My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
308
>
2300 - Underground Storage Tank Program
>
PR0231085
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:33 PM
Creation date
11/4/2018 4:09:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231085
PE
2381
FACILITY_ID
FA0003520
FACILITY_NAME
DENS AUTO REPAIR INC
STREET_NUMBER
308
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
149063301
CURRENT_STATUS
02
SITE_LOCATION
308 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\308\PR0231085\REMOVAL 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 . Site work concrete fully supported on earth and <br /> concrete where no special hazard exists. <br /> ( ) 2. BOLTS INSTALLED IN CONCRETE: Prior to and during the <br /> placement of concrete around bolts when stress increases <br /> permitted by Footnote No. 5 of Table No. 26-E or Section <br /> 2624 (b) are utilized. <br /> ( ) 3 . SPECIAL MOMENT-RESISTING CONCRETE FRAME: As required by <br /> Section 2625 (j) of this code. <br /> ( ) 4. REINFORCING STEEL AND PRESTRESSING STEEL TENDONS: <br /> A. During all stressing and grouting of tendons in <br /> prestressed concrete. <br /> B. During placing of reinforcing steel and <br /> prestressing tendons for all concrete required to <br /> have special inspection by Item 1. <br /> EXCEPTION: The special inspector need not be present <br /> continuously during placing of reinforcing steel and <br /> prestressing tendons, provided the special inspector has <br /> inspected for conformance with the approved plans prior <br /> to the closing of forms or the delivery of concrete to <br /> the jobsite. <br /> ( ) 5. WELDING: <br /> A. SPECIAL MOMENT-RESISTING STEEL FRAMES. As required <br /> by Sections 2710 (g) and 2711 (e) of this code. <br /> B. All structural welding, including welding of <br /> reinforcing steel. <br /> EXCEPTIONS• <br /> 1. When welding is done in an approved fabricator's <br /> shop. <br /> 2. When approved by the building official, single-pass <br /> fillet welds when stressed to less than 50 percent <br /> of allowable stresses and floor and roof deck <br /> welding and welded studs when used for structural <br /> diaphragm or composite systems may have periodic <br /> inspections in accordance with Section 306 (e) of <br /> this code. For periodic inspection, the inspector <br /> shall check qualifications of welders at the start <br /> of work and then make final inspection of all welds <br /> for compliance prior to completion of welding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.