Laserfiche WebLink
SITE HEALTH AND SAFETY PLAN <br /> PROJECT: Den's Auto Repair PROJECT NO.: <br /> STREET ADDRESS: 308 S. El Dorado,Bld. A, Stockton, CA 95203 <br /> A. ONSITE ORGANIZATION AND COORDINATION <br /> Project Team Leader: Tom Shephard, Jr. <br /> Site Safety Officer: Tom Shephard,Jr. <br /> Field Team Officer: Mark Lakeman <br /> Field Team Members: Kevin Smith <br /> Sub Contractor: Lodi Backhoe, Stokley Construction, San Joaquin Steel,Huskey Crane <br /> B. ONSITE CONTROL <br /> Tom Shephard Jr. has been designated to coordinate access control <br /> and security onsite. No unauthorized person should be within this exclusion area. <br /> C. HAZARD EVALUATION <br /> The following substance(s)or hazards are known or suspected to be on site. <br /> Gasoline <br /> Waste Oil <br /> Dry Ice <br />