My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
130
>
2300 - Underground Storage Tank Program
>
PR0501825
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:35 PM
Creation date
11/4/2018 3:57:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0501825
PE
2381
FACILITY_ID
FA0005234
FACILITY_NAME
GOODYEAR TIRE & RUBBER CO
STREET_NUMBER
130
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13911001
CURRENT_STATUS
02
SITE_LOCATION
130 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\130\PR0501825\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 SCOPE OF WORK <br /> The Scope of Work includes the following activities: <br /> • Removal of Underground Storage Tanks (USTs) — The Scope of Work to be <br /> performed by Geofon will involve the removal, cleaning, decontamination, and <br /> transportation of two 1,500-gallon heating fuel single wall steel USTs, and its <br /> associated piping. The USTs will be inerted, and manifested. Tank inerting, removal, <br /> and transport will be in accordance with American Petroleum Institute (API) 1604. <br /> The USTs and associated piping will be hauled to a state-approved disposal facility. <br /> • Soil Sampling — After removal of the USTs and piping is complete, four (4) soil <br /> samples, one from beneath each end of the tanks will be collected. If necessary, two <br /> (2) soil samples will be collected, one (1) for quality control purposes and one (1) for <br /> stockpile analysis. The soil samples will be analyzed for total petroleum <br /> hydrocarbons extractables using EPA Method 8015M, for TPH-G using EPA Method <br /> 8015M, for Volatile Organic Compounds (VOCs) and oxygenates using EPA Method <br /> 8260, for lead using EPA Method 6010 and for TTLC acid digestion using EPA <br /> Method 3040. <br /> • Site Restoration — Geofon will remove all construction debris, materials and will <br /> demobilize all equipment as soon as possible after site work has been completed. The <br /> site will be restored to pre-construction conditions including proper backfilling, <br /> compaction, grading, and other activities required to fully restore the site. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.