /> UPCF OST-D(12/2007)-1/6 <br /> www.unidocs.org <br />