My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
308
>
2300 - Underground Storage Tank Program
>
PR0231085
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:33 PM
Creation date
11/4/2018 4:09:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231085
PE
2381
FACILITY_ID
FA0003520
FACILITY_NAME
DENS AUTO REPAIR INC
STREET_NUMBER
308
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
149063301
CURRENT_STATUS
02
SITE_LOCATION
308 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\308\PR0231085\REMOVAL 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( ) 6. HIGH-STRENGTH BOLTING: As required by U.B.C. Standard <br /> No. 27-7. <br /> EXCEPTION: The special inspector need not be present <br /> during the entire installation and tightening operation, <br /> for shear/bearing-type connections when threads are not <br /> required by design to be excluded from the shear plane, <br /> provided that prior to the start of bolting, the surfaces <br /> and the bolt size and type are inspected for conformance <br /> to plans and specifications. Additionally, at the <br /> completion of all bolting, the inspector shall determine <br /> that the plies have been brought into snug contact. <br /> ( ) 7. STRUCTURAL MASONRY: During preparation of masonry wall <br /> prisms, sampling and placing of all masonry units, <br /> placement of reinforcement, inspection of grout space, <br /> immediately prior to closing of cleanouts, and during all <br /> grouting operations. <br /> EXCEPTIONS• <br /> 1. Special inspection need not be provided when design <br /> stresses have been adjusted to permit noncontinuous <br /> inspection. <br /> 2. For closed-end hollow-unit masonry where the f'm is <br /> no more than 1,500 psi for concrete units or 2,600 <br /> psi for clay units and cleanouts are provided at <br /> the bottom course of every grout pour at each <br /> vertical bar, special inspection for placing of <br /> units may be performed on a periodic basis in <br /> accordance with Section 306 (e) . <br /> 3. For open-end hollow-unit masonry where cleanouts <br /> are provided at the bottom course of every grout <br /> pour at each vertical bar, special inspection for <br /> placing units may be performed on a periodic basis <br /> in accordance with Section 306 (e) . <br /> ( ) 8 . REINFORCED GYPSUM CONCRETE: When cast-in-place Class B <br /> gypsum concrete is being mixed and placed. <br /> ( ) 9 . INSULATING CONCRETE FILL: During the application of <br /> insulating concrete fill when used as part of a <br /> structural system. <br /> EXCEPTION• <br /> The special inspections may be limited to an initial <br /> inspection to check the deck surface and placement of <br /> reinforcing. The special inspector shall supervise the <br /> preparation of compression test specimens during this <br /> initial inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.