Laserfiche WebLink
r _ <br /> A PPPcv� <br /> UNIFIED PROGRAINI CONSOLIDATED FORDI <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Pap 2 412) <br /> VI.UNDER DISPENSER CONTAINMENT(USI MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 4sn-541 <br /> i9n.5db <br /> k L CONTINUOUS ELECTRONIC MONITORING El2.FLOAT AND CHAIN ASSEMBLY [I3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS 099.OTHER(Spee ): <br /> F F FIPANEL MANUFACTURER' _ —__---_--- 7—MO-DEL i ,56L_1 ---- 490.56. <br /> LEAK SENSOR MANUFACTURER: 11 C.(" 390.)7 MODEL#(S): 490-5e <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS OYa.YES ❑It.NO 490'59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN [I ;.YES C1 b.NO 490'60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Q-a.YES ❑b.NO 490"61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER UT's.YES ❑b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS Yl.SINGLE-WALLED ❑2.DOUBLE-WALLED 49°-65 <br /> IF DOUBLE WALLED: 490-64. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: QI_LI UID 0 2.PRESSURE E13.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE,AND VISUAL ALARMS ❑a.YES ❑b.NO i90.64b <br /> VII.PERIODIC SYSTEM TFS MNG <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49065. <br /> LEAK DETECTION MUST BE PERFORMED PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE UIRED.(23 0111_26j4.11 <br /> ❑2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49°46 <br /> ❑3.SPILL BUCKETS ARE TESTED ANNUALLY .9467 <br /> VII.RECORDKEEPING <br /> The following mon.ton ng/taga namce records are kept for this facility: <br /> ❑Alarm logs .40.61. vQ Visual Inspection Records 490.68b ❑Tank integrity testing results 490a8c <br /> ❑SIR testing results(and supporting documentation records). 490-6ed ❑ Tank gauging results(and supporting documentation records). 440-Sae <br /> CrATG Testing results(and supporting documentation records).49o4ar ❑ Corrosion Protection 60-day logs 4w4sa <br /> ❑Equipment maintenance and calibration records. 490-6en <br /> IX.TRAINING <br /> El Personnel with UST monitoring responsibilities are familiar with all ofthe following documents relevant to theirjob duties. 490491 <br /> REFE(ZE.NCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> [[j THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)494496 <br /> [OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)4494% <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49a69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-691 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"4% W <br /> ❑ SWRCB PUBLICATION:"UNDERSTAN DING AUTOMATIC TANK GAUGING SYSTEMS"4w49a <br /> ThiOTH (Specify):1,169h.M6% <br /> s facilityER has a 'Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> • The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.440-m <br /> X. COMMENTS/ADDITIONAL WFORMATION <br /> Provide additional comments here or indicate how many pages with adgitional information on specific monitoring procedur Sam attached to this plan.4W71 <br /> r�:�t-LhL.S �0v "LC rn"2 e iitzr a aaJ 1=(OLS t 2, ai_ 0_4 4501C . �' �lCLt r r6 r).Gti_. <br /> I,_`1CIlL+0ft L V, CL Ji 4n f)Iaj p jx 3-cul cies! Er FN c ,kut'ec . <br /> XLPERSONNEL RESPONSiA <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following persons)are responsible for perform.�g the r�pto oring and equipment maintenance <br /> NAME �,(Yt}t) Il�`{�{{ty (t, - I `CI1I'l"-f�0, 390.72 TITLE N;`r_�t}lGi.I L_ DE v (.'il(1.4(C� � J IZi t(--P <br /> 490-73 <br /> NAME l til � X'-t + –I- l I F, Y `. 490.74 TITLE 'i ) L 7(1 (LCT 49e-75 <br /> The Designate Operators II perform a monthly visual inspection of the facility,provide a report to thecr/operaddr,and inform thk owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNERIOPERATOR SIGNATURE <br /> F.RTIFICATION:I cent IF that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANTSI a 490.76 DATE: 490-7 <br /> Z: t (, ,/1 HCl <br /> APPLICANT A E(print)'. 490'i8 APPLICANTTITLE: 49079 <br /> YYl Li�:.�� `�5. 1iC41 �ICNIt LLkdcr,C. ��}�QJ1Q' :(_ <br /> UPCF UST-D H212007)3/4 <br />