Laserfiche WebLink
�NIFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD <br /> ❑ L CONTINUOUS ELECTRONIC MONITORING ® 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> DISPENSERS 49as4a <br /> _____ _ -__.____-_______________ _______ 490-546 <br /> PANEL MANUFACTURER;99.OTHER(Specify): ALONE <br /> LEAK SENSOR MANUFACTURER:Bravo 49ass T----'-EL#--------------______-__-__ <br /> MODEL#: <br /> DETECTION OFA LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ago s] 11 T ____________ ______ a90-ss. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN MODEL#(S):Boat&chain <br /> ____.__ <br /> 49x58 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. El❑ a YES ®b.NO 490-59 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES ®b.NO 49a6o. <br /> 2•UDC CONSTRUCTION IS ❑ a.YES ®b.NO 4vo62 <br /> ®I.SINGLE-WALLED ❑2.DOUBLE- ® a.YES ❑b.NO <br /> IF DOUBLE WALLED: WALLED 49a6z <br /> _____U 9INTERSTITIAL SPACE IS MONITORED BY_ 490-63 <br /> A LEAK WITHIN THE SECONDARY CONTAINME OOF TQHEIUDI❑TRIGCERS AUDIBLE AND VISUAL ALARMS <br /> _ —--------------2.PRESSURE------ <br /> OF 3_VACUUM x90-644 <br /> Sy <br /> I. ELD TESTING: THIS FACILITY HAS BEEN OTIFE pRgOg STATE WATER <br /> TESTINGSURCES CONTROL BOA❑aTHAT EO ANCED age-Esn <br /> _--____LEAK—ON!FEDI MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR ANCF1) <br /> _ 2.S ECONDARY CONTAINMENT CO <br /> __ MPONENTS ARE TESTED EVERY 36 MONTHS, <br /> ®3.SPILL BUCKETS ARE TESTED ANNUALLY -----___________------__ <br /> __--------------------------- ---------------------------------49066 <br /> ®The following monitoring/maintenance records are kept for this facVIII.RECORDKEEPING x99.67 <br /> ❑Alarm logs 490-68a ❑Visual Inspection Records 49-- <br /> SIR testing results(and supporting documentation records). 49169d <br /> 0,68h 0 Tank integrity testing results a9a6gc <br /> ®ATG TesKng results(and Supporting documentation records).4906gf ❑ Tank gauging results(and Supporting <br /> ®Equipment maintenance and calibration records, 49arec ❑ Corrosion Protection 60-day og496egcumentation records). 49a6gc <br /> ®Personnel with UST monitoring responsibilities are famIX.TRAINING <br /> iliar with all of the following documents <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) relevant to[heirjob duties. 490-694 <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)4%.69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)ago-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-691 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49a69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ S WRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M691L M69i <br /> This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Opera on of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.49a70 <br /> X. COMMENTRADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on pecific monitoring procedures are attached to this plan,490-71The Gilb-0"afm th an'in 9p1 of tank W-'ty w hon exienalI .and light. s <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible forensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> xa%:n/�.,a�"rs,a�.n cw.d."Gons rharindica(c a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Ja tau-Gill <br /> NAME Don Marcetti a9uax TITLE Mana er <br /> x90-]4 TITLE Area Manager 490]3 <br /> The Designated Operator shall perform a monthly visual inspection of[he facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE <br /> 490-76 DATE: <br /> R„ r wa i/a7/11 490-]] <br /> APPLICANT NAME 3 �° t w <br /> (print): 490-78 <br /> Sandy Huff APPLICANT TITLE: 490.79 <br /> Compliance Coordinator <br /> UPCF UST-D(12/2007)213 <br />