My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO 2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
11/4/2018 4:35:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\COMPLIANCE INFO 2012-2015.PDF
QuestysFileName
COMPLIANCE INFO 2012-2015
QuestysRecordDate
5/19/2017 9:21:29 PM
QuestysRecordID
3390491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> 5. Secondary Pipe Testing <br /> Test Method Developed By: ❑Tank Manufacturer 0Industry Standard ❑Professional Enqineer <br /> Test Method Used: ❑x Pressure ❑vacuum ❑ Hydrostatic <br /> Test Equipment Used: Nitrogen/Gauges Equipment Resolution: <br /> Piping Run# 87M Piping Run# 87S Piping Run# 91 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer. Smith Smith Smith <br /> Piping Diameter. 3"/2" 3"12' 3"12" <br /> Length of Piping Run: 45' 8' S5" <br /> Product Stored: UL 87 Gas UL 87 Gas UL 91 Gas <br /> Method and location of piping-run Pressurized at Turbine Pressurized at Turbine Pressurized at Turbine Pressurized at Turbine <br /> isolation: Sump Sump Sump Sump <br /> Wait time: 15 min 15 min 15 min 15 min <br /> Test Start Time 9:45 10:16 10:25 <br /> Initial Reading(psi): 5 PSI 5 PSI 5 PSI PSI <br /> Test End Time: 10:45 11:15 11:25 <br /> Final Reading(psi): 5 PSI 6 PSI 5 PSI PSI <br /> Test Duration(hh:mm): 01:00 01:00 01:00 01:00 <br /> Change in Reading(psi): 0.0 0.0 0.0 0.0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 0 <br /> Test Result: ®Pass O fait ® Pass O Fail ® Pass O Fail *Pass O Fail <br /> Comments:87s is a syphon line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.