My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2300 - Underground Storage Tank Program
>
PR0231082
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2020 12:24:33 PM
Creation date
11/4/2018 4:00:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231082
PE
2381
FACILITY_ID
FA0003794
FACILITY_NAME
CIRCLE K STORE #5643*
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
02
SITE_LOCATION
1502 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\1502\PR0231082\COMPLIANCE INFO 1998 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 1998 - 2008
QuestysRecordDate
8/9/2017 8:52:33 PM
QuestysRecordID
72797
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM DRAWING INFORMATION <br />1.✓ <br /># I <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />2. <br />"✓ <br />Plans drawn to scale in non -erasable print. <br />3. <br />✓ <br />Plot plan to show Location of tanks and all associated piping. <br />4. <br />✓ <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />5. <br />a <br />Tank cross-sectional diagram. <br />6. <br />✓ <br />Detail of tank, associated piping, excavation and cover. <br />7. <br />LDMp- <br />Tank(s) and piping approved by a nationally recognized independent testing organization. (Title 23, Chapter 16, <br />6.a�nR <br />Article 3, Section 2631 (b) 8 26351 <br />8. <br />_✓ <br />Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />9. <br />_✓ <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10.✓ <br />At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br />CORROSION PROTECTION <br />secondary (2') containment systems before covering. (Section 2635 (a) (3) 6 (4)). <br />11. <br />Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br />U.L. LISTED <br />submitted directly to PNS-EHD from the testing company or owner of facility. (Health 8 Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (h)) <br />12-ixii+.TANK <br />COMPOSITION Ai re.vbinl <br />TANK # <br /># I <br /># 2 <br /># �( <br /># <br /># <br />CAPACITY <br />121 01%> <br />12,E <br />�Z�Q7L7 <br />MANUFACTURER <br />1 Yarm WeR <br />FtOem WeU. <br />HeJe'l'l kl,-• <br />COMPOSITION <br />LDMp- <br />C.9Mp• <br />6.a�nR <br />MODEL <br />PRODUCT <br />Eel. Lni. <br />—eup. ani, <br />Gkesal <br />CORROSION PROTECTION <br />pRP <br />U.L. LISTED <br />COMPAT181LITY WITH 100% <br />METHANOL <br />YI.S <br />13.n1a TANK(s) TO BE INSTALLED eXIyT1VH%1 to re'vvmy, <br />A- Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />H. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space - <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non -clad steel tank (Section 2635 (a) (2) (AA <br />(1) Cathodic protection provided for entire tank, piping and components (ruts, bolts, washers, <br />etc.). <br />(2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) impressed current systems to be inspected no less than every 60 days. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.