My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2300 - Underground Storage Tank Program
>
PR0231082
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2020 12:24:33 PM
Creation date
11/4/2018 4:00:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231082
PE
2381
FACILITY_ID
FA0003794
FACILITY_NAME
CIRCLE K STORE #5643*
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
02
SITE_LOCATION
1502 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\1502\PR0231082\COMPLIANCE INFO 1998 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 1998 - 2008
QuestysRecordDate
8/9/2017 8:52:33 PM
QuestysRecordID
72797
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be required in order to determined if any unauthorized release has occurred. <br />Sampling is required and must be completed under EHD permit. (CCR Title <br />23 section 2660 (1)(k)) <br />5. The tank and line monitoring system must be installed which is found listed in <br />LG113A and must meet the requirements of CCR Title 23 section 2666. <br />This monitoring system must also provide pump shutdown upon leak <br />detection per CCR Title 23 section 2666 (c). <br />6. If any evidence of corrosion is noted by the special inspector during the <br />inspection of the underground tank CCR Title 23 section 2660(n) which <br />refers to section 2635 (2a) (2b) will apply to a corrosion protection system. <br />7. Dispenser pans are required if any work is done to the piping and dispenser <br />systems. <br />If you have any questions regarding this matter, please contact me at (209) 468- <br />3446. <br />Karen Furst, M.D., M.P.H. <br />Health Officer <br />Doug Wilson, Supervising R.E.H.S. <br />Environmental Health Division <br />cc: Tosco Marketing Co. <br />DW/dw <br />
The URL can be used to link to this page
Your browser does not support the video tag.