My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
130
>
2300 - Underground Storage Tank Program
>
PR0501825
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:35 PM
Creation date
11/4/2018 3:57:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0501825
PE
2381
FACILITY_ID
FA0005234
FACILITY_NAME
GOODYEAR TIRE & RUBBER CO
STREET_NUMBER
130
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13911001
CURRENT_STATUS
02
SITE_LOCATION
130 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\130\PR0501825\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prohibit employees from working on faces of sloped or benched excavation at levels <br /> above other employees unless employees at lower levels are adequately protected from the <br /> hazards of falling,rolling, or sliding material or equipment. <br /> Prohibit employees under loads that are handled by lifting or digging equipment. To <br /> avoid being struck by any spillage or falling materials, require employees to stand away from <br /> vehicles being loaded or unloaded. If cabs of vehicles provide adequate protection from falling <br /> loads during loading and unloading operations, the operators may remain in them. <br /> 3.33 EXPOSURE MONITORING AND AIR SAMPLING PLAN <br /> An initial site reconnaissance will be performed prior to commencement of each <br /> workday. Additionally, the site will be monitored under the supervision of the Site Safety <br /> Officer during the initial phases of work operations and when conditions at the site change. <br /> Equipment may include the following: <br /> • Photo ionization detector(PID) <br /> • Chemical specific Industrial Hygiene (integrated) sampling <br /> • Heat stress <br /> All monitoring equipment will be calibrated on a per use or daily basis unless specified <br /> otherwise by the manufacturer. Maintenance, including factory maintenance, will be conducted <br /> per the manufacturer's specifications. Calibration and maintenance operations will be recorded <br /> in a log and be maintained on site with the equipment. The PID will be calibrated at the <br /> beginning of each workday. The gas used to calibrate the PID is 100 ppm Isobutylene. A bound <br /> logbook will be kept to record all field readings. A calibration will be run at the end of each day, <br /> at minimum, to insure that readings are within 25% of the initial calibration at the beginning of <br /> the day or prior calibration if the OVA is recalibrated more during the day. If the difference <br /> between calibrations is greater than 25%, the reading taken between calibrations will be suspect. <br /> 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.