Laserfiche WebLink
I UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN— (Pa Ye 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all <br /> that u ! <br /> I [ 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS 490-s4a <br /> I _ ❑ 99.OTHER(Specify) - 49as4h. <br /> LEAK MONITOR MAN[JFACTURER: Veedef Root a9ass. <br /> LEAK SENSOR MANUFACTURER: VBBder ROOt a9asz MODEL#: a90-sc. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARM$ MODEL#(S):208 490-ss. <br /> DDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [j a.YES ❑ b.NO 490-59. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [9 a.YES ❑ It.NO 490.60. <br /> I UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. © a.YES ❑ b.NO 490.61. <br /> UDC CONSTRUCTION IS: (9 a.YES ❑ b.NO 490-62. <br /> ff DOLmLE WAr r; ® I.SINGLE WALL ❑ 2.DOUBLE WALL 4900.6]- <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID4".Ma. <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VIb. SUAL RE ALARMS. El a.YES VACUUM <br /> El b.No 49964n. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ I.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65, <br /> L AK DETECTI N ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.[23 eCR g2644.q <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490.66. <br /> 490.61. <br /> The tollnwin VIIL RE.CORD.KEEPING <br /> g monitoring/maintenance records are kept for This Cacilily: <br /> ® a.ALARM LOGS b.VISUAL INSPECTION RECORDS 490-6e. <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records ❑ c.TANK MTEGRITY TESTING RESULTS <br /> e] f ATG TESTING RESULTS(and supporting documentation records ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ® h.E UIBMENT MAINTENANCE AND CALIBRATION RECORDS ❑ g'CORROSION PROTECTION 60-DAY LOGS <br /> IX. TRAINING <br /> R Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties: <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILI 490-69a. <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(that apply) <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.69e. <br /> 490.69. <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW ago-69a. <br /> 11 STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f.STATISTICAL INVENTORY RECONCILIATION' <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br /> [I OTHER(Specify): 490-69s. <br /> 490.69h <br /> is facilityhas s"Designated UST Operator"who has passed the California UST System Operator Ezam administered by the International Code Council a9ar0. <br /> 490.69,. <br /> of The "Designated UST Operator b will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days erhire.This[mining will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> I Provide additional comments here or indica[ - COMMENTS/ <br /> pMEages NT ad;tAionDaDITIONA l information onL INFO ecific monitoring <br /> tRMATIO <br /> Drop tubes with mechanical flappers set at 95%. 24 Hr Remote monitoring via phone modem porovideo brocedures are y Ryder ttached tF erl Services. 490 71. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensunng that: l.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> _by this plan occurs•2. all conditions that indicate a possible release are invesq ated;.and 3_)all monitoring records are maintained�roperly______ <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Elmer Montero-Balch Petro 490-72. TITLE; Primary Designated Operator 49x73 <br /> NAME: Ryan ST Op -Balch Petro 499-'/4. TITLE: Secondary Designated Operator 49x95. <br /> I The Designated UST Operator shall perform a monthly visual <br /> conditions that need follow-up actioninspection of the facility,provide a report to the owner/operator,and inform the owner/opemtor of any <br /> . <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATIO :'I certify that the i form ti provi ed herein's true and accurate to the best of my knowledge. <br /> APPLICANT SIGN TUNE r. • - <br /> DATE: 490-79. <br /> REPREsarmxc:O rT � �rnro�a�i�i .�. <br /> br 3.Author¢�Re rtaentatiw of Owner 490-96. <br /> APPLICANT NAMIl <br /> PLICANT TZ X7/49 79.9. !-� <br /> UPCF UST-D(12/2011-416 \ - � -/ <br /> www.unidocs.org <br />