My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:22 AM
Creation date
11/4/2018 4:35:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\BILLING 2012-2015.PDF
QuestysFileName
BILLING 2012-2015
QuestysRecordDate
5/19/2017 9:44:43 PM
QuestysRecordID
3390673
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•UNIFIED PROGRAM CONSOLIDATED FOT <br /> UNDERGROUND STORAGE TANK <br /> TYPE OF ACTIONI.NEW MONITORING PLAN-(pa e I of 2) <br /> ❑ W pl,gN <br /> PLAN TYPE ® 2.CHANGE OF INFORMATION <br /> ® L MONITOR WG IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) 4941 <br /> ❑ 2.THIS PLAN COVERS ONLY THE FO`11 W WG UST SYSTEM(. <br /> 490-z <br /> FACILITY ID#(Agency Use Only) I• FACILITY INFORMATIONr <br /> BUSINESS NAME(Same as FACR,IT(NAME)Valero#3698 - <br /> BUSINESSSITP_ADDRESS4 3 4 3 I <br /> 153 E. ]1 Street 3. <br /> m3. CITY Tracy <br /> Testing, II.EQUIPMENT TESTING AND PREVE nw. <br /> g preventive name an, and calibration of monitorin N�'IVE MAINTENANCE <br /> specified by Ole equipment manufacturers'instructions,or annually,whlichever is more frequent,and that such work must bes[ be Pb <br /> g,sensors, robes,line lath detectors, etc.) musl be Ixlfonned at the frequenc <br /> _(23 CCR§2632,2634_2638.2641)------------ <br /> MONITORING EQUIPMENT IS SERVICED --- ------ Performed l. <br /> _- -_-_ _, -__-_--_____-_____-_-_-,-__-_-__ ____--__ y qualified personnel. <br /> ® I.ANNUALLY ---- <br /> ❑ 99.OTHERS cif _________________-_--____ <br /> 6 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS POLANTO(]2 $�•O LOT PLOAN/MAp pREVIOUSLY SUBMITTED. (23 CCR§2632490-3a <br /> 490-3h <br /> 2634)4)0-a <br /> IV. TANK MONITORInG IS PERFORMED USING THE FOLLOW <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT avo-s <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) ING METHOD(S): <br /> --__-____--_SECONDARY CONTAWMENT IS_ _-_-_- _ _ <br /> _PANEL MANUFACTURER: Gllbazc0® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM ay0-e <br /> LEAK SENSOR MANUFACTURER: Veeder Root ------------___- -___________._a90-z_f__-_-____-____-__-_----_______-_- -___----___-__-_ <br /> - MODEL#: EMC <br /> .AUTOMATIC TANK GAUGING 49°-9. teas <br /> PANEL MANUFACTURER; (ATG)SYSTEM USED TO MONITOR SINGLE WAL-S�X23 CCR§2643)420 ----10 <br /> -___----_----_-_--_-_---.-- ___--_------------_-_-_-__ <br /> IN-TANK PROBE MANUFACTURER- ----------------------------------'--' 490-12. 49 ii <br /> _.-_-_-----------------_________MODEL#__-_--_--_-_-_--__-_--__-_---------_-__-_________-__--___ <br /> -------___-----__--_-- _---_----_- --_- -_- 490-13 <br /> LEAK TEST FRE UENCY: ____------__ q90-la" <br /> Q ❑ a.CONTINUOUS -'-`----- _ MODEL#(S} <br /> -_--_-----___-__-_ 490.15 <br /> ❑ It. <br /> - <br /> /NIGHTLY ----❑ <br /> . 4416-_.-_-_---- cWEEKLY <br /> PROGRAMMED TESTS: - - ---'------------------------0 e_OTHER(Specif <br /> g'p' ❑ b.0.2 ------`------------------ <br /> ❑ 3.MONTHLY STATLSTICAL ( g'p'h' ❑ c.OTHER(Specify): -------'----'---490 17 <br /> -------- <br /> INVENTORY RECONCII,IgTION 23 CCR§2646.1): 494 18 <br /> ❑ 4.WEEKLY a9a 19 <br /> MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: 490-20 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY 490-z2 <br /> ❑ c.OTHER(Specify): 490-23 <br /> ®99.OTHER S 490-24 <br /> ( pacify): 36 month secondary containment testing 490-25 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLO WING METHODS Check all that apply) 490-26 <br /> I.CONTINUOUS MONITORING OF PIPE/PIPING SUMPS)AND OTHER SECONDARY CONI AINMENT(WITH AUDIBLE AIND PP Y) 490-2 <br /> 490-28 <br /> VISUAL ALARNLS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-z9 <br /> PANEL MANUFACf_U_R_ER_:Gilbarc0 <br /> _- 49030 MODEL#: EMC 490-31 <br /> LEAK SENSOR MANUFACTURER: Veeder R_O_Ot ___ - ____-_--____-____-__. <br /> -------- -----_----- ___ ______�MODEL#(S): 208 49<133 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURB WE)SHUTDOWN. <br /> FAILURE/DISCONNECTION OFTHEMONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN, ®a.YES ❑b.NO 490-34 <br /> ® 2.MECHANICAL LINE LEAK DETECTOR MLLD ❑b.NO 49035 <br /> ( )THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK TS DETECTED(23 CCR§2636) <br /> MLLD NIANUFACTURER(S);Red Jacket -____----490-3_-______--__-______-_-_____ ________________________ 490-36 <br /> - <br /> MODEL#(S): FX-1V 490-38 <br /> ❑ 3_ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 49039 <br /> ELLD MANUFACTURER(S) - --0-40. <br /> 490-40. (____-_--__--_--______--_-_______-_________--_-----_-- <br /> ____--__- _-_--__-_____.__-_-_--___--____-___ -------------------- <br /> MODEL#(S): 49n-4i <br /> PROGRAMMED IN LINE LEAK TEST: ❑ I.M W IMUM MONTHLY 0.2 ------M- ---'-----_- -_ AL 0.1 g.p.h. --- <br /> ❑ 2.MINIMUM ANNUAL 0.1 ---------_------- ------- <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN, g'ph' a9nrz <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-43 <br /> ® 4.PIPE INTEGRITY TESTING a9ors ❑a.YES ❑b.NO 490-44 <br /> TEST FREQUENCY M a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ C.OTHER(Specify) <br /> ❑ S.VISUAL PIPE MONITORING. 490-46490-41 <br /> +FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED• 490-48 <br /> AllowoJ for monilorin•ofunborieJ emer eM urenmr fuel iVn onl •f.IN pM,)," TH)(3 gyagg <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. <br /> 7.NONREGULATED PIPING PER HEALTH AND SAFETY:CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM 490 in <br /> 490-51 <br /> ❑ 99.OTHER(Specify) <br /> ago-S2 <br /> 490-S3 <br /> UPCF UST-D(12/2007)1/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.